ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

WNR Western Refining Inc. Western Refining, Inc.

36.18
0.00 (0.00%)
Last Updated: 00:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type
Western Refining Inc. Western Refining, Inc. NYSE:WNR NYSE Common Stock
  Price Change % Change Share Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 36.18 0 00:00:00

US Refinery Status: Valero Corpus Christi Hydrocracker Shut

08/10/2009 2:52pm

Dow Jones News


Western Refining (NYSE:WNR)
Historical Stock Chart


From Dec 2019 to Dec 2024

Click Here for more Western Refining Charts.

The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.

Valero Energy Corp. (VLO) a hydrocraker unit in the West Plant at its Corpus Christi, Texas, refinery was shuttered Wednesday by a small, brief fire. The company does not yet know when the unit will be restarted. An SMR unit also shut following the fire is expected to restart Saturday.

Sunoco Inc. (SUN) said Tuesday that it will indefinitely idle its Eagle Point refinery located in Westville, NJ. The process will take four to six weeks.

Exxon Mobil Corp. (XOM) Tuesday restarted two unnamed units that were unexpectedly shut Saturday at its Torrance, Calif., refinery.

Frontier Oil Corp. (FTO) cut throughput at its 130,000 barrels a day El Dorado, Kansas, refinery by 51% in October to 58,000 barrels a day, down from 118,000 barrels a day in the previous month due to planned maintenance on the FCCU and gofiner unit. Its 48,000 barrels a day Cheyenne, Wyo., refinery is expected to process 44,250 barrels of crude oil a day in Oct, from 40,200 the previous month.

Total SA (TOT) said a Powerstation cogeneration turbine was reduced to its lowest firing rate early Thursday due to a leaky exchanger at its Port Arthur refinery.

   BP Plc (BP) Wednesday shut a power station boiler at its Texas City, Texas Plant for seven days. 

Citgo Petroleum Corp delayed the restart of the alkylation unit that was involved in a near-fatal explosion on July 19. The unit will is now expected to return to service by the end of the month, sources close to the plant's operaitons said Tuesday.

Tesoro Corp. (TSO) said Tuesday that it expects to restart a coking unit at full rates in mid-October after a fire caused it to shut down last month.

For more detailed information, search Dow Jones Newswires using the code N/REF.

 
 
Operator   Refinery    Capacity   Description                  Restart 
                       (in 000s 
                       bbl/day) 
 
UNPLANNED 
 
CANADA 
 
EAST COAST 
 
Conoco     Linden, NJ    238.0  Officials consider run cuts      n/a 
                                due to slack demand, a per- 
                                son familiar with operations 
                                said on July 17. 
 
CARIBBEAN 
 
GULF COAST 
 
Citgo      Corpus        163.0  Alkylation unit shut July 19     end-Oct 
                                by near-fatal explosion to 
                                return to service by end-Oct. 
                                The restart was delayed from 
                                early-Oct due to safety issues. 
 
Valero     Corpus        142.0  West Plant Hydrocracker unit     n/a 
           Tx                   shut Oct. 7 due to small, 
                                brief fire. No restart esti- 
                                mate.  An SMR unit was shut 
                                for maintenance after the 
                               fire; restart Oct. 10. 
 
Total      Port Arthur   232.0  Powerstation cogen turbine 
                                reduced to its "lowest 
                                firing rate" Oct. 8 due to 
                                leaky exchanger; nitrogen 
                                oxide steam taken out of 
                                service. 
 
 
Shell      Deer Park,    340.0  Hydrocracking unit was re-       Oct 2 
           TX                   started Oct 2 after severe 
                                weather caused a large charge 
                                pump to shut down. 
 
 
MIDWEST 
 
ROCKY MOUNTAINS 
 
WEST COAST 
 
Exxon      Torrance, CA  149.5  Restarted two unnamed units      Oct 6 
                                Oct. 6 that were 
                                unexpectedly shut Oct. 3. 
 
Conoco      Wilmington   139.0  Unknown process upset 
                                reported Sept. 23 
 
Conoco      Rodeo        120.0  Reports flaring Sept. 29 
 
Tesoro      Wilmington    96.8  Expects to restart coking        Mid-Oct 
                                unit at full rates mid-Oct 
                                that was shut due to a fire 
                                Sept. 25. 
 
PLANNED 
 
CANADA 
 
CARIBBEAN 
 
Valero     Aruba         235.0  The refinery that was shut 
                                in June for 2-3 months for 
                                economic reasons is being 
                                closed indefinitely. 
 
EAST COAST 
 
Sunoco    Westville, NJ  145.0  Idling all refining              Mid-Nov 
                                operations indefinitely due 
                                to poor economics, Co. said 
                                Oct. 6. It will take 4-6 
                                weeks to work through crude 
                                stocks to shut down. 
 
 
Sunoco     Philadelphia, 340.0  FCCU at Girard Point in re-      Sep 14 
           PA                   start Sep 14 following about 
                                five weeks of turnaround 
                                maintenance. 
 
                                Reformer unit shut in Girard     n/a 
                                Point section in early Oct 
                                for economic reasons. Shutdown 
                                to last 1-6 months. 
 
Valero     Delaware City 210.0  Coker Unit shut Oct 3-4 and      n/a 
           DE                   related gasifier unit to shut 
                                within a few days for economic 
                                reasons. 
                                Maintenance at 80,000-b/d 
                                FCCU delayed to Nov./Dec. 
 
Western    Yorktown       64.5  Planned work scheduled 1Q 2010. 
           Va. 
 
 
GULF COAST 
 
Alon       Krotz Springs  80.0  Plantwide turnaround starts      Jan. 
           LA.                  Jan. 1 to last 21 days.          21/22 
 
BP        Texas City, TX 467.0  Ultraformer No. 4, Ultra-        Early 
                                cracker unit and Aromatics       Oct. 
                                recovery unit shut for planned 
                                seasonal turnaround mainte- 
                                nance starting on Sept. 2; 
                                restart seen in 4-5 weeks. 
                                Shut Power Station No. 4        Oct. 14 
                                Boiler, B-430 for planned 
work starting Oct. 7. 
 
Chevron    Pascagoula,   330.0  Pre-commercial heavy oil         2010 
           Miss.                conversion project delayed 
                                from 2008 to 2010 due to 
                                economic factors. 
 
Conoco     Sweeny, TX    247.0  Six weeks of turnaround work     Oct 30 
                                starts Sept. 14 at Units 14, 
                                9, 38 and 27, which is an 
                                FCCU. 
 
                                Tail gas incinerator shut during  Nov. 1 
                                fall turnaround Sept. 30 
 
Exxon      Baytown       572.5  FCCU No. 3 shut Sep 15. for 
           TX                   planned maintenance. 
 
Flint      Corpus        288.1  $250 mln project for new         Spr 
Hills      Christi, TX          diesel desulfurization,          2010 
                                sulfur recovery unit to begin 
                                in Fall 2008. Construction 
                                to last 18 months. 
 
Marathon   Garyville     245.0  Project to increase crude oil    4Q 
           LA                   refining capacity by 180,000-    2009 
                                b/d 85% complete, as of end 
                                April. New units expected 
                                start up in 4Q 2009. 
 
Motiva     Port Arthur   285.0  Expansion project to increase    1Q 
           TX                   throughput capacity by 325,000   2012 
                                b/d, to 610,000-b/d, slowed. 
                                Completion now seen 1Q 
                                2012, from 2010. 
 
Shell      Deer Park,    340.0  Hydroprocessing unit, cata-      Oct 24 
                                lytic cracker unit and alky- 
                                lation shut between Oct 1 and 
                                Oct 24 for fall turnaround 
                                maintenance. 
 
Total      Port Arthur   232.0  Shut unit 805 for Oct. 8 
                                maintenance on Oct. 5. 
                                Shut unit 810 for work Sept.22 
                                Unit 822 restarted Sept. 29 
                                Restarted 837 Oct. 1 
 
Valero     Corpus        340.0  Coker unit shutdown for econo-   n/a 
           Christi, TX          mic reasons and planned work; 
                                delayed to June 19 from June 
                                12. The 20,000-b/d unit will 
                                remain off line through July 
                                but could restart at any time 
                                if margins improve. 
 
                                20,000-b/d FCCU in East          n/a 
                                Plant shut; West Plant 
                                50,000-b/d FCCU at reduced 
                                rates since mid-Dec for 
                                economic reasons. 
 
Valero     Norco, LA     250.0  Upgrade project to build         2012 
                                a new diesel hydrotreater 
                                unit moved from 2010 to 
                                4Q 2012. 
 
 
 
                                Turnaround at coker unit         1Q 
                                delayed until 1Q 2010 
                                from 4Q 2009. 
                                The coker will operate at 
                                50% of capacity when 
                                  restarted due to poor 
                                economics. 
 
Valero     Port Arthur   325.0  77,000-b/d FCCU at reduced       n/a 
           TX                   rates since mid-Dec for 
                                economic reasons. 
 
Valero     Sunray, TX    170.0  55,000-b/d FCCU at reduced       n/a 
                                rates since mid-Dec for 
                                economic reasons. 
 
Valero     Three Rivers   95.0  Plant-wide 24-day turnaround     Oct. 2 
           TX                   began Sep 9. Restart seen 
                                around Oct. 2. 
                                24,000-b/d FCCU at reduced       n/a 
                                rates since mid-Dec for 
                                economic reasons. 
 
Western    El Paso      122.0   Planned work scheduled for 1Q 
           TX                   2010. 
 
 
MID-WEST 
 
Conoco     Roxana       306.0   Planned maintenance about to begin, 
           Ill                  co said Sept. 22. 
 
Frontier   El Dorado    130.0   FCCU and hydrotreater (gofiner)  Nov 
           KS                   will be shut in Oct for turn- 
                                around maintenance that takes 
                                place every four years. Crude 
                                throughput cut to 58,000-b/d 
                                during work. 
 
Frontier   Cheyenne      48.0   Refinery will process 44,250 
                                barrels of crude oil through Oct, 
                                Oct, up from 40,200 b/d in Sep. 
 
Husky      Lima          146.2  70% refinery goes down for       Mid-Nov. 
           OH                   planned worked Oct. 1 
 
Marathon   Detroit, MI  102.0   Co pushes back finish date       Late 
                                for heavy oil project.           2012 
 
Sunoco     Toledo, OH   160.0   Planned work to last from        Early Oct. 
                                early Aug to mid-Sep. Co. said 
                                Oct. 1 work finished. 
 
Valero     Memphis, TN   195.0  FCCU upgrade originally slated   2012 
                                for completion in 2009 has been 
                                shifted to 2012. 
 
 
ROCKY MOUNTAINS 
 
Conoco     Billings,      61.0  On Mar 5 the co delayed for      Jan. 
           MT                   one year an expansion project    2010 
                                which will increase capacity 
                                to 71,000 bbls. Construction of 
                                a new crude unit is now scheduled 
                                to begin in January 2010. 
 
Frontier   Cheyenne       52.0  The refinery is operating at     n/a 
           WY                   reduced rates for economic 
                                reasons. 
 
 
WEST COAST 
 
Alon       Paramount     55.0   Hydrocracker project post- 
           CA                   poned indefinitely, the Co. 
                                said on Feb. 4 
 
Chevron    Richmond,    243.0   Judge halts construction on      n/a 
           CA                   expansion project July 1. 
 
 
Flint      North Pole   210.0   One of three processing          n/a 
Hills      AK                   units has been shut due 
                                to low jet fuel demand, 
                                co confirmed on Mar 19. 
 
 

Order free Annual Report for BP plc

Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513

Order free Annual Report for ConocoPhillips

Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513

Order free Annual Report for Chevron Corporation

Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513

Order free Annual Report for Marathon Oil Corporation

Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513

Order free Annual Report for Exxon Mobil Corporation

Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513

 
 

1 Year Western Refining Chart

1 Year Western Refining Chart

1 Month Western Refining Chart

1 Month Western Refining Chart

Your Recent History

Delayed Upgrade Clock