ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

CAD Cadogan Energy Solutions Plc

2.25
0.00 (0.00%)
Last Updated: 08:00:14
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Cadogan Energy Solutions Plc LSE:CAD London Ordinary Share GB00B12WC938 ORD 3P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 2.25 2.00 2.50 2.25 2.25 2.25 0.00 08:00:14
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Drilling Oil And Gas Wells 8.47M -1.56M -0.0064 -3.52 5.49M

Cadogan Petroleum Plc - Well Update

30/04/2019 9:36am

PR Newswire (US)


Cadogan Energy Solutions (LSE:CAD)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Cadogan Energy Solutions Charts.
Press Release                                           30 April 2019

This  announcement is deemed to contain  Inside Information as defined under the Market Abuse Regulations  n. 596/2014

Cadogan Petroleum Plc
(“Cadogan” or the “Company”)

Blazh-10 well Update

Cadogan Petroleum plc (“Cadogan”), an independent, diversified oil & gas company listed on the main market of the London Stock Exchange, is pleased to announce that the performance of its Blazh-10 well has continued to improve during clean-up and that production has increased to circa 385 bpd (25th April: 150 bpd) of oil in natural flow.  

The clean-up is expected to continue for about a week, until the site is vacated by the drilling contractor, with the oil being piped to the production tanks. The clean-up will be followed by an exhaustive well test program designed to collect down hole samples of the oil, to record the flow profile within the perforated section of the well-bore and to establish the productivity index. The company expects to have a better sense of a sustainable rate of production from the well upon completing the clean-up and the following well test.

The Blazh-10 well encountered 156 meters of the target Yamna formation sandstone, with log interpretations confirming the entire column as oil bearing. The well was drilled to a total depth of 3,394m and set a local benchmark for drilling time. The well is located on the Monastyretska license, in the West of Ukraine, near the border with Poland.

Further updates will be provided as and when appropriate.

Guido Michelotti, Cadogan Petroleum CEO, commented:

We are excited by the results of Blazh-10. The well produces more in natural flow than the other three existing wells on the license combined, despite the other wells having sucker rod pumps installed. The contribution of the Blazh-10 well has taken Cadogan’s current production to some 600 bpd of oil, the highest level ever in the history of the Company"

-ENDS-

For further information, please contact:

Cadogan Petroleum plc
Guido Michelotti Chief Executive Officer +380 (44) 594 5870
Ben Harber Company Secretary +44 0207 264 4366
Cantor Fitzgerald Europe Broker to Cadogan Petroleum plc
David Porter +44 (0) 20 7894 7000
Nick Tulloch

Copyright l 30 PR Newswire

1 Year Cadogan Energy Solutions Chart

1 Year Cadogan Energy Solutions Chart

1 Month Cadogan Energy Solutions Chart

1 Month Cadogan Energy Solutions Chart

Your Recent History

Delayed Upgrade Clock