ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

DCMC Dore Copper Mining Corp

0.145
-0.005 (-3.33%)
27 Dec 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Dore Copper Mining Corp TSXV:DCMC TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.005 -3.33% 0.145 0.135 0.145 0.145 0.135 0.135 30,000 21:43:48

Doré Copper Submits Preliminary Information Statement for Environmental and Social Impact Assessment

17/11/2022 1:30pm

GlobeNewswire Inc.


Dore Copper Mining (TSXV:DCMC)
Historical Stock Chart


From Dec 2021 to Dec 2024

Click Here for more Dore Copper Mining Charts.

Doré Copper Mining Corp. (the "Corporation" or "Doré Copper") (TSXV: DCMC; OTCQX: DRCMF; FRA: DCM) is pleased to announce it has submitted to the Administrator of the James Bay and Northern Quebec Agreement the Preliminary Information Statement for the Environmental and Social Impact Assessment (ESIA) for the commencement of its proposed hub-and spoke operation near Chibougamau, Québec. The Preliminary Information Statement includes the Corner Bay and Devlin mines, the Copper Rand mill, the tailings management facility and associated roads and electrical power connections. The vast majority of the sites described in the Preliminary Information Statement have existing infrastructures.

The Preliminary Information Statement is the first step of the environmental and social assessment and review procedure under the Environment Quality Act. On behalf of the Administrator, the Environmental and Social Impact Evaluating Committee (COMEV) will review the Preliminary Information Statement then issue a project Directive, the proponent roadmap under which the ESIA will be carried out.

About Doré Copper Mining Corp.

Doré Copper Mining Corp. aims to be the next copper producer in Québec with an initial production target of +50 million pounds of copper equivalent annually by implementing a hub-and spoke operation model with multiple high-grade copper-gold assets feeding its centralized Copper Rand mill1. The Corporation has delivered its PEA in May 2022 and is proceeding with a feasibility study.

The Corporation has consolidated a large land package in the prolific Lac Doré/Chibougamau and Joe Mann mining camps that has produced 1.6 billion pounds of copper and 4.4 million ounces of gold2. The land package includes 13 former producing mines, deposits and resource target areas within a 60-kilometer radius of the Corporation’s Copper Rand Mill.

For further information, please contact:
Ernest Mast          Laurie Gaborit
President and Chief Executive Officer Vice President, Investor Relations
Phone: (416) 792-2229 Phone: (416) 219-2049
Email: ernest.mast@dorecopper.com  Email: laurie.gaborit@dorecopper.com
   
Visit: www.dorecopper.com   
Facebook: Doré Copper Mining  
LinkedIn: Doré Copper Mining Corp.  
Twitter: @DoreCopper  
Instagram: @DoreCopperMining  
   
  1. Technical report titled "Preliminary Economic Assessment for the Chibougamau Hub-and-Spoke Complex, Québec, Canada" dated June 15, 2022, in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). The Technical Report was prepared by BBA Inc. with several consulting firms contributing to sections of the study, including SLR Consulting (Canada) Ltd., SRK Consulting (Canada) Inc. and WSP Inc.
  2. Sources for historic production figures: Economic Geology, v. 107, pp. 963–989 - Structural and Stratigraphic Controls on Magmatic, Volcanogenic, and Shear Zone-Hosted Mineralization in the Chapais-Chibougamau Mining Camp, Northeastern Abitibi, Canada by François Leclerc et al. (Lac Dore/Chibougamau mining camp) and NI 43-101 Technical Report on the Joe Mann Property dated January 11, 2016 by Geologica Groupe-Conseil Inc. for Jessie Ressources Inc. (Joe Mann mine).

Cautionary Note Regarding Forward-Looking Statements This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and includes the negatives thereof. Specific forward-looking statements in this press release include, but are not limited to aiming to be the next copper producer in Québec with an initial production target of +50 million pounds of copper equivalent annually; implementing a hub-and spoke operation model; and proceeding with a feasibility study.

All statements other than statements of historical fact included in this release, including, without limitation, statements regarding the timing and ability of the Corporation to receive necessary regulatory approvals, and the plans, operations and prospects of the Corporation and its properties are forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties and other factors which may cause actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to, actual exploration results, changes in project parameters as plans continue to be refined, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, uninsured risks, regulatory changes, delays or inability to receive required regulatory approvals, health emergencies, pandemics and other exploration or other risks detailed herein and from time to time in the filings made by the Corporation with securities regulators. Although the Corporation has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

1 Year Dore Copper Mining Chart

1 Year Dore Copper Mining Chart

1 Month Dore Copper Mining Chart

1 Month Dore Copper Mining Chart

Your Recent History