ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

ADE Adex Mining Inc

0.005
0.00 (0.00%)
19 Jul 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Adex Mining Inc TSXV:ADE TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.005 0.005 0.01 100 01:00:00

Adex Announces Results for Fire Tower Zone Scoping Study

30/10/2008 3:00pm

Marketwired Canada


Adex Mining Inc. ("Adex" or the "Company") (TSX VENTURE:ADE) is pleased to
announce the results of the scoping study on the Fire Tower Zone ("FTZ") at its
Mount Pleasant Mine Property ("Mount Pleasant" or the "Property") located in
southwestern New Brunswick, Canada. The FTZ is the site of a past-producing
tungsten-molybdenum underground mining operation during the 1980s.


The results of the scoping study indicate that the FTZ project is financially
robust, with an unlevered pre-tax internal rate of return ("IRR") estimated at
27.1%. The after-tax IRR is estimated at 19.8%. Similarly, the net present value
("NPV") of the FTZ project, using a discount rate of 8%, is CAD $164.6 million
and CAD $83.7 million on a pre-tax and after-tax basis, respectively.


"We're very excited by these results of the FTZ scoping study," said Kabir
Ahmed, President and CEO of Adex. "The scoping study is a key step in assessing
the economic potential of the tungsten-molybdenum bearing Fire Tower Zone, and
an important decision-making tool in determining whether to proceed to
definitive feasibility work and a production decision on the Property."


The results were prepared by Aker Metals, a division of Aker Solutions Canada
Inc., and part of Aker Solutions ASA, a major multinational engineering
consulting firm contracted by Adex to complete the FTZ scoping study. The full
scoping study report will be completed by Aker Metals within the next few weeks.
The total preproduction capital cost is estimated to be CAD $130,780,000, with
an additional sustaining capital of CAD $5,750,000 to be spent during the
production lifespan of the mine.


Based on the product prices that follow, the operation is projected by the
scoping study to generate CAD $1.160 billion in revenue over the 13 year life of
the mine. Product pricing used in the scoping study is based on a market study
prepared by the Company's independent consultants, Thibault & Associates Inc.
("TAI"), which also managed the gravity concentration test program and carried
out the process design work. Operating costs are estimated to total CAD
$599,602,000.


The product pricing for the financial analysis is as follows:

- APT (ammonium paratungstate): US$215/MTU WO3

- Molybdenum: US$23.17/lb MoO3

- The currency exchange rate for the financial analysis is as follows: US$:CAD$
1.00:1.057


According to the results of the scoping study:

- the existing underground mine at the FTZ, which is currently flooded, can be
dewatered, refurbished and prepared for production in 35 weeks 


- the overall project duration from start of the Definitive Feasibility Study
(DFS) to the start of production is estimated at 29 months 


- the surface infrastructure will likely require very little work since the
existing roads and buildings are serviceable and will require only minor
upgrading.


In addition, a 10 megawatt electric power substation exists, as does the
associated secondary voltage distribution system.


Should the FTZ project proceed to production, underground mining will be carried
out utilizing a Vertical Crater Retreat method that had been successfully
employed by the previous operator. The mine is designed to be capable of
producing 840,000 tonnes per year at a rate of 2400 tonnes per day (tpd).


The flow sheet for the process, to produce ammonium paratungstate (APT) and a
molybdenum sulphide concentrate, includes gravity separation for
pre-concentration of oxide minerals (tin and tungsten), flotation of sulfide
minerals (arsenic and molybdenum) and hydrometallurgical processing of the
concentrates to comply with end user specifications. The development of
grinding, gravity separation and flotation unit operations for optimum tungsten
and tin recovery is based on bench scale testing. The remainder of the process,
including the APT hydrometallurgical circuit and molybdenum concentrate leaching
circuit, is predicated on conventional industrial practice.


The annual mill throughput is estimated to be 788,000 tonnes, at an average rate
of 2200 tpd. The recovery of APT is estimated at 75% and the recovery of a
molybdenum sulphide concentrate is estimated at 76%.


Given the scoping study's positive economic assessment of the FTZ project, the
Company intends to carry out pilot plant work as part of the DFS in order to
confirm metallurgical parameters, process flow sheet details, and to more
accurately define reagent consumption and costs.


The scoping study is based on the resource estimate announced in the Company's
press release dated October 23, 2008 completed by SRK Consulting (Canada) Ltd.
("SRK") in conjunction with the preparation of an independent NI 43-101
Technical Report currently being completed by Watts, Griffis and McOuat Limited
("WGM"), all under the supervision of Trevor Boyd, P.Geo., the Company's
Geological Consultant.


The scoping study and the economic analyses contained therein are preliminary in
nature and contain inferred mineral resources that are considered too
speculative geologically to have economic considerations applied to them that
would enable them to be categorized as mineral reserves and there is no
certainty that the results of the scoping study will be realized with more
detailed work. Mineral resources that are not mineral reserves do not have
demonstrated economic viability.


Qualified Person

John Rogers, P.Eng., Project Manager for Aker Metals and an independent
qualified person as defined by NI 43-101, supervised the preparation of the
scoping study and the technical information contained in this press release in
compliance with NI 43-101.


ABOUT AKER SOLUTIONS:

Aker Solutions is a leading global provider of engineering and construction
services, technology products and integrated solutions. The businesses within
Aker Solutions comprise several industries, including Oil & Gas, Refining &
Chemicals, Mining & Metals and Power Generation. The Aker Solutions group is
organised in a number of separate legal entities. Aker Solutions is used as the
common brand/trademark for most of these entities. The parent company in the
group is Aker Solutions ASA. Aker Solutions has aggregated annual revenues of
approximately NOK 50 billion and employs approximately 23,000 people in about 30
countries. With its Metals Headquarters based in Santiago, Chile, Aker Solutions
has other Metals offices located in Toronto, Canada; Tucson, Arizona, U.S.A.;
combined with regional metals capabilities in Perth, Brisbane and Melbourne,
Australia; Mumbai, India and Stockton-on-Tees, U.K. The Metals Division of Aker
Solutions provides a global capability to serve its clients across the full
project cycle from studies through to design engineering, procurement,
construction, commissioning and startup. Specialized expertise spans: precious
metals, nickel, copper, molybdenum, iron ore, zinc, uranium, evaporites and
industrial minerals.


ABOUT ADEX

Adex Mining Inc. is a Canadian junior mining company with an experienced
management team. The Company is focused on developing its flagship Mount
Pleasant Mine Property, a multi-metal project that is host to promising
tungsten-molybdenum and tin-indium-zinc-copper mineralization. Located in
Charlotte County, New Brunswick, the Mount Pleasant Mine Property is situated
approximately 80 kilometres south of Fredericton, the provincial capital, and is
65 kilometres from the United States border. The common shares of Adex trade on
the TSX Venture Exchange under the stock symbol "ADE."


FORWARD-LOOKING STATEMENTS

Certain statements in this press release may constitute "forward-looking"
statements which involve known and unknown risks, uncertainties and other
factors which may cause actual results, performance or achievements of Adex, its
subsidiary or the industry in which they operate to be materially different from
any future results, performance or achievements expressed or implied by such
forward-looking statements. When used in this press release, the words
"estimate", "believe", "anticipate", "intend", "expect", "plan", "may",
"should", "will", the negative thereof or other variations thereon or comparable
terminology are intended to identify forward-looking statements. Such statements
reflect the current expectations of the management of Adex with respect to
future events based on currently available information and are subject to risks
and uncertainties that could cause actual results, performance or achievements
to differ materially from those expressed or implied by those forward-looking
statements. These risks and uncertainties are detailed from time to time,
including, without limitation, under the heading "Risk Factors", in reports
filed by Adex with the Alberta, British Columbia and Ontario Securities
Commissions which are available at www.sedar.com and to which readers of this
press release are referred for additional information concerning Adex, its
prospects and the risks and uncertainties relating to Adex and its prospects.
New risk factors may arise from time to time and it is not possible for
management to predict all of those risk factors or the extent to which any
factor or combination of factors may cause actual results, performance and
achievements of Adex to be materially different from those contained in
forward-looking statements. Although the forward-looking statements contained in
this press release are based upon what management believes to be reasonable
assumptions, Adex cannot assure investors that actual results will be consistent
with these forward-looking statements. Given these risks and uncertainties,
investors should not place undue reliance on forward-looking statements as a
prediction of actual results.


The forward-looking information contained in this press release is current only
as of the date of the press release. Adex does not undertake or assume any
obligation to release publicly any revisions to these forward-looking statements
to reflect events or circumstances after the date hereof or to reflect the
occurrence of unanticipated events, except as required by law.


1 Year Adex Mining Chart

1 Year Adex Mining Chart

1 Month Adex Mining Chart

1 Month Adex Mining Chart

Your Recent History

Delayed Upgrade Clock