ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

LKOH Pjsc Lukoil

56.2184
0.00 (0.00%)
10 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Pjsc Lukoil LSE:LKOH London Ordinary Share RU0009024277 ORD RUB0.025
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 56.2184 0.00 01:00:00
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
0 0 N/A 0

PJSC LukOil LUKOIL Commissions 5th Well at Filanovsky Stage 2

12/10/2018 10:00am

RNS Non-Regulatory


TIDMLKOD

PJSC LukOil

12 October 2018

LUKOIL COMMISSIONS FIFTH WELL AT FILANOVSKY FIELD SECOND STAGE

LUKOIL commissioned the fifth well at the second development stage of the Vladimir Filanovsky field in the Caspian Sea.

The length of the main wellbore of the new bilateral production well is 2,956 meters, while the lateral's is 1,735 meters. The well's initial flow rate exceeded 3,300 tonnes of oil per day. As a result of the drilling program at the second development stage, the field's oil production is sustained at its plateau level of 6 million tonnes per year starting the second quarter of 2018.

The field's cumulative oil production has exceeded 10 million tonnes.

The Company plans to start drilling the sixth production well shortly. In total the construction of six production and two injection wells is planned at the field's second development stage.

The Company also progresses with the third development stage of the field. The substructure of a wellhead platform was installed offshore at the field in August; the platform's topside is currently being assembled with over 70% completion rate. The topside installation at the sea and the wellhead platform commissioning are planned in 2019.

For reference:

The Vladimir Filanovsky field was commissioned in 2016. Its initial recoverable reserves are estimated at 129 million metric tonnes of oil and 30 billion cubic meters of gas.

All offshore facilities were constructed at Russian shipyards.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

NRAMTBPTMBABMTP

(END) Dow Jones Newswires

October 12, 2018 05:00 ET (09:00 GMT)

1 Year Pjsc Lukoil Chart

1 Year Pjsc Lukoil Chart

1 Month Pjsc Lukoil Chart

1 Month Pjsc Lukoil Chart

Your Recent History

Delayed Upgrade Clock