We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type | Share ISIN | Share Description |
---|---|---|---|---|---|
Central Asia Metal PLC | AQSE:CAML.GB | Aquis Stock Exchange | Ordinary Share | GB00B67KBV28 | Common Stock10p |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
6.00 | 4.00% | 156.00 | 154.00 | 165.00 | 159.50 | 150.00 | 150.00 | 33,832 | 15:29:37 |
Industry Sector | Turnover | Profit | EPS - Basic | PE Ratio | Market Cap |
---|---|---|---|---|---|
0 | 0 | N/A | 0 |
TIDMCAML
RNS Number : 8891V
Central Asia Metals PLC
12 April 2023
12 April 2023
CENTRAL ASIA METALS PLC
('CAML' or the 'Company')
Q1 2023 Operations Update
Central Asia Metals plc (AIM: CAML) today provides a Q1 2023 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in North Macedonia ('Sasa').
Summary
- Zero lost time injuries ('LTI') at Kounrad or Sasa - Kounrad copper production of 3,336 tonnes - Sasa zinc in concentrate production of 4,917 tonnes - Sasa lead in concentrate production of 6,618 tonnes
Outlook
- Full year 2023 guidance
o Copper: 13,000 to 14,000 tonnes
o Zinc in concentrate: 19,000 to 21,000 tonnes
o Lead in concentrate: 27,000 to 29,000 tonnes
CAML production summary
Metal production (tonnes) Q1 2023 Q1 2022 Copper 3,336 3,024 -------- -------- Zinc 4,917 5,240 -------- -------- Lead 6,618 6,736 -------- --------
Nigel Robinson, Chief Executive Officer, commented:
"We have had a solid start to 2023 with no LTIs at either site and a very good first quarter of production at Kounrad. We are on target to meet 2023 guidance at both sites.
"We also remain on track with our development projects at Sasa to start the transition to paste fill mining in H2 2023 and at Kounrad with the construction of our 4.77MW solar plant."
Health and Safety
In Q1 2023, there were no LTIs at either Kounrad or Sasa.
Kounrad
Production and sales update
Kounrad Q1 2023 copper production was 3,336 tonnes and copper sales during Q1 2023 were 2,914 tonnes.
Sasa
Production and sales update
In Q1 2023, mined and processed ore were 196,503 tonnes and 195,968 tonnes respectively. The average head grades for the period were 2.95% zinc and 3.59% lead. Q1 2023 metallurgical recoveries were 85.2% for zinc and 94.2% for lead.
Sasa produces a zinc concentrate and a separate lead concentrate. In Q1 2023, 9,716 tonnes of concentrate containing 50.6% zinc and 9,282 tonnes of concentrate containing 71.3% lead were produced.
Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q1 2023 payable production was 4,140 tonnes of zinc and 6,287 tonnes of lead. Payable base metal in concentrate sales for the quarter were 4,349 tonnes of zinc and 4,404 tonnes of lead. The additional lead concentrate stocks as at 31 March 2023 relate to material that has been contracted to international customers however, not as yet transported to the port.
During Q1 2023, Sasa sold 56,989 ounces of payable silver to Osisko Gold Royalties, in accordance with its streaming agreement.
Transition to paste fill - development projects
By the end of Q1 2023, all aspects of the development projects on site at Sasa to facilitate the transition to paste fill mining in H2 2023 remained on track. Dry commissioning of the Paste Backfill Plant will commence in April 2023 and over 1,800 metres of the new Central Decline has been completed.
Units Q1 2023 Q1 2022 Ore mined t 196,503 197,501 --------- -------- -------- Plant feed t 195,968 197,986 --------- -------- -------- Zinc grade % 2.95 3.14 --------- -------- -------- Zinc recovery % 85.2 84.3 --------- -------- -------- Lead grade % 3.59 3.65 --------- -------- -------- Lead recovery % 94.2 93.3 --------- -------- -------- Zinc concentrate t (dry) 9,716 10,519 --------- -------- -------- * Grade % 50.6 49.8 --------- -------- -------- * Contained zinc t 4,917 5,240 --------- -------- -------- Lead concentrate t (dry) 9,282 9,488 --------- -------- -------- * Grade % 71.3 71.0 --------- -------- -------- * Contained lead t 6,618 6,736 --------- -------- --------
For further information contact:
Central Asia Metals Tel: +44 (0) 20 7898 9001 Nigel Robinson CEO Gavin Ferrar CFO Louise Wrathall louise.wrathall@centralasiametals.com Director of Corporate Development Emma Chetwynd Stapylton emma.chetwyndstapylton@centralasiametals.com Investor Relations Manager Peel Hunt (Nominated Advisor and Tel: +44 (0) 20 7418 8900 Joint Broker) Ross Allister David McKeown BMO Capital Markets (Joint Broker) Tel: +44 (0) 20 7236 1010 Thomas Rider Pascal Lussier Duquette BlytheRay (PR Advisors) Tel: +44 (0) 20 7138 3204 Tim Blythe Megan Ray Rachael Brooks
Note to editors:
Central Asia Metals, an AIM-listed UK company based in London, owns 100% of the Kounrad SX-EW copper project in central Kazakhstan and 100% of the Sasa zinc-lead mine in North Macedonia.
For further information, please visit www.centralasiametals.com and follow CAML on Twitter at @CamlMetals and on LinkedIn at Central Asia Metals Plc
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
END
UPDKFLFFXZLFBBE
(END) Dow Jones Newswires
April 12, 2023 02:00 ET (06:00 GMT)
1 Year Central Asia Metal Chart |
1 Month Central Asia Metal Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions