ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

KAT Katoro Gold Plc

0.08
-0.0025 (-3.03%)
08 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Katoro Gold Plc LSE:KAT London Ordinary Share GB00BSNBL022 ORD GBP0.001
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  -0.0025 -3.03% 0.08 0.075 0.085 0.0825 0.08 0.0825 17,605,620 10:49:03
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Crude Petroleum & Natural Gs 0 -1.05M -0.0016 -0.50 535.6k

Katoro Gold PLC Imweru Project Update (2645Z)

14/12/2017 7:00am

UK Regulatory


Katoro Gold (LSE:KAT)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Katoro Gold Charts.

TIDMKAT

RNS Number : 2645Z

Katoro Gold PLC

14 December 2017

Katoro Gold plc (Incorporated in England and Wales)

(Registration Number: 9306219)

Share code on AIM: KAT

ISIN: GB00BSNBL022

("Katoro" or "the Company")

Dated: 14 December 2017

Katoro Gold Plc ('Katoro' or the 'Company')

First Portion of Imweru Project's LiDAR survey complete

Katoro Gold Plc (AIM:KAT), the Tanzania focused gold exploration and development company, is pleased to announce that it has completed the Light Detection and Ranging ('LiDAR') survey at its Imweru gold project ('Imweru') in Tanzania and currently awaiting the final survey report.

As announced on 24 November 2017, the Company commissioned a LiDAR survey over the entire envisaged Imweru mining area to further strengthen the Pre-Feasibility Study ('PFS'), which remains on track to complete in the near term. Upon receipt of the final survey report the digital data will be processed to produce highly accurate reports to support the final resource estimation and optimised mine design.

Louis Coetzee, Executive Chairman of Katoro commented: "We are fast-tracking the work programme at Imweru and delighted with the speed at which it is progressing. As we move into 2018, we anticipate a steady flow of news as we hit key trigger points including the completion of the PFS, drilling programme, a feasibility study and the application for a Mining Licence as well as the final phase of the Environmental and Social Impact Assessment."

**ENDS**

For further information please visit www.katorogold.com or contact:

 
 Louis Coetzee      +27 (0) 83    Katoro Gold       Executive Chairman 
                     2606126       plc 
 Jon Belliss        +44 (0) 207   Beaufort          Broker 
                     382 8300      Securities 
                                   Limited 
 Richard Tulloch/   +44 (0) 20 
  Ritchie Balmer/    7409 3494      Strand Hanson     Nominated Adviser 
  Frederick                         Limited 
  Twist 
 Isabel de          +44 (0) 207   St Brides         Investor and 
  Salis / Priit      236 1177      Partners          Media Relations 
  Piip                             Ltd               Adviser 
 

Notes to editors:

In May 2017 Katoro was admitted to trading on AIM. Katoro owns 100% of the Imweru and Lubando Gold Projects in Tanzania, which both have Mineral Resources established in accordance with the JORC (2012) Code. The total Mineral Resources stated for Imweru consist of 11.607 Mt at grade of 1.38 g/t for a Mineral Resource of 515,110 oz Au at a resource pay limit of 0.4 g/t for the open pittable material and 1.3 g/t for the underground material, while the Lubando Mineral Resources equate to 6.78 Mt at grade of 1.10 g/t for 239,870 oz Au at a pay limit of 0.4 g/t to a depth of 200 m and 1.3 g/t below the 200 m depth cut-off. The respective projects also include the earlier stage Sheba (within the Imweru Licence Portfolio and Imweru Option Portfolio), Pamba and Busolwa (both within the Lubando Licence Portfolio and Lubando Option Portfolio) projects. The JORC Code compliant Competent Person's Report for each of Imweru and Lubando are available on Katoro's website www.katorogold.com.

The Company's primary focus is on advancing and developing Imweru through a work programme which will include, inter alia, a feasibility study and a drilling programme, with the aim, subject to funding, to commence production with an initial target of 50,000 oz gold per annum within 18-24 months from admission to AIM.

Updates on the Katoro's activities will be announced as required and posted on its website www.katorogold.com.

This information is provided by RNS

The company news service from the London Stock Exchange

END

UPDBSBDDLDBBGRX

(END) Dow Jones Newswires

December 14, 2017 02:00 ET (07:00 GMT)

1 Year Katoro Gold Chart

1 Year Katoro Gold Chart

1 Month Katoro Gold Chart

1 Month Katoro Gold Chart

Your Recent History

Delayed Upgrade Clock