We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Western Refining Inc. Western Refining, Inc. | NYSE:WNR | NYSE | Common Stock |
Price Change | % Change | Share Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 36.18 | 0 | 00:00:00 |
The following table lists unplanned and planned production outages at U.S. refineries as reported by Dow Jones Newswires. The information is compiled from both official and unofficial refining sources and doesn't purport to be a comprehensive list.
ConocoPhillips (COP) will shut an amine unit at its Borger, Texas, refinery for planned maintenance on Oct. 9-24. The Wilmington, Calif., plant discovered a 1 barrel petroleum spill ina containment area from an underground pipe.
Valero Energy Corp. (VLO) said that a gulfining unit at its Port Arthur, Texas, refinery experienced a snag, but it did noAlon USA Energy Inc. (ALJ) t affect operations. The company also said it will restart a tank in the east plant of its Corpus Christi, Texas, refinery.
Alon USA Energy Inc. (ALJ) Thursday said that its Big Spring, Texas, refinery was adding a new ultra low sulfur gasoline unit as planned.
Citgo Petroleum Corp. reported Thursday that two gasoline-making units experienced a brief snag when the regnerator temperature dropped.
For more detailed information, search Dow Jones Newswires using the code N/REF.
Operator Refinery Capacity Description Restart (in 000s bbl/day) UNPLANNED CANADA EAST COAST Conoco Linden, NJ 238.0 Officials consider run cuts n/a due to slack demand, a per- son familiar with operations said on July 17. CARIBBEAN GULF COAST Citgo Corpus 163.0 Alkylation unit shut July 19 end-Oct by near-fatal explosion to return to service by end-Oct. The restart was delayed from early-Oct due to safety issues. FCCU No. 1 and 2 experience snag when the regenerator temperature dropped; lasted 18 minutes Oct. 8. Valero Corpus 142.0 West Plant Hydrocracker unit n/a Tx shut Oct. 7 due to small, brief fire. No restart esti- mate. An SMR unit was shut for maintenance after the fire; restart Oct. 10. Restarting East Plant's Tank 79 on Oct. 9. Total Port Arthur 232.0 Powerstation cogen turbine reduced to its "lowest firing rate" Oct. 8 due to leaky exchanger; nitrogen oxide steam taken out of service. Gulfining unit experiences snag; no impact to operations. Shell Deer Park, 340.0 Hydrocracking unit was re- Oct 2 TX started Oct 2 after severe weather caused a large charge pump to shut down. MIDWEST ROCKY MOUNTAINS WEST COAST Exxon Torrance, CA 149.5 Restarted two unnamed units Oct 6 Oct. 6 that were unexpectedly shut Oct. 3. Conoco Wilmington 139.0 Unknown process upset reported Sept. 23 Conoco Rodeo 120.0 Reports flaring Sept. 29 Tesoro Wilmington 96.8 Expects to restart coking Mid-Oct unit at full rates mid-Oct that was shut due to a fire Sept. 25. PLANNED CANADA CARIBBEAN Valero Aruba 235.0 The refinery that was shut in June for 2-3 months for economic reasons is being closed indefinitely. EAST COAST Sunoco Westville, NJ 145.0 Idling all refining Mid-Nov operations indefinitely due to poor economics, Co. said Oct. 6. It will take 4-6 weeks to work through crude stocks to shut down. Sunoco Philadelphia, 340.0 FCCU at Girard Point in re- Sep 14 PA start Sep 14 following about five weeks of turnaround maintenance. Reformer unit shut in Girard n/a Point section in early Oct for economic reasons. Shutdown to last 1-6 months. Valero Delaware City 210.0 Coker Unit shut Oct 3-4 and n/a DE related gasifier unit to shut within a few days for economic reasons. Maintenance at 80,000-b/d FCCU delayed to Nov./Dec. Western Yorktown 64.5 Planned work scheduled 1Q 2010. Va. GULF COAST Exxon Borger, Tx 146.0 Shutting amine unit for planned Oct. 24 maintenance Oct. 9-24. Alon Krotz Springs 80.0 Plantwide turnaround starts Jan. LA. Jan. 1 to last 21 days. 21/22 BP Texas City, TX 467.0 Ultraformer No. 4, Ultra- Early cracker unit and Aromatics Oct. recovery unit shut for planned seasonal turnaround mainte- nance starting on Sept. 2; restart seen in 4-5 weeks. Shut Power Station No. 4 Oct. 14 Boiler, B-430 for planned work starting Oct. 7. Chevron Pascagoula, 330.0 Pre-commercial heavy oil 2010 Miss. conversion project delayed from 2008 to 2010 due to economic factors. Conoco Sweeny, TX 247.0 Six weeks of turnaround work Oct 30 starts