ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

ALBA Alba Mineral Resources Plc

0.07
0.00 (0.00%)
25 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Alba Mineral Resources Plc LSE:ALBA London Ordinary Share GB00B06KBB18 ORD 0.01P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.07 0.065 0.075 0.07 0.07 0.07 18,315,656 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 0 -2.04M -0.0003 -2.33 4.99M

Alba Mineral Resources PLC Clogau-St David's Gold Mine Update (0290S)

12/03/2021 7:00am

UK Regulatory


Alba Mineral Resources (LSE:ALBA)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Alba Mineral Resources Charts.

TIDMALBA

RNS Number : 0290S

Alba Mineral Resources PLC

12 March 2021

Click on or paste the following link into your website browser to view the associated PDF document (including maps and images): http://www.rns-pdf.londonstockexchange.com/rns/0290S_1-2021-3-11.pdf

Alba Mineral Resources plc

("Alba" or the "Company")

Clogau-St David's Gold Mine Update

Llechfraith Lode System Extends 122m Below Existing Workings

Alba Mineral Resources plc (AIM: ALBA) is pleased to provide an update on the Company's work activities at the Clogau-St David's Gold Mine (the "Mine"). The Company's Phase 1 surface drilling programme has now been successfully completed, and Alba is now able to project the newly identified vein system at the Llechfraith mine area as having a down dip extent of 122 metres below the existing workings, a 46% increase from previous hole LL009.

Key Points

   --     LL010, the final hole in Alba's Phase 1 surface drilling programme, has been completed. 

-- LL010 was the deepest hole drilled at 176.4 m. It intersected the Upper Lode quartz vein system from 120 to 129 m and the Lower Lode quartz vein system from 139 to 145 m.

-- A total of 1.82 m of quartz veins were intersected in the Upper Lode and 5.92 m in the Lower Lode including one intercept of 3.73 m which is the widest intercept in the entire programme.

-- At its deepest point LL010 intersected the lode structure 122 metres below the existing Llechfraith mine workings, almost doubling the depth extent identified previously by LL009 (at 66 metres).

-- Now that Phase 1 has been completed, Alba's initial geological modelling indicates that the total tonnage estimation for the newly identified lode structure is between 24,000 to 27,000 tonnes in the Lower Lode alone.

-- The lode structure remains open at depth within economic stratigraphy below the deepest intercept in LL010, and the western strike extent has yet to be constrained, meaning that this tonnage estimation for the Lower Lode has the potential to be materially increased by further exploration drilling.

-- The success of LL010 strongly reinforces Alba's view that the newly modelled zone, which Alba is calling the Llechfraith Lode, is a key target for future development and production at Clogau-St David's.

-- Intersecting the lode structure at such depth has significant implications for the entire Clogau St. David's Project, as it indicates that gold-bearing structures mined in and around the mine could extend significantly to depths which historical mining efforts never reached.

Mark Austin, Alba's Chief Operating Officer, commented:

"Hole LL010 was designed to assess whether the newly identified lode system beneath the Llechfraith mine area extends to 100 metres below those previous workings. In the event, the hole has greatly exceeded our expectations, intersecting the lower lode at a depth of 122 metres below the lowest workings."

"Now that this phase of drilling has been completed, we have been able to refine our 3D model for this significant, unexploited lode system, which we are calling the Llechfraith Lode, and to calculate for the first time a tonnage estimation of 24,000 to 27,000 tonnes for the Lower Lode alone. This should give a good indication of the sheer size of the Llechfraith Lode and its potential significance for our future development and production plans at Clogau-St David's."

"Perhaps even more significant is the fact that we have intersected the Llechfraith Lode structure at such depth. This has implications for the entire Clogau St. David's Gold Mine, as it indicates that gold-bearing structures mined in and around the Mine could extend significantly to depths which historical mining never reached. This will be further tested very soon, as we embark on Phase 2 of our surface drilling programme targeting the depth extensions of the 7-10 and Grandfathers Lodes, which were significant sites of past production on the Llechfraith Adit Level."

Details

With the completion of LL010 at 176.4 m, the Company's Phase 1 surface drilling campaign has come to its conclusion with a final drilled total length of 1158 m. The campaign was initially planned as a small-scale follow-up drilling programme to get a better picture of how the structures that were intercepted in the 2019 programme behaved at depth below the known Llechfraith Workings. However, impressive vein intercepts in LL001-3 led to additional holes being drilled, with each hole adding critical data for Alba's 3D geological model.

The final hole, LL010, in fact provided possibly the strongest results of the entire programme by intercepting the Lower Lode structure some 122 m below the historic workings (see Figures 1 and 4 in the PDF version of this RNS), significantly increasing the potential tonnage of the Llechfraith Lode and intersecting several quartz vein intercepts, including one intercept of 3.73 m which is easily the widest in the entire programme (see the Upper and Lower Lode drill core photographs at Figures 2 and 3 in the PDF version of this RNS). Revised modelling puts the strike extent of the lode to be 52 m.

Intersecting the lode structure at this depth has significant implications for the entire Clogau St. David's Project, as it indicates that gold-bearing structures mined in and around the mine could extend to depths which historical mining efforts never reached. Phase 2 of Alba's surface drilling programme aims to test this hypothesis further by targeting the depth extensions of the 7-10 and Grandfathers Lodes, which were significant sites of production on the Llechfraith Level and which have not to date been mined below adit level.

Using the 10 holes from Phase 1 and the 3 holes from 2019, Alba has been able to calculate an initial high-level tonnage estimation for the Lower Lode alone of 24,000 to 27,000 tonnes. The tonnage for the Upper Lode has not been calculated as yet, because it is more variable in geometry to the Lower Lode and requires further drilling to constrain its potential size.

The mineralisation remains open along strike to the west, and as the host stratigraphy is also dipping to the west the deposit could extend to increasing depths to the west where historical reports suggest the structure joins up with the Lode mined at Vigra Mine. Future drilling will aim to infill between the Vigra Mine workings and Llechfraith, with a view to extending the Llechfraith Lode to the west and to greater depths.

In addition to the Lode intersects, hole LL010 intersected the "Sill Vein" within Sill 3, showing one of the thickest examples of that vein to date, including sulphide mineralisation that has rarely been seen in veins within sills (see Figure 5 in the PDF version of this RNS).

LL010 has intersected the Upper and Lower Lode structures within Sill Group 1 (See Figure 4 in the PDF version of this RNS). Historical records suggest that where veins intersect the base of these sills there is a control on gold concentration, and the veining seen in these intercepts (see Figures 2 and 3 in the PDF version of this RNS) shows that both structures persist to unprecedented depths below workings. For this reason, being able to model these sills is important for future drilling campaigns and mining operations at Llechfraith. It is possible that these lode structures extend further at depth than currently indicated by drilling, and mineralisation remains open to the west.

With dewatering the Llechfraith workings being a short-term objective for Alba, access into No. 4 Level, one of the most recent areas of production in the Mine, is the next step in exploring the Llechfraith Lode, and access to this level will also afford the Company an improved understanding of gold distribution within the lode structure.

As Alba's Phase 1 surface drilling programme comes to an end, the Company is looking forward to commencing Phase 2 which, as previously advised, comprises an 8-10 hole project for up to 2000 m. This programme will be predominantly targeting the 550 metre lode extension structure identified by last year's underground drilling programme, although several holes will also be pushed through deeper to test the depth extensions of the Grandfathers and 7-10 lode structures. These holes will also play a critical role in the geological model at Clogau as the team continues to identify near-mine exploration targets for future development and production.

Table 1 summarises the key structural intercepts from the Phase 1 drilling campaign.

Table 1: Summary of completed drill holes including notable structural intercepts.

 
 Hole          Azimuth    Dip   Length   Structural Intercepts 
                                   (m) 
                                         Structure          Depth   Thickness 
                                                                          (m) 
              --------  -----  -------  ---------------- 
 GMOW_LL001        351     43    183.5   Quartz Vein        56.77         0.3 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein        60.23        0.61 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein        63.29        0.33 
                                        ----------------  -------  ---------- 
                                         Quartz Vein        63.87        0.24 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       83.43        2.38 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       95.22         2.3 
              --------  -----  -------  ----------------  -------  ---------- 
 GMOW_LL002        353     44    103.3   Quartz Vein        48.17        0.25 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein         56.5        0.26 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein         59.1         0.4 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       96.53        1.85 
              --------  -----  -------  ----------------  -------  ---------- 
 GMOW_LL003        344     44    112.8   Quartz Vein           64        0.42 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       84.92        1.22 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       88.12        0.63 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       89.09        0.56 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       91.64        0.33 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       96.22        2.23 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       101.8        0.28 
              --------  -----  -------  ----------------  -------  ---------- 
 GMOW_LL004        327     43     62.4   Quartz Vein        10.11        0.44 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein        61.92        0.38 
              --------  -----  -------  ----------------  -------  ---------- 
 GMOW_LL005        340   52.2    125.6   Quartz Vein        10.53        0.23 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein         21.8        0.21 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein        64.25        0.85 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       90.01        0.69 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      101.83         2.5 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      107.31        0.32 
              --------  -----  -------  ----------------  -------  ---------- 
 GMOW_LL006        007     43    136.5   Quartz Vein          8.7         0.6 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein         46.4         0.5 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Vein         75.2         0.3 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode Stringer 
                                          Zone             101.03        0.26 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode Stringer 
                                          Zone             101.82        0.32 
              --------  -----  -------  ----------------  -------  ---------- 
                                              Hole stopped early due to 
 GMOW_LL007        335     56     17.5      deviation from planned azimuth 
              --------  -----  -------  ------------------------------------- 
                                         Quartz Stringer 
 GMOW_LL008        327     55    121.1    Network           55.22        0.51 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Quartz Stringer 
                                          Network           79.75        0.55 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       91.78        0.48 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      103.99        1.49 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      109.38        0.43 
              --------  -----  -------  ----------------  -------  ---------- 
 GMOW_LL009        320     56    118.9   Quartz Vein         59.4        0.52 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System        85.8        1.05 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System       106.8        0.63 
              --------  -----  -------  ----------------  -------  ---------- 
 GMOW_LL010        322     70    176.4   Quartz Vein        16.32        0.49 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      120.98        0.37 
              --------  -----  -------  ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      125.28        0.29 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      126.35        0.28 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      127.94        0.56 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      129.24        0.32 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      139.05        0.95 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      140.93        3.73 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      145.07        0.33 
                                        ----------------  -------  ---------- 
                                         Llechfraith 
                                          Lode System      145.74        0.91 
              --------  -----  -------  ----------------  -------  ---------- 
 

