ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

SRA Stria Lithium Inc

0.09
0.00 (0.00%)
24 Jul 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Stria Lithium Inc TSXV:SRA TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.09 0.07 0.09 0 01:00:00

Sierra Geothermal Drills Deep at Silver Peak

20/01/2010 2:00pm

Marketwired


Stria Lithium (TSXV:SRA)
Historical Stock Chart


From Jul 2019 to Jul 2024

Click Here for more Stria Lithium Charts.

Sierra Geothermal Power Corp. (TSX VENTURE: SRA) ("SGP") today provides an update on the exploration drilling program at its 100% owned Silver Peak project.

Today, SGP commenced drilling of a core-slim-well at its Silver Peak project. Well 38-11 is being drilled to a maximum depth of 2,133 metres or 7,000 feet and targets multiple zones of high geologic interest. Well 38-11 will be the first deep well test at Silver Peak. This well follows SGP's recent shallow temperature gradient drilling and geophysical surveys. Well 38-11 is funded on a 50:50 cost share basis by the U.S. Department of Energy's Geothermal Technologies Program grant which was awarded to SGP in 2009.

SGP has contracted Major Drilling Group International Inc. to drill the well with an LF230 mounted core drill rig. Drilling is supervised by senior geologist Mr. John Deymonaz. Core samples are being collected from the top of competent bedrock to the bottom of the hole to provide geological information on subsurface rock types, faults, and fractures. This information will be integrated into SGP's 3D geologic model for Silver Peak. The primary objective of the well is to test temperature and permeability in the subsurface. A secondary objective is to compare core drilling rates to conventional and coil-tube rig drilling rates.

"This a great step forward in the advancement of the Silver Peak project. Our plan here is to drill a coil tube slim well next and, pending results, drill the first production assessment well. If successful, we can then continue drilling production wells to feasibility, execute a Power Purchase Agreement and secure plant permits," said President and CEO Gary Thompson.

About Silver Peak

The Silver Peak geothermal power project is part of SGP's Paymaster district and located in Esmeralda County, Nevada, 240 kilometres (150 miles) northwest of Las Vegas, and covers 7,873 acres. GeothermEx's independent analysis estimates a resource capacity of 15-40 MW of power. The Silver Peak property has two 55 kV transmission lines connecting to the Nevada and California power grids and a substation located on the lease itself. Many geothermal features are visible on the property. The recent shallow drilling measured a maximum temperature of 88 degrees Celsius or 190 degrees Fahrenheit at a depth of 140 meters or 459 feet. Chemical geothermometers that have been applied to the thermal waters suggest that temperatures may reach 200-230 degrees Celsius (400-440 degrees Fahrenheit) at depth.

About Sierra Geothermal Power Corp.

Sierra Geothermal Power Corp. is a renewable energy company focused on the exploration and development of clean, sustainable geothermal power. It is based in Vancouver, British Columbia and listed on the TSX Venture Exchange under the symbol SRA. Its portfolio of geothermal projects located in Nevada and California exceeds 365 square kilometres (90,000 acres) and has a combined total estimated capacity of greater than 500 MW. SGP intends to finance development by utilizing a combination of corporate equity, joint venture partnerships and project debt, with the support of US government grants and loan guarantees. To find out more about Sierra Geothermal Power Corp. (TSX-V: SRA) visit our website at www.sierrageopower.com.

On behalf of the Board of Directors

Gary Thompson, P.Geo, President, Chief Executive Officer and Director

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION

This press release contains forward-looking statements. Forward-looking statements are projections of events, revenues, income, future economic performance or management's plans and objectives for future operations. In some cases you can identify forward-looking statements by the use of terminology such as "may", "should", "anticipates", "believes", "expects", "intends", "forecasts", "plans", "future", "strategy", or words of similar meaning. Forward-looking statements in this press release include statements about Well 38-11 being the first deep well test at Silver Peak, plan is to drill a coil tube slim well next and, pending results, drill the first production assessment well, If successful, we can then continue drilling production wells to feasibility, execute a Power Purchase Agreement and secure plant permits, and the Company's intent to finance the development of its projects through a combination of corporate equity, joint venture partnerships and project debt with the support of U.S. government grants and loan guarantees. These statements are only predictions and involve known and unknown risks, uncertainties and other factors, including the risks inherent in our industry, the challenging capital markets and other risks identified by us in our periodic filings on SEDAR (which can be viewed at www.sedar.com). Any of these risks could cause our or our industry's actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by these forward-looking statements.

While these forward-looking statements and any assumptions upon which they are based are made in good faith and reflect our current judgment regarding the direction of its business, actual results will almost always vary, sometimes materially, from any estimates, predictions, projections, assumptions or other future performance suggested in this press release. Except as required by applicable law, including the securities laws of Canada, we do not intend to update any of the forward-looking statements to conform these statements to actual results.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts: Sierra Geothermal Power Corp. Gary Thompson President & CEO (604) 683-0332 / 1-800-563-5631 info@sierrageopower.com Sierra Geothermal Power Corp. Anthony Srdanovic Investor Relations (604) 642-6179 asrdanovic@sierrageopower.com www.sierrageopower.com

1 Year Stria Lithium Chart

1 Year Stria Lithium Chart

1 Month Stria Lithium Chart

1 Month Stria Lithium Chart

Your Recent History

Delayed Upgrade Clock