Sept. 14 at Units 14, 9, 38 and 27, which is an FCCU. Tail gas incinerator shut during Nov. 1 fall turnaround Sept. 30 Exxon Baytown 572.5 FCCU No. 3 shut Sep 15. for TX planned maintenance. Flint Corpus 288.1 $250 mln project for new Spr Hills Christi, TX diesel desulfurization, 2010 sulfur recovery unit to begin in Fall 2008. Construction to last 18 months. Marathon Garyville 245.0 Project to increase crude oil 4Q LA refining capacity by 180,000- 2009 b/d 85% complete, as of end April. New units expected start up in 4Q 2009. Motiva Port Arthur 285.0 Expansion project to increase 1Q TX throughput capacity by 325,000 2012 b/d, to 610,000-b/d, slowed. Completion now seen 1Q 2012, from 2010. Shell Deer Park, 340.0 Hydroprocessing unit, cata- Oct 24 lytic cracker unit and alky- lation shut between Oct 1 and Oct 24 for fall turnaround maintenance. Total Port Arthur 232.0 Shut unit 805 for Oct. 8 maintenance on Oct. 5. Shut unit 810 for work Sept.22 Unit 822 restarted Sept. 29 Restarted 837 Oct. 1 Valero Corpus 340.0 Coker unit shutdown for econo- n/a Christi, TX mic reasons and planned work; delayed to June 19 from June 12. The 20,000-b/d unit will remain off line through July but could restart at any time if margins improve. 20,000-b/d FCCU in East n/a Plant shut; West Plant 50,000-b/d FCCU at reduced rates since mid-Dec for economic reasons. Valero Norco, LA 250.0 Upgrade project to build 2012 a new diesel hydrotreater unit moved from 2010 to 4Q 2012. Turnaround at coker unit 1Q delayed until 1Q 2010 from 4Q 2009. The coker will operate at
50% of capacity when restarted due to poor economics. Valero Port Arthur 325.0 77,000-b/d FCCU at reduced n/a TX rates since mid-Dec for economic reasons. Valero Sunray, TX 170.0 55,000-b/d FCCU at reduced n/a rates since mid-Dec for economic reasons. Valero Three Rivers 95.0 Plant-wide 24-day turnaround Oct. 2 TX began Sep 9. Restart seen around Oct. 2. 24,000-b/d FCCU at reduced n/a rates since mid-Dec for economic reasons. Western El Paso 122.0 Planned work scheduled for 1Q TX 2010. Alon Big Spring 67.0 Adding a new ultra low sulfur TX gasoline unit; no timeline when unit will be operational MID-WEST Conoco Roxana 306.0 Planned maintenance about to begin, Ill co said Sept. 22. Frontier El Dorado 130.0 FCCU and hydrotreater (gofiner) Nov KS will be shut in Oct for turn- around maintenance that takes place every four years. Crude throughput cut to 58,000-b/d during work. Frontier Cheyenne 48.0 Refinery will process 44,250 barrels of crude oil through Oct, Oct, up from 40,200 b/d in Sep. Husky Lima 146.2 70% refinery goes down for Mid-Nov. OH planned worked Oct. 1 Marathon Detroit, MI 102.0 Co pushes back finish date Late for heavy oil project. 2012 Sunoco Toledo, OH 160.0 Planned work to last from Early Oct. early Aug to mid-Sep. Co. said Oct. 1 work finished. Valero Memphis, TN 195.0 FCCU upgrade originally slated 2012 for completion in 2009 has been shifted to 2012. ROCKY MOUNTAINS Conoco Billings, 61.0 On Mar 5 the co delayed for Jan. MT one year an expansion project 2010 which will increase capacity to 71,000 bbls. Construction of a new crude unit is now scheduled to begin in January 2010. Frontier Cheyenne 52.0 The refinery is operating at n/a WY reduced rates for economic reasons. WEST COAST Alon Paramount 55.0 Hydrocracker project post- CA poned indefinitely, the Co. said on Feb. 4 Chevron Richmond, 243.0 Judge halts construction on n/a CA expansion project July 1. Flint North Pole 210.0 One of three processing n/a Hills AK units has been shut due to low jet fuel demand, co confirmed on Mar 19.
Order free Annual Report for BP plc
Visit http://djnewswires.ar.wilink.com/?link=BP or call 1-888-301-0513
Order free Annual Report for ConocoPhillips
Visit http://djnewswires.ar.wilink.com/?link=COP or call 1-888-301-0513
Order free Annual Report for Chevron Corporation
Visit http://djnewswires.ar.wilink.com/?link=CVX or call 1-888-301-0513
Order free Annual Report for Marathon Oil Corporation
Visit http://djnewswires.ar.wilink.com/?link=MRO or call 1-888-301-0513
Order free Annual Report for Exxon Mobil Corporation
Visit http://djnewswires.ar.wilink.com/?link=XOM or call 1-888-301-0513
1 Year Western Refining Chart |
1 Month Western Refining Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions