ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

THR Thor Energy Plc

1.20
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Thor Energy Plc LSE:THR London Ordinary Share GB00BRJ52319 ORD GBP0.001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 1.20 1.10 1.30 1.20 1.20 1.20 64,216 08:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Misc Nonmtl Minrls, Ex Fuels 0 -520k -0.0019 -6.32 3.34M

Thor Mining PLC TUNGSTEN EXPANSION DRILLING - SUPPLEMENTARY ADVICE (8968N)

14/08/2017 10:00am

UK Regulatory


Thor Energy (LSE:THR)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Thor Energy Charts.

TIDMTHR

RNS Number : 8968N

Thor Mining PLC

14 August 2017

14 August 2017

THOR MINING PLC

SUPPLEMENTARY ADVICE

The Directors of Thor Mining PLC advise that the following updated version of the announcement dated 10 August 2017 was today released on the Australian Securities Exchange ("ASX"). The updated announcement contains additional information concerning, inter alia, the determination of the copper equivalent grade stated in the original announcement and further information on the exploration targets identified in Table 2.

THOR MINING PLC

TUNGSTEN EXPANSION DRILLING - PILOT MOUNTAIN, NEVADA USA

SUPPLEMENTARY ADVICE

The Board of Thor Mining Plc ("Thor" or the "Company") (AIM, ASX: THR), is pleased to advise the commencement of drilling in a campaign designed to expand the tungsten resource at the Company's wholly owned Pilot Mountain tungsten project in Nevada, USA (Figure 1).

The program comprises four reverse circulation ("RC") drill holes and two diamond ("DD") drill holes designed to confirm and expand upon existing high-grade drill intersections at the Good Hope deposit, and also further test for extensions of high grade mineralisation, intersected in the Desert Scheelite resource in 2012. The program follows drilling success and resource upgrade earlier in 2017.

Highlights:

Good Hope deposit - four RC holes each of up to 150 metres depth designed to confirm and extend high grade tungsten (WO ), copper (Cu), and zinc (Zn) mineralisation, including 36.5 m @ 0.4% WO , 0.25% Cu, and 0.47% Zn

Desert Scheelite deposit - two RC holes, each with a diamond core tail to test for extensions below high grade mineralisation previously intersected

Tungsten price uplift - a recent increase in the published APT tungsten price takes the cumulative increase for the year to 25%

Mr Mick Billing, Executive Chairman of Thor:

"The Pilot Mountain drilling program at Good Hope and Desert Scheelite demonstrates our strong belief that Pilot Mountain will become a very significant multi commodity deposit. We are particularly encouraged by the recent tungsten price improvement showing tightness in the market, during what is normally a period of seasonal weakness.

"The program is expected to cost no more than US$250,000 and is scheduled to last two to three weeks with assay results due several weeks after."

Thor's Pilot Mountain Project is located approximately 200 kilometres ("km") south of the city of Reno and 20km east of the town of Mina located on US Highway 95.

The Pilot Mountain Project comprises four tungsten deposits: Desert Scheelite, Gunmetal, Garnet and Good Hope. All are in close proximity (three kms) to each other and have been subjected to small-scale mining activities at various times during the 20th century. Union Carbide acquired the project in 1978, for US$7.0 million (estimated at US$26million - US$40million in 2017 dollars), and conducted detailed exploration and feasibility activities until, following a global downturn in the tungsten industry in the 1980s, they suspended further work.

.A drill program in 2012 at Desert Scheelite facilitated the estimate and publication of a resource estimate for that deposit, shown in Table 1. Importantly, the final hole of the program intersected 17.5m @ 1.80% Cu plus 2.2% Zn and 32 g/t Ag, along with 13.5m of 0.89% WO . At current commodity prices (US$2.91/lb Cu, US$1.32/lb Zn, US$16.90/oz Ag, and US$245/mtu WO ) this delivers an equivalent copper grade of 5.7%#. This program has been designed to test for high grade extensions to that mineralisation at depth.

# Note copper equivalence was determined upon the following commodity prices on 8 August 2017:

   --      Commodity prices; US$2.91/lb Cu, US$1.32/lb Zn, US$16.90/oz Ag, and US$245/mtu WO 
   --      Metallurgical recovery of 80% for each element 

-- Copper Equivalent grade is comprised of the sum of the equivalent copper grades of the contributing elements weighted by respective metallurgical recoveries. The individual copper equivalent grade for each element is determined as follows: element price per pound / copper price per pound X interval grade

DSDD015 falls within the Desert Scheelite Inferred Resource and has thus been independently determined to have a reasonable likelihood of economic extraction.

Good Hope comprises a small inlier (window) of mineralised skarn exposed within an area overlain by younger volcanic rock. The area has been worked to some extent with small scale exploratory shafts, plus trenches & adits but little systematic exploration of basement below the volcanic cover is apparent.

Exposed mineralisation in the exploration trenches and the vertical extent of mineralisation in RGH-02 indicate Good Hope mineralisation is likely to be steeply dipping and similar to the Desert Scheelite deposit rather than the flat lying mineralisation to the west.

This drill program has been designed to confirm and extend high grade tungsten, copper, and zinc mineralisation, including 36.5m @ 0.4% WO , 0.25% Cu, and 0.47% Zn.