All activities and timelines in this announcement are subject to the timely receipt of regulatory and other third-party consents and to the timely availability of contractors, plant and equipment.

This announcement contains inside information for the purposes of the UK Market Abuse Regulation and the Directors of the Company are responsible for the release of this announcement.

Forward Looking Statements

This announcement contains forward-looking statements relating to expected or anticipated future events and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, competition for qualified staff, the regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties regarding the timing and granting of regulatory and other third party consents and approvals, uncertainties regarding the Company's or any third party's ability to execute and implement future plans, and the occurrence of unexpected events.

Without prejudice to the generality of the foregoing, uncertainties also exist in connection with the ongoing Coronavirus (COVID-19) pandemic which may result in further lockdown measures and restrictions being imposed by Governments and other competent regulatory bodies and agencies from time to time in response to the pandemic, which measures and restrictions may prevent or inhibit the Company from executing its work activities according to the timelines set out in this announcement or indeed from executing its work activities at all. The Coronavirus (COVID-19) pandemic may also affect the Company's ability to execute its work activities due to personnel and contractors testing positive for COVID-19 or otherwise being required to self-isolate from time to time.

Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors.

Competent Person Declaration

The information in this release that relates to Exploration Results has been reviewed by Mr Mark Austin. Mr Austin is a member of SACNASP (Reg. No. 400235/06), Fellow of The Geological Society and Fellow of the Geological Society of South Africa. He has a B.Sc. Honours in Geology with 38 years' experience.

Mark Austin has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration targets, Exploration Results, Mineral Resources and Ore Reserves', also known as the JORC Code. The JORC code is a national reporting organisation that is aligned with CRIRSCO. Mr Austin consents to the inclusion in the announcement of the matters based on his information in the form and context in which they appear.

Glossary

Azimuth: the compass direction of a drill hole, usually specified in degrees with respect to the geographic or magnetic north pole.

Economic stratigraphy: host rocks that contain economically viable lodes.

Lode: a deposit of metalliferous ore that fills a fissure.

Quartz Veins: a distinct sheet-like body dominantly composed of quartz hosted within a rock formation.

Sill: an igneous intrusion that is sub-parallel to the host rocks that contain it.

Winze: a shaft or inclined passage leading from one level to another, but not rising to the surface.

Contact Details

For further information, please contact:

Alba Mineral Resources plc

   George Frangeskides, Executive Chairman                              +44 20 3950 0725 

Cairn Financial Advisers LLP (Nomad)

   James Caithie / Liam Murray                                                  +44 20 7213 0880 

ETX Capital (Broker)

   Thomas Smith                                                                      +44 20 7392 1494 

Alba's Project and Investment Portfolio

 
 Project (commodity)            Location     Ownership 
 Mining Projects 
 Amitsoq (graphite)             Greenland    90% 
                               -----------  ---------- 
 Clogau (gold)                  Wales        90% 
                               -----------  ---------- 
 Dolgellau Gold Exploration 
  (gold)                        Wales        90-100% 
                               -----------  ---------- 
 Gwynfynydd (gold)              Wales        100% 
                               -----------  ---------- 
 Inglefield (copper, cobalt, 
  gold)                         Greenland    100% 
                               -----------  ---------- 
 Limerick (zinc-lead)           Ireland      100% 
                               -----------  ---------- 
 Melville Bay (iron ore)        Greenland    51% 
                               -----------  ---------- 
 TBS (ilmenite)                 Greenland    100% 
                               -----------  ---------- 
 Oil & Gas Investments 
 Brockham (oil)                 England      5% 
                               -----------  ---------- 
 Horse Hill (oil)               England      11.765% 
                               -----------  ---------- 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLUAOARASUOAUR

(END) Dow Jones Newswires

March 12, 2021 02:00 ET (07:00 GMT)

1 Year Alba Mineral Resources Chart

1 Year Alba Mineral Resources Chart

1 Month Alba Mineral Resources Chart

1 Month Alba Mineral Resources Chart

Your Recent History

Delayed Upgrade Clock