ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

THX Thor Explorations Ltd

16.25
0.25 (1.56%)
27 Dec 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Thor Explorations Ltd LSE:THX London Ordinary Share CA8851491040 COM SHS NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.25 1.56% 16.25 16.00 16.50 16.25 15.75 16.00 132,289 15:50:57
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Gold Ores 139.38M 10.87M 0.0166 18.07 104.97M

Thor Explorations Ltd POSITIVE DIAMOND DRILLING RESULTS FROM SEGILOLA

07/10/2024 7:00am

RNS Regulatory News


RNS Number : 0892H
Thor Explorations Ltd
07 October 2024
 

THOR_EXPLORATIONS_FULLCLRLOGO_onwhite

 

NEWS RELEASE

NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR
DISTRIBUTION TO U.S. WIRE SERVICES

                                                                                                                                                                   TSXV: THX

October 7, 2024                                                                                                                             

 

Vancouver, British Columbia

 

 

INITIAL POSITIVE DIAMOND DRILLING RESULTS FROM SEGILOLA GOLD MINE

Thor Explorations Ltd (TSXV / AIM: THX), "Thor" or the "Company"), is a West African-focussed minerals exploration and mining Company, currently producing gold from its wholly owned Segilola Gold Mine in Nigeria and is advancing its Douta Gold Project in Senegal towards development.

Thor is pleased to announce the first set of results from an initial drilling programme that targets the down-plunge potential beneath the current open pit extents at the Segilola Gold Mine.

Significant results received to date include 3.0 metres ("m") grading 11.24 grammes per tonne gold ("g/tAu") from 294m in drillhole SNMDD011 and 1.5m grading 3.22g/tAu from 269m in drillhole SNMDD012. These are the initial results received from the first two holes drilled out of an ongoing 12 hole drilling programme of which five holes have been drilled. Additional drilling results will be published in due course.

Segun Lawson, President & CEO, stated

"We are pleased to intersect high-grade gold mineralisation 50 metres below the current pit design.  This is an encouraging start to the "proof-of-concept" drilling programme, which has returned positive intersections in the projected locations below the current open pit design.  The proof-of-concept drilling programme has been designed to target shallow dipping high grade shoots delineated by the grade control data modelled since the start of mining combined with the interpretations based on additional structural studies.

"This is the first demonstration since we started mining that there is further potentially achievable underground mining below the designed Segilola pit.

"The initial results have come from the southern most shoot and the 12-hole programme is designed to test the remaining shoots as a first pass, prior to extending the programme.

"The target is to both upgrade parts of the remaining inferred resource and to increase the size overall of the underground resource with the objective of increasing the life of mine at Segilola. We look forward to completing the programme and sharing more results in due course."

 

Introduction

 

The high grade Segilola gold deposit is located on the major regional shear zone that extends for several hundred kilometres through the gold-bearing Ilesha schist belt (structural corridor) of Nigeria.

Gold mineralisation is developed within an overturned sequence of metamorphosed, strongly foliated meta-sediments at the boundary between the basement biotite gneiss (Hanging wall) and calc-silicate and mylonitic biotite-garnet schists (Foot wall). A unit of massive to foliated granodiorite conformably intrudes the sequence between the quartzites and basement gneisses. Gold mineralisation is developed with steep west-dipping parallel lodes that comprise late-stage silica-altered zones that are commonly referred to as "veins" and which are restricted to the meta-sedimentary unit.

 

Segilola Exploration Targeting

 

The southern lodes are characterised by a pronounced southerly plunging geometry (Figure 1). Within the broader zone of gold mineralisation two high grade shoots, that show good continuity at a 10g/tAu cut off, are developed (Figure 2B). The inferred down-plunge extensions of these two shoots, referred to as ribbons R1 and R2, form the primary drilling targets (Figure 2C). The initial drillholes were completed to test the ribbon concept with further step-out drilling dependent on the outcomes. The significant intersections are shown in Table 1.

A diagram of a graph Description automatically generated with medium confidence

 

Figure 1: Completed Grade Control Drilling over Resource Drilling Model. Drilling results from southern most shoot (Green Arrow)

 

 

A screenshot of a computer screen Description automatically generated

 

Figure 2A: Longitudinal sections of the southern portion of the Segilola Deposit showing high grade shoots (ribbons) R1 and R2 developed within broader halo of lower grade mineralisation.

Other drillholes excluded for clarity

 

 

Hole ID

Easting

Northing

Depth

Dip

Azimuth

From     (m)

To    (m)

Interval    (m)

Grade (g/tAu)

True Width (m)

SNMDD011

4036

11001

313

-55

90

293.8

296.8

3.0

11.24

2.4

SNMDD012

4055

10834

290

-50

90

269.2

270.6

1.5

3.22

1.2

 

Table 1: Significant Drillhole Intersections at a 1.5g/tAu cut off

 

 

Hole SNMDD011 intersected the lower ribbon R2 with a 3.0m downhole interval grading 11.24g/tAu at approximately 50m below the current final pit design (Figure 2B). The true width of 2.4m would satisfy the minimum mining width criteria for the development of an underground resource. Figure 2B also shows the historic drillhole SGD111 which appears to have intersected the lode below the projected R1 ribbon. Hole SNMDD012 intersected the upper ribbon R1 with a 1.5m downhole interval grading 3.22g/tAu.

 

A graph showing a slope Description automatically generated with medium confidence

 

Figure 2B: SNMDD011 Cross Section

 

It should be noted that there are numerous historic exploration drillholes in the target area. All holes intersected the resource lode. However, only a few of these holes specifically intersected the R1 and R2 ribbons. Results from additional proof of concept drillholes, which follows the R2 ribbon down-plunge, are pending.

 

Conclusions

 

·    The initial drilling results appear to have validated the proof-of-concept high-grade targeting model.

·    The initial results suggest that the minimum underground mining width can be achieved at a suitable grade.

·    There is justification to continue with an expanded drilling programme.

 

 

Qualified Person
The above information has been prepared under the supervision of Alfred Gillman (Fellow AusIMM, CP), who is designated as a "qualified person" under National Instrument 43-101 and the AIM Rules and has reviewed and approves the content of this news release. He has also reviewed QA/QC, sampling, analytical and test data underlying the information.

 

 

THOR EXPLORATIONS LTD.
Segun Lawson
President & CEO

 

For further information please contact:

 

Thor Explorations Ltd

Email: info@thorexpl.com

 

Canaccord Genuity (Nominated Adviser & Broker)

Henry Fitzgerald-O'Connor / James Asensio / Harry Rees

 

Tel: +44 (0) 20 7523 8000

 

Hannam & Partners (Broker)

Andrew Chubb / Matt Hasson / Nilesh Patel / Franck Nganou

 

Tel: +44 (0) 20 7907 8500

 

BlytheRay (Financial PR)                                      

Tim Blythe / Megan Ray / Said Izagaren

Tel: +44 2071 383 204   

 

Yellow Jersey PR (Financial PR)                                      

Charles Goodwin / Shivantha Thambirajah / Zara McKinlay

Tel:  +44 (0) 20 3004 9512

 

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release does not constitute an offer to purchase securities. The securities to be offered in the offering have not been and will not be registered under the United States Securities Act of 1933, as amended, or any state securities laws and may not be offered or sold in the United States or to, or for the benefit or account of, a U.S. person, except pursuant to an available exemption from such registration requirements.

 

Cautionary Note Regarding Forward-Looking Statements

Except for the statements of historical fact contained herein, the information presented constitutes "forward looking statements" within the meaning of certain securities laws, and is subject to important risks, uncertainties and assumptions  that could cause the actual results of the Company to differ materially form the forward-looking statements. Such forward-looking statements, including but not limited to, the Company's ability to fully finance the Project, to bring the Project into operation or to produce gold from the Project, and the use of the proceeds.  The words "may", "could", "should", "would", "suspect", "outlook", "believe", "anticipate", "estimate", "expect", "intend", "plan", "target" and similar words and expressions are used to identify forward-looking information. The forward-looking information in this news release describes the Company's expectations as of the date of this news release and accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. While the Company may elect to, it does not undertake to update this information at any particular time.https://www.globenewswire.com/newsroom/ti?nf=NzMzNzE2NSMyNDI1OTc2IzIwOTA1NzE=

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLKZMGGGVKGDZZ

1 Year Thor Explorations Chart

1 Year Thor Explorations Chart

1 Month Thor Explorations Chart

1 Month Thor Explorations Chart

Your Recent History

Delayed Upgrade Clock