ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

SDX Sdx Energy Plc

3.60
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Sdx Energy Plc LSE:SDX London Ordinary Share GB00BJ5JNL69 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 3.60 3.50 3.70 3.60 3.60 3.60 42,626 08:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

SDX Energy PLC 1ST PHASE MOROCCAN DRILLING SUCCESSFULLY COMPLETED (2361D)

28/06/2021 7:00am

UK Regulatory


Sdx Energy (LSE:SDX)
Historical Stock Chart


From Apr 2021 to Apr 2024

Click Here for more Sdx Energy Charts.

TIDMSDX

RNS Number : 2361D

SDX Energy PLC

28 June 2021

THE INFORMATION CONTAINED WITHIN THIS ANNOUNCEMENT IS DEEMED BY SDX TO CONSTITUTE INSIDE INFORMATION AS STIPULATED UNDER THE MARKET ABUSE REGULATION (EU) NO. 596/2014 AS IT FORMS PART OF UK LAW BY VIRTUE OF THE EUROPEAN UNION (WITHDRAWAL) ACT 2018 ("MAR"). ON THE PUBLICATION OF THIS ANNOUNCEMENT VIA A REGULATORY INFORMATION SERVICE ("RIS"), THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.

28 June 2021

SDX ENERGY PLC ("SDX", the "Company" or the "Group")

SUCCESSFUL COMPLETION OF THE FIRST PHASE OF DRILLING OPERATIONS IN MOROCCO

SDX Energy Plc (AIM: SDX), the MENA-focused energy company, is pleased to announce the successful completion of the initial three well phase of its 2021 drilling campaign in Morocco, which will comprise up to a total of five wells over the year.

Mark Reid, CEO of SDX, commented:

"I am pleased to announce that the Company has successfully drilled the first three wells of its 2021 drilling activities which will total up to eleven wells across our portfolio of assets. The OYF-3, KSR-17 and KSR-18 wells in Morocco were all commercial successes, and OYF-3 and KSR-17 are already connected and producing into our infrastructure. We expect KSR-18 to be tested and connected in the next two weeks. The gross 1.5-1.6bcf reserves added by these wells is in line with pre-drill P50 estimates and it is anticipated that this will enable us to continue to deliver gas to our customers in line with their contractual requirements. We will now commence the preparations to drill up to two additional wells in Morocco later in the year.

In Egypt we are expecting to commence the drilling of the IY-2 step out development well at South Disouq in the coming days, and our planning for the potentially transformational HA-1X exploration well is significantly progressed, with spud expected in Q3 2021. This gross 139bcf prospective target, which has a 33% chance of success, has the potential to significantly transform the resource profile of the Company. Finally, with the four well campaign in West Gharib also expected to start soon, I look forward to updating the market in the coming months on what is looking to be a very busy and exciting period of activity."

Moroccan Drilling Campaign

This first phase of the Morocco drilling campaign consisted of three appraisal/development wells in SDX's operated Gharb Basin acreage in Morocco (SDX: 75% working interest).

The first well, OYF-3, which spud on 30 April 2021, reached its TD at 1,183 metres MD on 11 May 2021. The main Guebbas reservoir target was thicker than expected and encountered a 5.2 metre net gas sand. The well also encountered a 1.7 metre net gas sand in a secondary zone that OYF-3 will also produce from.

The second well, KSR-17, was spud on 13 May 2021 and reached its TD at 1,848 metres MD on 27 May 2021. In the main Hoot reservoir, the well encountered a 5.3 metre net gas sand which was slightly thinner than expected, but with very good reservoir properties.

Both OYF-3 and KSR-17 have been tested, connected, and are now producing into our infrastructure. Post-drill P50 reserves are estimated at a combined gross 0.81bcf recoverable which is in line with predrill estimates.

Finally, the third well of the campaign, KSR-18, was spud on 30 May 2021 and reached its TD of 1,905 metres MD on 14 June 2021. Both prognosed targets were successfully encountered, with the shallower Mid Guebbas target comprising of a 3.8 metre net gas sand and the main Hoot target encountering a 13.9 metre net gas sand. As expected, the main Hoot had been slightly depleted by production from a nearby well, however the well is still expected to contribute incremental volumes and deliverability from this extensive compartment. Further to these zones, a third 5.5 metre net gas sand was encountered at the Base Guebbas and will contribute to production in the future when the Hoot has been depleted. KSR-18 will be tested in the coming weeks to refine volumetrics but based upon logging results, the Company expects that this too will be close to its pre-drill P50 EUR estimate of gross 0.75bcf.

The second phase of the Moroccan drilling campaign is expected to commence in September/October 2021.

About SDX

SDX is an international oil and gas exploration, production, and development company, headquartered in London, United Kingdom, with a principal focus on MENA. In Egypt, SDX has a working interest in two producing assets: a 55% operated interest in the South Disouq gas field in the Nile Delta and a 50% non-operated interest in the West Gharib concession, which is located onshore in the Eastern Desert, adjacent to the Gulf of Suez. In Morocco, SDX has a 75% working interest in five development/production concessions, all situated in the Gharb Basin. The producing assets in Morocco are characterised by attractive gas prices and exceptionally low operating costs. SDX has a strong weighting of fixed price gas assets in its portfolio with low operating costs and attractive margins throughout, providing resilience in a low commodity price environment. SDX's portfolio also includes high impact exploration opportunities in both Egypt and Morocco.

For further information, please see the Company's website at www.sdxenergy.com or the Company's filed documents at www.sedar.com .

Competent Persons Statement

In accordance with the guidelines of the AIM Market of the London Stock Exchange, the technical information contained in the announcement has been reviewed and approved by Rob Cook, VP Subsurface of SDX. Dr. Cook has over 25 years of oil and gas industry experience and is the qualified person as defined in the London Stock Exchange's Guidance Note for Mining and Oil and Gas companies. Dr. Cook holds a BSc in Geochemistry and a PhD in Sedimentology from the University of Reading, UK. He is a Chartered Geologist with the Geological Society of London (Geol Soc) and a Certified Professional Geologist (CPG-11983) with the American Institute of Professional Geologists (AIPG).

For further information:

 
 SDX Energy Plc 
  Mark Reid 
  Chief Executive Officer 
  Tel: +44 203 219 5640 
 Stifel Nicolaus Europe Limited (Nominated Adviser and Joint Broker) 
  Callum Stewart 
  Jason Grossman 
  Ashton Clanfield 
  Tel: +44 (0) 20 7710 7600 
 Peel Hunt LLP (Joint Broker) 
  Richard Crichton 
  David McKeown 
  Tel: +44 (0) 207 418 8900 
 
  Camarco (PR) 
  Billy Clegg/Owen Roberts/Violet Wilson 
  Tel: +44 (0) 203 757 4980 
 
 

Glossary

 
 "bcf"        billion cubic feet 
 "EUR"        estimated ultimate recovery 
             --------------------------------------- 
 "MD"         measured depth 
             --------------------------------------- 
 "P50"        means that there is at least 
               a 50% probability that the quantities 
               actually recovered will equal 
               or exceed the best estimate 
             --------------------------------------- 
 "reserves"   reserves are those quantities 
               of petroleum anticipated to 
               be commercially recoverable 
               by application of development 
               projects to known accumulations 
               from a given date forward under 
               defined conditions. Reserves 
               must further satisfy four criteria: 
               they must be discovered, recoverable, 
               commercial, and remaining (as 
               of the evaluation date) based 
               on the development project(s) 
               applied. Reserves are further 
               categorised in accordance with 
               the level of certainty associated 
               with the estimates and may be 
               sub-classified based on project 
               maturity and/or characterised 
               by development and production 
               status 
             --------------------------------------- 
 "TD"         total depth 
             --------------------------------------- 
 

Forward-looking information

Certain statements contained in this press release may constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or are not statements of historical fact should be viewed as forward-looking information. In particular, statements regarding the volumes of estimated reserves to be produced from the wells drilled in first phase of the Company's 2021 drilling campaign should be regarded as forward-looking information.

The forward-looking information contained in this document is based on certain assumptions, and although management considers these assumptions to be reasonable based on information currently available to them, undue reliance should not be placed on the forward-looking information because SDX can give no assurances that they may prove to be correct. This includes, but is not limited to, assumptions related to, among other things, commodity prices and interest and foreign exchange rates; planned synergies, capital efficiencies and cost - savings; applicable tax laws; future production rates; receipt of necessary permits; the sufficiency of budgeted capital expenditures in carrying out planned activities, and the availability and cost of labour and services.

All timing given in this announcement, unless stated otherwise, is indicative, and while the Company endeavours to provide accurate timing to the market, it cautions that, due to the nature of its operations and reliance on third parties, this is subject to change, often at little or no notice. If there is a delay or change to any of the timings indicated in this announcement, the Company shall update the market without delay.

Forward-looking information is subject to certain risks and uncertainties (both general and specific) that could cause actual events or outcomes to differ materially from those anticipated or implied by such forward - looking statements. Such risks and other factors include, but are not limited to, political, social, and other risks inherent in daily operations for the Company, risks associated with the industries in which the Company operates, such as: operational risks; delays or changes in plans with respect to growth projects or capital expenditures; costs and expenses; health, safety and environmental risks; commodity price, interest rate and exchange rate fluctuations; environmental risks; competition; permitting risks; the ability to access sufficient capital from internal and external sources; and changes in legislation, including but not limited to tax laws and environmental regulations. Readers are cautioned that the foregoing list of risk factors is not exhaustive and are advised to refer to the Principal Risks & Uncertainties section of SDX's Annual Report for the year ended 31 December 2020, which can be found on SDX's SEDAR profile at www.sedar.com , for a description of additional risks and uncertainties associated with SDX's business.

The forward-looking information contained in this press release is as of the date hereof and SDX does not undertake any obligation to update publicly or to revise any of the included forward -- looking information, except as required by applicable law. The forward -- looking information contained herein is expressly qualified by this cautionary statement.

Oil and Gas Advisory

Certain disclosures in this news release constitute "anticipated results" for the purposes of National Instrument 51-101 - Standards of Disclosure for Oil and Gas Activities ("NI 51-101") of the Canadian Securities Administrators because the disclosure in question may, in the opinion of a reasonable person, indicate the potential value or quantities of resources in respect of the Company's resources or a portion of its resources. Without limitation, the anticipated results disclosed in this news release include estimates of volume, flow rate, production rates, porosity, and pay thickness attributable to the resources of the Company. Such estimates have been prepared by Company management and have not been prepared or reviewed by an independent qualified reserves evaluator or auditor. Anticipated results are subject to certain risks and uncertainties, including those described above and various geological, technical, operational, engineering, commercial, and technical risks. In addition, the geotechnical analysis and engineering to be conducted in respect of such resources is not complete. Such risks and uncertainties may cause the anticipated results disclosed herein to be inaccurate. Actual results may vary, perhaps materially.

Use of the term "boe" or the term "MMscf" may be misleading, particularly if used in isolation. A "boe" conversion ratio of 6 Mcf: 1 bbl and a "Mcf" conversion ratio of 1 bbl: 6 Mcf are based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent a value equivalency at the wellhead.

Reserves and Resources Data

The reserves and resources estimates disclosed or referenced herein have been prepared by Dr. Rob Cook, a qualified reserves evaluator, in accordance with the SPE's Canadian Oil and Gas Evaluation Handbook and in accordance with NI 51-101. The prospective resources disclosed herein have an effective date of 1 January 2021. Prospective resources are those quantities of gas, estimated as of the given date, to be potentially recoverable from undiscovered accumulations through future development projects. As prospective resources, there is no certainty that any portion of the resources will be discovered. The chance that an exploration project will result in a discovery is referred to as the "chance of discovery" as defined by the management of the Company.

There is no certainty that it will be commercially viable to produce any portion of the resources discussed herein; though any discovery that is commercially viable would be tied back to the Company's pipeline in Morocco and then connected to customers' facilities within 9 to 12 months of discovery. Based upon the economic analysis undertaken on any discovery, management has attributed an associated chance of development of 100%.

There are uncertainties associated with the volume estimates of the prospective resources disclosed herein, due to the level of information available on prospective resources, but ranges are defined based on data from the Company's nearby existing analogous wells. Some of the risks and uncertainties are outlined below:

   --      Petrophysical parameters of the sand/reservoir; 
   --      Fluid composition, especially heavy end hydrocarbons; 
   --      Accurate estimation of reservoir conditions (pressure and temperature); 
   --      Reservoir drive mechanism; 
   --      Potential well deliverability; and 

-- The thickness and lateral extent of the reservoir section, currently based on 3D seismic data.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLFLFEDRVIDFIL

(END) Dow Jones Newswires

June 28, 2021 02:00 ET (06:00 GMT)

1 Year Sdx Energy Chart

1 Year Sdx Energy Chart

1 Month Sdx Energy Chart

1 Month Sdx Energy Chart

Your Recent History

Delayed Upgrade Clock