We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Prospector Metals Corporation | TSXV:PPP | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.11 | 0.10 | 0.11 | 0 | 14:30:07 |
Parlane Resource Corp. (TSX VENTURE:PPP) ("Parlane" or the "Company") is pleased to announce that field crews have commenced work at the Big Bear property over areas that were targeted for drilling during the 2011 exploration program. The Big Bear property is located in the Omineca Mining Division, Nechako Plateau in central British Columbia, approximately 100 kilometres south of Vanderhoof and covers 14,366 hectares. It is located between two mineralized systems: New Gold Inc.'s Blackwater and the Capoose properties. The Big Bear is highly prospective for the discovery of similar epithermal, subvolcanic porphyry and transitional mineralization. New Gold Inc. reports measured and indicated mineral resources at Blackwater of 5.5 million ounces of gold and 28.5 million ounces of silver (www.newgold.com news release March 7, 2012). Capoose's measured and indicated mineral resource is reported as 0.4 million ounces of gold and 26.6 million ounces of silver (www.newgold.com). Big Bear field crews have started detailed geochemical sampling and preparing for ground-based induced polarization geophysical surveys over prospective areas that returned anomalous assays during the 2011 program. Gold assays from soil samples collected in 2011 ranged from 628 parts per billion (ppb) to less than 1 ppb. Drilling is planned for select target areas and a BC Mines Act permit has been issued to Parlane for this work. An extensive logging road network and recent beetle-kill harvesting provide excellent access to the Big Bear project area. Ian Webster, P.Geo., is the Qualified Person as defined by National Instrument 43-101 who has reviewed and approved the contents of this release. ON BEHALF OF THE BOARD Robert Eadie, President, Chief Executive Officer and Director
1 Year Prospector Metals Chart |
1 Month Prospector Metals Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions