ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

BRES Blencowe Resources Plc

5.50
0.25 (4.76%)
09 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Blencowe Resources Plc LSE:BRES London Ordinary Share GB00BFCMVS34 ORD 0.5P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.25 4.76% 5.50 5.20 6.00 5.60 5.06 5.25 713,058 16:35:09
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Offices-holdng Companies,nec 0 -1.4M -0.0067 -8.36 11.73M

Blencowe Resources PLC Drilling Results at Camp Lode (2866O)

08/02/2021 7:07am

UK Regulatory


Blencowe Resources (LSE:BRES)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Blencowe Resources Charts.

TIDMBRES

RNS Number : 2866O

Blencowe Resources PLC

08 February 2021

8 February 2021

Blencowe Resources Plc

("Blencowe" or the "Company")

Blencowe Confirms Near Surface Ultra High-Grade Graphite Zone at Orom-Cross Project

Blencowe Resources Plc ("Blencowe" or "The Company") (LSE: BRES) is pleased to announce exceptional high-grade drilling results from the Camp Lode deposit, which will now be incorporated in the broader maiden JORC Mineral Resource and Reserve Estimate at its 100% owned Orom-Cross graphite project in Uganda.

Highlights (TGC - total graphite content)

   --    Drilling at Camp Lode has delivered outstanding high grade graphite results including: 

o OREA-L102, 25 metres at 9.7% TGC from 5 metres including 4 metres at 12.7% TGC

o OREA-L202A, 6 metres at 12.2% TGC from surface including 2 metres at 20.9% TGC

o OREA-L202A, 5 metres at 12.7% TGC from 7 metres including 2 metres at 16.2% TGC

o OREA-L202A, 13 metres at 9.3%TGC from 17 metres

o OREA-L203, 18 metres at 6.2% TGC from 2 metres

o OREA-L303, 19 metres at 8.4% TGC from 11 metres including 5 metres at 13% TGC

o OREA-L304, 5 metres at 11.9% TGC from 4 metres including 2 metres at 18.6% TGC

-- The expectation is for the average grade at Camp Lode to be approximately double the already high average Orom-Cross grade.

-- These excellent drill results will underpin a maiden JORC Standard Mineral Resource Estimate and Reserve Determination scheduled for release in March 2021.

[The announcement is reproduced in full in the attached pdf with the map of the drilling programme in figure 1]

http://www.rns-pdf.londonstockexchange.com/rns/2866O_1-2021-2-8.pdf

The results, which come from the weathered, close-to or at-surface zone of the Camp Lode deposit, highlight the quality of the project's mineralisation and ultimately its ability to be a low-cost producer.

The drilling targeted both infill zones and strike extensions to existing high-grade oxide mineralization. These spectacular near-surface intercepts confirm the geological interpretations as well as grade continuity.

The Camp Lode Deposit has been subjected to a diamond drill hole program on a 50 metre by 12.5 metre grid. The drilling was designed to qualify the initial production area for the deposit as a high-grade supplement to the main deposit. Blencowe Resources continues to receive the sample assays for the additional 53 diamond drill hole program undertaken on the Eastern Syncline Lode and QA/QC checks are expected to be completed shortly enabling the company to proceed to finalising the Mineral Resource Estimate.

The holes to date have returned visible grade graphite over the majority of 30m of intersection, with weathering extending to within 5m of the base of the holes in most cases. Based on the received samples to date the expectation is for grades of up to double the 7-8% average Orom-Cross grade.

This may present Blencowe with high grade ore for initial mining which could have significant advantages for both mining costs and product quality. Subsequent logging by company geologists has also identified zones of large to jumbo flakes in the core.

The core has been assayed at SGS in Johannesburg using the method C-IR18. The method is appropriate for understanding graphite deposits and is a total method.

Blencowe Executive Chairman Cameron Pearce commented;

"We have always believed that this Camp Lode offered a very valuable source of graphite to mine in the initial phase of development. These assay results have proven this and delivered a great result, which can underpin our mine plan and ultimately deliver considerable value. As the growth in electric vehicle (EV) and new generation battery demand continues to gather momentum worldwide, the Blencowe team are working hard to develop our 100% owned Orom-Cross graphite project into a valuable mining prospect and future supply hub that can deliver significant tonnes of high quality end-product into several key markets."

For further information please contact:

 
  Blencowe Resources Plc 
   Sam Quinn 
   Investor Enquiries             www.blencoweresourcesplc.com 
   Sasha Sethi                    Tel: +44 (0)1624 681 250 
                                  info@blencoweresourcesplc.com 
 
                                  Tel: +44 (0)7891 677 441 
                                  sasha@flowscomm.com 
 Brandon Hill Capital Limited   Tel: +44 (0)20 3463 5000 
  Jonathan Evans                 jonathan.evans@brandonhillcapital.com 
 
  First Equity Limited           Tel: +44(0)20 7330 1883 
  Jason Robertson                jasonrobertson@firstequitylimited.com 
 

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of larger flakes identified from previous work performed. A 21-year Mining Licence was issued by the Ugandan Government in 2019 following extensive historical work on the deposit.

Orom-Cross presents as a large, shallow open pitable deposit, with an estimated resource in excess of 3 billion tonnes of graphite. Development of the resource is expected to benefit from a low strip ratio and free dig operations, thereby ensuring lower operating and capital costs.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLKZGGZVRLGMZG

(END) Dow Jones Newswires

February 08, 2021 02:07 ET (07:07 GMT)

1 Year Blencowe Resources Chart

1 Year Blencowe Resources Chart

1 Month Blencowe Resources Chart

1 Month Blencowe Resources Chart

Your Recent History

Delayed Upgrade Clock