Buy
Sell
Share Name Share Symbol Market Type Share ISIN Share Description
Kodal Minerals Plc LSE:KOD London Ordinary Share GB00BH3X7Y70 ORD 0.03125P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.005 -2.04% 0.24 0.23 0.25 0.25325 0.24 0.25 24,570,974 11:55:24
Industry Sector Turnover (m) Profit (m) EPS - Basic PE Ratio Market Cap (m)
Mining 0.0 -0.6 -0.0 - 41

Kodal Minerals Share Discussion Threads

Showing 23626 to 23646 of 24725 messages
Chat Pages: Latest  953  952  951  950  949  948  947  946  945  944  943  942  Older
DateSubjectAuthorDiscuss
09/12/2021
21:49
Not at all. I went through all this with GGP. Its obvious a dfs will need to be completed. The difference you believe is it has to be 'outsourced' they are never independent. Wise up.
dz30700
09/12/2021
20:21
example of not inhouse "OR ANOTHER REPUTABLE ENGINEERING FIRM" More Definitions of Definitive Feasibility Study Definitive Feasibility Study means a comprehensive technical and economic study of the selected development option for the Holbrook Project, from TetraTech or another reputable engineering firm, in which all geological, engineering, operating, economic and other relevant factors are considered in sufficient detail to demonstrate at the time of reporting that extraction is reasonably justified (economically mineable). Mining, infrastructure and processing plans will be completed with sufficient rigor such that capital and operating cost estimates could reasonably serve as the basis for a decision for the finance of the development of the Holbrook Project for mineral production. Definitive Feasibility Study in relation to a Project, a comprehensive document or documents that addresses all matters which are customarily required for an effective assessment of the viability of the development and mining of Minerals in, on or under the relevant Project Area, in such form and detail as may be required for the purposes of enabling the Board to reach the Decision to Mine or Decision not to Mine, as the case may be, and which shall include (but is not limited to) appropriately detailed information and data in respect of the following issues: ownership, location, geology and ore reserves, metallurgy, mining, materials handling, processing, ancillary facilities and site services, infrastructure for and availability of labour, energy supply, water, environmental impact studies and rehabilitation obligations, capital costs, costs to be incurred to sustain production including initial working capital, the time and critical path to place a mine or mines into production and financing requirements throughout the construction phase, financial analysis (including price sensitivity analysis) assumptions as to mineral prices and utilisation of a discount rate consistent with financing costs at the time as well as project and country risks “Companies Act” the Companies Act, No. 61 of 1973 (as amended) Come on guys, admit you were wrong!
dazaliam
09/12/2021
20:11
Detailed feasibility Detailed feasibility studies are the most detailed and will determine definitively whether to proceed with the project. A detailed feasibility study will be the basis for capital appropriation, and will provide the budget figures for the project. Detailed feasibility studies require a significant amount of formal engineering work, are accurate to within 10-15% and can cost between ½-1½% of the total estimated project cost.[1]
dazaliam
09/12/2021
20:03
here's a reminder: Daz423 Posts: 2,166 Price: 0.2975 No Opinion Even if1 Dec '21 A deal doesnt come directly for kodal imminently. ffx are clearly building the infrastructure on our door step....All of it. MOU in place. Always a chance ffx may at a later date may even make a move on KOD dfs dependent. lol credibilty shot now go do your homework kiddo
dazaliam
09/12/2021
19:59
hey 423 didnt you recently post that there would be no funding until dfs? lol you agree with me
dazaliam
09/12/2021
19:55
hush child, try talking stock or go to bed
dazaliam
09/12/2021
19:44
Shut up daza
dz30700
09/12/2021
10:20
What verified by a 3rd party? So they will need to do another 3rd party FS?
onlyking
09/12/2021
10:12
if vefified
dazaliam
09/12/2021
10:07
What makes you so confident of this? Does the consultants not add some value to it?
onlyking
09/12/2021
09:43
who will fund based on Bernies fs?0
dazaliam
09/12/2021
09:27
Hi Dazaliam, I am confused now. You're confident this FS being undertaken by Kodal will be bulls*it and not allow us to attract funding? If the FS is all sounding great and they wan to go ahead and mine will that help the Share price above 0.50p?
onlyking
09/12/2021
09:10
lol hush child
dazaliam
09/12/2021
07:53
£2000 bet bougini goes to production. We can exchange email on twitter you follow me no further details needed. All words otherwise. If your absaloutely adamant this will fail. Easy money right ? Money where your mouth is or zip it.
dz30700
09/12/2021
07:28
Thanks for the reply and info Surely Kodal know this? So you think after the 6 months is up and their own FS study is complete then they will need a new 3rd party one before attracting/securing funding? "As a next step, Kodal has commenced a programme of work to update the Feasibility Study announced in January 2020 ahead of securing funding for mine development and construction. The programme has a six-month time estimate" "We are looking forward to the construction phase of this project and we are confident of achieving support to finance the capital required for our target of development of the first lithium mine in Mali. I look forward to providing further updates on our progress in due course."
onlyking
09/12/2021
04:45
onlyking, no. Ausenco completed a pfs in 2018. As for consultants, no! It still all goes back to kodals interpretation of their studies so biased and unusable for funding.
dazaliam
09/12/2021
00:17
"We are using the best consultants with recent lithium experience." Does that not count for anything? Consultants will be 3rs party?
onlyking
08/12/2021
23:29
Dazza Didn't gangfeng JV with FFX without a 3rd party FS??
onlyking
08/12/2021
21:38
Shut up daza
dz30700
08/12/2021
19:54
if kodal upped there throughput to 4Mtpa theyd have a LOM of 4.25 yrs
dazaliam
08/12/2021
18:00
A market capitalisation of 39 million? Doesn’t that feel a little overvalued?
guy gibson
Chat Pages: Latest  953  952  951  950  949  948  947  946  945  944  943  942  Older
ADVFN Advertorial
Your Recent History
LSE
KOD
Kodal Mine..
Register now to watch these stocks streaming on the ADVFN Monitor.

Monitor lets you view up to 110 of your favourite stocks at once and is completely free to use.

By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions

P: V: D:20220701 01:14:20