ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

ABA Abasca Resources Inc

0.145
0.00 (0.00%)
27 Dec 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Abasca Resources Inc TSXV:ABA TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.145 0.13 0.15 0 00:00:00

Abbastar Resources Options High Grade Gold Project from Denison Mines Corp.

22/09/2009 2:35pm

Marketwired Canada


Abbastar Resources Corp. (TSX VENTURE:ABA) is pleased to announce an option
agreement with Denison Mines Corp. on the Talbot Lake gold project in northern
Ontario. Abbastar has the right to earn 100% interest from Denison, subject to a
2% NSR, upon expenditures of $7,000,000 over 8 years.


The Talbot Lake gold project hosts the "Main Zone" gold deposit which was
discovered by Placer Dome in 1985 and acquired by Denison Mines in 1998. It
consists of an East-West striking and vertically dipping quartz vein containing
visible gold, pyrite, copper sulphide and zinc sulphide. Channel sampling by
Denison indicated an approximate strike length of the Main Zone to be 48m with a
weighted average grade of 13.8 g/t Au over a width of 3.3m. One channel over a
width of 1.8m yielded a spectacular value of 120.0 g/t Au. The gold deposit
extends for a depth of approximately 200m and remains open. The following are
some significant drill hole intersections by Placer Dome from the "Main Zone";
16.4 g/t Au over 7.6m, 37.2 g/t Au over 2.5m, 26.9 g/t Au over 2.9m, 7.5 g/t Au
over 7.5m. (source: Resident Geologist, Ministry of Northern Development and
Mines, Thunder Bay). To date a total of $6,000,000 in exploration expenditures
has been carried out on the Talbot Lake gold project.


A parallel "Sulphide Zone" up to several metres wide is often intersected
adjacent to the "Main Zone" and contains copper and zinc mineralization with
anomalous gold. Further to the east the Main Zone is crosscut by a northeast
trending fault with a separate mineralized structure called the "East Zone"
located immediately east of this fault. The 'Sulphide' and 'East Zones' have
received less attention than the Main Zone but remain highly prospective and
will be part of a more aggressive exploration program on the Talbot Lake gold
project. Importantly, there is considerable potential to expand the Property's
known gold zones.


The Talbot Lake project is located within the world-renowned gold producing
"Uchi Subprovince" of northwestern Ontario. This prolific gold producing area is
host to the Red Lake and Pickle Lake gold mining camps and has produced in
excess of 40 million ounces of gold.


Gold bearing quartz veins, like that at Talbot, are common in the established
mining camps such as Red Lake, Timmins, Kirkland Lake and have been Canada's
most important gold producers. These quartz vein systems are planar objects,
which tend to have great lengths and depth. Gold deposits in the Uchi
Subprovince show excellent continuity in the depth dimension and operations such
as Goldcorp's Red Lake Mine is evidence of such.


"Acquiring such a significant high grade gold asset in this strong precious
metal market bodes well for the future of Abbastar," commented John B. Good,
President and CEO. "The Company is extremely excited with this new development.
Given the strong market demand for gold, the Talbot Lake gold Project has become
a very important and valuable asset in the growth of Abbastar."


"We are looking forward to advancing this exciting high grade gold project,"
stated Aubrey Eveleigh, VP Exploration. "The Talbot Lake project is located in
one of the more prospective geological gold 'belts' or subprovinces in Canada."


Abbastar may earn an initial 70% interest by incurring expenditures of
$4,000,000 over 5 years. Abbastar may elect to earn an additional 30% by making
a payment of $250,000 and expending an additional $3,000,000 on the Project on
or before 30 September 2017 (Year 8). If Abbastar elects not to earn an
additional 30%, a JV of Abbastar 70% and Denison 30% will be formed and governed
by a committee of 2 people from each party. Upon Abbastar notifying Denison of
having expended $7,000,000 and earning 100% undivided interest in the Project,
subject to a 2% NSR to Denison, Abbastar will make an additional payment of
$250,000.


Exploration on the Talbot Lake gold Project is carried out under the supervision
of Aubrey Eveleigh, P.Geo. (QP - NI43-101). The historical assays have not been
verified and as such should not be relied upon even though Abbastar plans to
immediately bring the Project up to TSX Venture 43-101 reporting standards.


Abbastar has approximately 15,200,000 common shares outstanding.

The statements used in this Press Release may contain forward-looking statements
that may involve a number of risks and uncertainties. Actual events or results
could differ materially from the Company's forward-looking statements and
expectations.


1 Year Abasca Resources Chart

1 Year Abasca Resources Chart

1 Month Abasca Resources Chart

1 Month Abasca Resources Chart

Your Recent History

Delayed Upgrade Clock