ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

GEO Georgian Mining Corporation

1.40
0.00 (0.00%)
17 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Georgian Mining Corporation LSE:GEO London Ordinary Share VGG9688A1003 ORD NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 1.40 1.30 1.50 - 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Georgian Mining Share Discussion Threads

Showing 1626 to 1645 of 3950 messages
Chat Pages: Latest  74  73  72  71  70  69  68  67  66  65  64  63  Older
DateSubjectAuthorDiscuss
15/3/2018
08:46
They already had a memorandum of understanding. This should have been followed by a

binding agreement or an announcement that the talks had ended in failure. I

see the market is punishing them severely for this - and rightly so. They'll salami-

slice every aspect of a mining operation and release an RNS saying a memorandum of

understanding has been reached. Next up will be a MOU on the weekly contributions for

the office tea club.

5trelok
15/3/2018
08:30
The Russians have us over a barrel - There is nothing we can do except get shafted (imo) Bargepole comes to mind - or else the resource is lenticular and significant amount of waste needed to be removed to access the higher grades - requirement for extra drilling almost suggests that this might be the case.
pugugly
15/3/2018
08:24
Greg needs to go, get someone with balls to deal with these Russians
gkp heros
15/3/2018
08:23
Shocking... time for new management
Shareholders need to revolt

saw89
15/3/2018
08:16
Very disappointing update given the length of time that has passed.

Real potential value in the assets here but the management just don't seem that interested in pushing the company forwards - I suspect this is largely because GEO isn't their day job.

2lb
15/3/2018
08:12
I reckon it will be 4 months work at most. They're not starting from scratch.
Drilling will take 2 months as stated in the RNS and the other items will be carried out in parallel. Preliminary feasibility studies have already been completed.

sclper
15/3/2018
08:10
Directors talk.
rampair
15/3/2018
08:07
But that 2 years away because of...

The initial phase, mining and processing of the gold oxide ore from GZ2, is subject to and conditional upon completing:

-- Additional in-fill drilling at GZ2, and a final Resource estimate compliant with the JORC (2012) Mineral Resource Reporting Code;

-- Bulk sampling and additional metallurgical testwork;

-- A positive Feasibility Study (including an agreed mine plan and design) into the mining and processing of the Ore;

-- Obtaining additional permits relating to GZ2 extraction, such as an environmental permit, construction permits, etc (note the License already includes permission for mining); and

-- Signing of the final MPA and any associated additional contracts between the Parties to give effect to mining and processing the Ore.

sleveen
15/3/2018
08:06
This'll finish red.
the deacon
15/3/2018
08:03
this will move up from here, drop from 27p well overdone.

see a bounce to 15p short term

ssrover
15/3/2018
07:59
Use some common sense. We were waiting for a signed agreement. Google MoU. This has not advanced proceedings since December statement.
artyth2
15/3/2018
07:27
Still significant time away from meaningful production. Initial processing will be gold ore only. Lots of regulatory hurdles. Wouldn't surprise me to see a raise next.
the deacon
15/3/2018
07:15
Any processing and hence cash generation is at least 18 months and probably 2 years away, given all the conditions to be satisfied before processing occurs. The biggie being the FS:

The Parties have agreed that the Ore from KBE will be mined and then hauled and processed at one of RMG's processing plants. The initial phase, mining and processing of the gold oxide ore from GZ2, is subject to and conditional upon completing:

-- Additional in-fill drilling at GZ2, and a final Resource estimate compliant with the JORC (2012) Mineral Resource Reporting Code;

-- Bulk sampling and additional metallurgical testwork;

-- A positive Feasibility Study (including an agreed mine plan and design) into the mining and processing of the Ore;

-- Obtaining additional permits relating to GZ2 extraction, such as an environmental permit, construction permits, etc (note the License already includes permission for mining); and

-- Signing of the final MPA and any associated additional contracts between the Parties to give effect to mining and processing the Ore.

sleveen
13/3/2018
20:38
5trelok-You have posted 50% of last 12 posts. You obviously have a problem which I don't think anyone here can fix!!
teemore
13/3/2018
17:31
Oh dear. I'll leave it up to any impartial observers to draw their own conclusions.
5trelok
13/3/2018
17:27
Great day! Geo 2% up and 5trelok admits defeat!!I'll sleep well tonight!!
seanlander
13/3/2018
17:27
Georgian Mining
noirua
13/3/2018
17:26
I thought you had me filtered? If I agreed it was a buy, I wouldn't be forwarding it

to the FCA. I'm still waiting...

5trelok
13/3/2018
17:20
Glad you agree it was a buy! Lol
seanlander
13/3/2018
17:10
Well, if he ever does post a photo of that buy, I'll be forwarding it, post-haste, to

the FCA.

5trelok
Chat Pages: Latest  74  73  72  71  70  69  68  67  66  65  64  63  Older