We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Cartier Resources Inc | TSXV:ECR | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.005 | -7.69% | 0.06 | 0.06 | 0.065 | 0.06 | 0.06 | 0.06 | 50,000 | 15:06:04 |
The results were obtained in the VG Structure at a depth of 35 m and a distance of 275 m west of the VG Zone.
« The initial results from the current drilling program attest to the potential of a 15-kilometre segment of the Larder Lake–Cadillac faults corridor of the Chimo Mine Property, which contains resources*, deposits and numerous gold showings to be further explored » commented Philippe Cloutier, President and CEO.
Table 1: Details of the new results
Hole | CoordinatesUTM (m) | Azimuth (°) /Plunge (°) | From(m) | To(m) | Au(g/t) | Length(m) | Gold Zone | Gold Structure |
Location: West Nordeau Sector – Confirmation of the VG Structure 275 m west of the VG Zone | ||||||||
CH24-94 | 333253/5319894/350 | 160/-57 | 42.0 | 44.0 | 7.7 | 2.0 | - | VG |
including | 42.0 | 43.0 | 13.5 | 1.0 | ||||
CH24-95 | 182/-66 | 84.6 | 85.3 | 4.7 | 0.7 |
The widths of the mineralized intersections are presented as downhole lengths.The true widths of the mineralized intersections are estimated at 70 to 75% of the reported core length interval.
Table 2: Details of the historical results
Hole | CoordinatesUTM (m) | Azimuth (°) /Plunge (°) | From(m) | To(m) | Au(g/t) | Length(m) | Gold Zone | Gold Structure |
Location: West Nordeau Sector – VG Structure | ||||||||
W 90-08 | 333253/5319894/350 | 183/-80 | 59.2 | 61.0 | 14.5 | 1.8 | - | VG |
including | 59.4 | 59.7 | 75.3 | 0.3 |
The widths of the mineralized intersections are presented as downhole lengths.The true widths of the mineralized intersections are estimated at 55% of the reported core length interval.
About the Chimo Mine Project:
* NI 43-101 Mineral Resources Estimate for Chimo Mine and West Nordeau Gold Deposits, Québec, Canada, Vincent Nadeau-Benoit, P.Geo., Alain Carrier, P.Geo., M.Sc. and Marc R. Beauvais, P.Eng., InnovExplo Inc., August 22nd, 2022.
** NI 43-101 Technical Report and Preliminary Economic Assessment for Chimo Mine and West Nordeau Gold Deposits, Chimo Mine and East Cadillac Properties, Quebec, Canada, Marc R. Beauvais, P.Eng., of InnovExplo Inc., Mr. Florent Baril of Bumigeme and Mr. Eric Sellars, P.Eng. of Responsible Mining Solutions, May, 29th, 2023.
About Cartier Resources Inc.Founded in 2006, Cartier Resources Inc. is an exploration Company based in Val-d’Or, Quebec, Canada. The Company’s projects are located in Quebec, which consistently ranks among the world’s best mining jurisdictions. Cartier is actively advancing the development of its flagship Chimo Mine Project and exploring its other projects. The Company has a cash position of $4.2 million and significant corporate and institutional support, including Agnico Eagle Mines, O3 Mining and provincial investment funds.
Quality Assurance / Quality ControlFor each batch of samples sent to the laboratory, Cartier inserts 5% of the number of samples in the form of certified standards and another 5% in the form of blanks to ensure quality control. The samples are analyzed at the Techni-Lab (Actlabs) laboratory in Ste-Germaine-Boulé, Quebec, Canada. Samples weighing 3 to 5 kg are crushed by the laboratory to 90% passing 10 mesh (2.00 mm), then a 500 g fraction of each sample is pulverized to 90% passing 200 mesh (0.07 mm). The resulting 50 g pulps are analyzed by fire assay with an atomic absorption finish. Samples with results ≥ 1.0 g/t and < 10.0 g/t are re-assayed by fire assay with an atomic absorption finish. Results greater than or equal to 10.0 g/t Au are analyzed by fire assay with a gravimetric finish. For samples containing visible gold, a 500 g subsample of rock is analyzed by the metallic sieve method.
Qualified PersonsThe Company’s scientific and technical information in this news release was prepared and reviewed by Mr. Gaétan Lavallière, P.Geo., PhD, Vice-President, and Mr. Ronan Déroff, P.Geo., M.Sc., Senior Geologist, Project Manager and Geomatician, both qualified persons as defined in National Instrument 43-101. Mr. Lavallière approved the information contained in this press release.
For more information, contact:Philippe Cloutier, P.Geo.President and CEOTelephone: 819-856-0512philippe.cloutier@ressourcescartier.comwww.ressourcescartier.com
Neither the TSX Venture Exchange nor its regulatory services provider accepts responsibility for the adequacy or accuracy of this press release.
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/383d63a4-d91c-4ec7-a069-81f017f7f69d
1 Year Cartier Resources Chart |
1 Month Cartier Resources Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions