ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

PUR Pure Gold Mining Inc.

0.60
0.00 (0.00%)
26 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Pure Gold Mining Inc. LSE:PUR London Ordinary Share CA74624E1007 COM SHS NPV (DI)
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.60 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

Pure Gold Mining Inc. Pure Gold Files Amended Technical Report (7148E)

08/07/2019 7:00am

UK Regulatory


Pure Gold Mining (LSE:PUR)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Pure Gold Mining Charts.

TIDMPUR

RNS Number : 7148E

Pure Gold Mining Inc.

08 July 2019

NEWS RELEASE 19-16 July 8, 2019

PURE GOLD FILES AMENDED TECHNICAL REPORT

VANCOUVER, B.C. - Pure Gold Mining Inc. (TSX.V: PGM; LSE: PUR) (the "Company" or "Pure Gold") reports that it has filed an amended technical report titled "Madsen Gold Project Technical Report Feasibility Study For The Madsen Deposit Red Lake, Ontario, Canada " effective February 5, 2019 and dated July 5, 2019 ("Amended Technical Report"), prepared by independent Qualified Persons led by JDS Energy & Mining Inc. ("JDS").

The Amended Technical Report has been prepared to correct deficiencies, identified by the British Columbia Securities Commission ("BCSC"), in the March 21, 2019 technical report. These deficiencies have been addressed and corrected in the Amended Technical Report and a copy will be filed on SEDAR at www.sedar.com and posted on the Company's website www.puregoldmining.ca.

The Amended Technical Report has been prepared in accordance with the disclosure and reporting requirements set forth in the Canadian Securities Administrators' National Instrument 43-101 ("NI 43-101"), Companion Policy 43-101CP, and Form 43-101F1, as well as with the Canadian Institute of Mining, Metallurgy and Petroleum's "CIM Definition Standards For Mineral Resources and Reserves, Definitions and Guidelines" ("CIM Standards") adopted by the CIM Council on May 10, 2014.

The Amended Technical Report reflects a change to remove all references to a preliminary economic assessment for the Company's Fork, Russet South and Wedge Deposits. This change does not impact the results of the Company's feasibility study, probable reserves or mineral resources on its Madsen Gold Project.

The Qualified Persons who prepared the Technical Report are:

 
  Michael Makarenko,      JDS Energy & Mining Inc.          Mineral Reserve Estimate, 
   P.Eng.                                                    Mining Methods 
  Michael Levy, P.E.,     JDS Energy & Mining Inc.          Underground Geotechnical 
   P.Eng. 
                        --------------------------------  ------------------------------- 
  Kelly McLeod, P.        JDS Energy & Mining Inc.          Metallurgy, Recovery Methods 
   Eng. 
                        --------------------------------  ------------------------------- 
  Richard Boehnke,        JDS Energy & Mining Inc.          Infrastructure 
   P.Eng. 
                        --------------------------------  ------------------------------- 
  Marc Jutras, P.Eng.     Ginto Consulting Inc.             Mineral Resource 
                        --------------------------------  ------------------------------- 
  Daniel Ruane, P.Eng.    Knight Piesold Ltd                TMF, Waste Rock Management 
                        --------------------------------  ------------------------------- 
  Dave Stone, P.Eng.      Minefill Services Ltd             Mine Backfill 
                        --------------------------------  ------------------------------- 
  Darcy Baker, P.         Equity Exploration Consultants    Geology and Data Verification 
   Geo.                    Ltd. 
                        --------------------------------  ------------------------------- 
 

ABOUT PURE GOLD

Our mandate is pure and simple. To dream big. To colour outside the lines. To use smart science and creativity to unlock the Madsen Gold Project in Red Lake, Ontario. And become Canada's next iconic gold company.

Additional information about the Company and its activities may be found on the Company's website at www.puregoldmining.ca and under the Company's profile at www.sedar.com.

ON BEHALF OF THE BOARD

"Darin Labrenz"

Darin Labrenz, President & CEO

Investor inquiries:

Tel: 604-646-8000

info@puregoldmining.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

MSCRRMLTMBTMBJL

(END) Dow Jones Newswires

July 08, 2019 02:00 ET (06:00 GMT)

1 Year Pure Gold Mining Chart

1 Year Pure Gold Mining Chart

1 Month Pure Gold Mining Chart

1 Month Pure Gold Mining Chart

Your Recent History

Delayed Upgrade Clock