Table 1: Pilot Mountain Resource Summary 2017 (JORC 2012) - 100% owned by Thor Mining Plc. Announced May 21 2017

 
                         Resource        WO(3)                Ag                 Cu 
                             MT    Grade   Contained   Grade  Contained   Grade  Contained 
                                     %       metal      g/t     metal       %      metal 
                                              (t)                (t)                (t) 
------------  -----------  ------  -----  ----------  ------  ---------  ------  --------- 
 Garnet        Indicated             -     - 
  Inferred                  1.83   0.36      6,590 
 ------------------------  ------  -----  ----------  ------  ---------  ------  --------- 
  Sub 
   Total                    1.83   0.36      6,590 
 ------------------------  ------  -----  ----------  ------  ---------  ------  --------- 
 Desert 
  Scheelite    Indicated    8.41   0.27     22,700     21.3      179      0.14    11,800 
  Inferred                  1.49   0.23      3,430     9.07      13       0.17     2,500 
 ------------------------  ------  -----  ----------  ------  ---------  ------  --------- 
  Sub 
   Total                    9.90   0.26     26,130     19.39     192      0.14    14,300 
 ------------------------  ------  -----  ----------  ------  ---------  ------  --------- 
 Summary       Indicated    8.41   0.27     22,700 
  Inferred                  3.32   0.30     10,020 
 ------------------------  ------  -----  ----------  ------  ---------  ------  --------- 
 Pilot Mountain 
  Total                     11.73  0.28     32,720 
-------------------------  ------  -----  ----------  ------  ---------  ------  --------- 
 

Note: All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due to rounding.

In addition to the resource estimate (above), exploration targets (summarised in Table 2) tonnes and grades have been determined. Even partial success in the conversion of these targets will add significantly to the project value.

 
 Table 2: Summary of Pilot Mountain exploration 
  targets 
------------------------------------------------------------------- 
                      Tonnage   % WO(3)   Comment 
                       (Mt) 
-------------------  --------  --------  -------------------------- 
 Tier 1 Exploration   6.0 -     0.3       Based on historic 
  Targets*             10.5      - 0.5     drill intersections 
-------------------  --------  --------  -------------------------- 
 Tier 2 Exploration   3.5 -     0.2       Based on favourable 
  Targets*             9.1       - 0.4     geology and proximity 
                                           to known mineralisation. 
-------------------  --------  --------  -------------------------- 
 Total Exploration    9.5 -     0.2       Combined Tier 1 
  Target*              19.6      - 0.5     & 2 
-------------------  --------  --------  -------------------------- 
 

Note:

Recent and historic drilling at the Pilot Mountain project comprised in excess of 350 drill holes.

Other mineralisation exposures include multiple historic mine openings and natural surface outcrop.

Exploration to test these targets will comprise drilling as described in this announcement. Geophysical survey possibly comprising IP and gravity methods may also be undertaken to develop further targets in areas of alluvial cover.

Tier 1 Exploration targets* at Pilot Mountain are based on 1970s drilling undertaken by Union Carbide Corporation and total 6.0 to 10.5 Mt at 0.2 to 0.4% WO(3) (Table 2).

*Exploration targets are conceptual in nature and there has been insufficient exploration to define a Mineral Resource under the JORC Code and it is uncertain if further exploration will result in the determination of a Mineral Resource.

Enquiries:

 
    Mick Billing           +61 (8) 7324         Thor Mining              Executive 
                            1935                 PLC                      Chairman 
    Ray Ridge              +61 (8) 7324         Thor Mining              CFO/Company 
                            1935                 PLC                      Secretary 
    Colin Aaronson/        +44 (0) 207 383      Grant Thornton           Nominated 
     Daniel Bush/           5100                 UK LLP                   Adviser 
     Richard Tonthat 
    Elliot Hance            +44 (0) 207382      Beaufort Securities      Joint Broker 
                             8300                Limited 
    Nick Emerson           +44 (0) 1483         SI Capital Ltd           Joint Broker 
     / Andy Thacker         413 500 
    Tim Blythe/            +44 (0) 207 138      Blytheweigh              Financial 
     Camilla Horsfall       3222                                          PR 
 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's twitter page @ThorMining.

Competent Person's Report

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

About Thor Mining PLC

Thor Mining PLC is a resources company quoted on the AIM Market of the London Stock Exchange and on ASX in Australia.

Thor holds 100% of the advanced Molyhil tungsten project in the Northern Territory of Australia, for which an updated feasibility study in 2015(1) suggested attractive returns. Thor also holds 100% of the Pilot Mountain tungsten project in Nevada USA which has a JORC 2012 Indicated Resources Estimate(2) on 1 of the 4 known deposits.

In February 2017, Thor completed the sale of its Spring Hill Gold project(3) for A$3.5million on receiving A$1.5 for its residual 40% interest in the project. Thor holds, further, a production royalty entitlement of:

-- A$6 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for up to A$1,500 per ounce; and

-- A$14 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for amounts over A$1,500 per ounce.

Notes

   --     (1) Refer ASX and AIM announcement of 12 January 2015 
   --     (2) Refer AIM announcement of 22 May 2017 and ASX announcement of 23 May 2017 
   --     (3) Refer ASX and AIM announcement of 29 February 2016 
   --     At the date of this announcement gold is trading at approximately A$1,610/oz 

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLVZLBFDVFZBBL

(END) Dow Jones Newswires

August 14, 2017 05:00 ET (09:00 GMT)

1 Year Thor Energy Chart

1 Year Thor Energy Chart

1 Month Thor Energy Chart

1 Month Thor Energy Chart

Your Recent History

Delayed Upgrade Clock