ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

KENV Kennedy Venture

4.625
0.00 (0.00%)
07 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Kennedy Venture LSE:KENV London Ordinary Share GB00B830HW33 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 4.625 4.50 4.75 - 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Kennedy Venture Share Discussion Threads

Showing 1901 to 1924 of 2250 messages
Chat Pages: Latest  78  77  76  75  74  73  72  71  70  69  68  67  Older
DateSubjectAuthorDiscuss
03/7/2017
09:41
With the recovery rising from 50% to 70% not sure what this will equate to in MT of tantalum per month as the throughput will still be 150,000T of ore but if it rises to 16MT per month then profits would be

There are 2204 lbs per Metric Ton x 16 = 35264 lbs

35264 lbs x $40 = $1,410,560.00 (£1,085,387.00)
35264 lbs x $35 = $1,234,240.00 (£949,829.00)
35264 lbs x $30 = $1,057,920.00 (£814,201.00)

grsl
03/7/2017
09:40
Clarke reported in a presentation in December, tantalum had risen from $50 per lb to just under $70 per lb in December. And there have been suggestions from what ought to be well-informed sources that Kennedy has a generous margin of $30 to $40 per lb.

There are 2204 lbs per Metric Ton x 15 = 33060 lbs

33060 lbs x $40 = $1,322,400.00 (£1,017,624.00)
33060 lbs x $35 = $1,157,100.00 (£890,362.00)
33060 lbs x $30 = $991,800.00 (£763,167.00)

grsl
02/7/2017
19:50
Six additional shaker Tables have been successfully installed and are operational, bringing the total up to eight shaker tables on site and running in the plant circuit. These tables remove impurities and increase Tantalum recoveries above 70% (previously c.50%)Very significant imo!Recovery up almost by 50%
spudtheplumber
01/7/2017
12:03
we are stockpiling lithium ore via tantalite tailings* and lepidolite mineral veins. also someone commented on lse bb, the company chose to publish the minimum grade [why not the highest?],

'The Lithium project continues to advance with the completion of the third party SGS lab report showing grades from the initial bulk sampling above 1.5%'

our lithium grading starts at 1.5% and goes up to .......

[*recall dec, the plan was in q1 to insert into the production line, equipment to separate the lithium mica out of the homestead ore]

wrtmf
30/6/2017
23:29
1 rns with the title 'full scale production at tantalite valley mine'
different share price outcome, imho.

wrtmf
30/6/2017
21:38
had to head off for work approx 8:10 so wasn't in a position to say. i feel better after the amendment.

the original release suggested larry's commentary was written some time ago...

'as Aftan aims for full scale commercial production in Q2 2017'

well, its the last day of q2, so are we or are we not at full scale production? additionally, i felt, after numerous rns referencing 10,000 or 15,000 t/m ore through put, why didn't they say where we are now?

good to see the amendment - put a lot of questions to bed - water conservation, fine ore circuit, milling circuit [and assumed 15000 throughput for 15 t concentrate per month].

happier now.

'Aftan having now reached full scale production'

wrtmf
30/6/2017
12:27
buyers returning it looks like IMO
qs99
30/6/2017
12:04
Amazing potential.. Figures and full scale soon
letmepass
30/6/2017
09:54
Expect KENV to rise at latest news. Prospects and progress improving etc.
geoff80
30/6/2017
08:14
looks like we are into September until JORC then by the looks of things, but maybe as they say that will provide further potential upside (or they haven't found enough and need to spread the search to a cynic?)....production news seems good, but would have been good to have some numbers! DYOR
qs99
30/6/2017
08:07
i would have liked more detail on what sgs had to say on metallurgy, what else they were able extract, the simplicity/complexity of process.

stockpiling - suggests we can still be the first lithium producer on aim...

wrtmf
30/6/2017
07:58
Hey up,up.....
birotop
30/6/2017
07:57
Nice RNS, Well, I'm as happy as Larry.
theclangers
30/6/2017
07:45
i'm not a mineral consultant, but i could have told the company it would need to trench/core to get a jorc [lithium].

looking good on tantalite side and revenue generation which is ultimately the point of the business!

wrtmf
30/6/2017
07:45
Mike I sent you a mail re DFX
a2584728
30/6/2017
07:29
Nope.. I copied it from adfvn news this morning.
113mike
30/6/2017
07:28
Mike did you get e mail?
a2584728
30/6/2017
07:14
All looking good...imhoRNS Number : 6691JKennedy Ventures PLC30 June 201730 June 2017Kennedy Ventures plcInvestee Company Operational UpdateKennedy Ventures plc ("Kennedy Ventures" or "the Company"), the AIM quoted investment company who, through its stake in African Tantalum (Pty) Limited ("Aftan"), has an interest in the Tantalite Valley Mine in Namibia ("TVM"), is pleased to provide an operational update from TVM.Highlights:-- Following a successful visit to TVM by a leading manufacturer of tantalum capacitors (the "Customer") the Company booked its first sales from its shipment to the Customer of its high grade 48% Ta205, one of the highest grades reported from Tantalum mines globally. Further purchase orders have followed the first.-- Six additional shaker Tables have been successfully installed and are operational, bringing the total up to eight shaker tables on site and running in the plant circuit. These tables remove impurities and increase Tantalum recoveries above 70% (previously c.50%)-- Negotiations with the Miners Union have been highly successful and are now complete, increasing the working hours per day from 12 to 16-- A Plant Preventative Maintenance Program study has been started aimed at increasing run time efficiencies through the establishment of Statistical Process ControlsAftan's Mine OperationFollowing the plant upgrades TVM now produces Tantalum to the highest specification to meet our Customer's demands as well as importantly meet the requirements under the Dodd Frank Act. Further successful meetings with the Customer has resulted in continued purchase orders in addition to sampling that has been distributed further into the supply chain. Aftan anticipates being in a position to execute a full long term Customer agreement over the coming months.The Lithium project continues to advance with the completion of the third party SGS lab report showing grades from the initial bulk sampling above 1.5%. A site visit took place with the MSA Group who are producing the JORC report and it was determined further core sampling was required to allow an extended look at a much larger area to include the Homestead resources. This is very positive as this extends the potential lithium resource and assesses the Homestead which the Company is already mining Tantalum from, with stock piling of Lepidolite taking place from various visual veins. Aftan will continue reporting as further necessary data is compiled over the coming months.Larry Johnson, CEO of Kennedy Ventures, commented:"Aftan has made considerable progress in the year to date and is now in a position of strength both at the operational level and with onward sales. Aftan is confident that its product will meet the Customer's quality and specification tests and its work this calendar year means Aftan is now firmly positioned within a world-class supply chain. The efforts by Aftan over the last 6 months, together with Kennedy's consultation, to upgrade TVM's operations will deliver optimised output and product quality, as well as to ensure the TVM is operating efficiently and cost effectively. In turn, we expect this will deliver value creation in the near and long term as Aftan aims for full scale commercial production in Q2 2017.We are very pleased with Aftan's continually strengthening relationship with the Namibian Miners Union. The extended hours allows Aftan to better utilise its labour force, 99% of whom are Namibian, and provide for more wealth creation amongst the local community."
113mike
30/6/2017
07:09
That all sounds rather bullish. Would have liked to see some numbers. It otherwise rather happy to hold and add
a2584728
29/6/2017
11:05
last 2 trades, full offer paid at 11p...
wrtmf
29/6/2017
10:37
Looks a little more convincing IMO
qs99
29/6/2017
10:27
Want a bit more "up" but hey..
qs99
29/6/2017
10:26
Hey up....
birotop
28/6/2017
18:16
not convinced by vol, tailed off, didn't even get over a million in the end
[if its nearly 250k after 1st 1hr, looking for 1.5-2m for the day]

looking forward to tomorrow and an update by monday... last meaningful update 27mar, a quarter of a year ago!

wrtmf
Chat Pages: Latest  78  77  76  75  74  73  72  71  70  69  68  67  Older

Your Recent History

Delayed Upgrade Clock