ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

KDNC Cadence Minerals Plc

3.60
0.00 (0.00%)
07 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Cadence Minerals Plc LSE:KDNC London Ordinary Share GB00BJP0B151 ORD 1P
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 3.60 3.40 3.70 0.00 07:44:20
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Phono Recrds,audio Tape,disk 0 -5.5M -0.0304 -1.18 6.51M

Cadence Minerals PLC Bacanora Sonora and Lithium Market Update (6191Y)

10/09/2020 9:04am

UK Regulatory


Cadence Minerals (LSE:KDNC)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Cadence Minerals Charts.

TIDMKDNC

RNS Number : 6191Y

Cadence Minerals PLC

10 September 2020

Cadence Minerals Plc

("Cadence Minerals", "Cadence" or "the Company")

Bacanora Lithium (BCN) - Sonora Lithium Project, Lithium Market & Covid-19 Update.

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the update published today by Bacanora Lithium (AIM:BCN) ("Bacanora"), both on the Lithium market, and on its activities at the Sonora Lithium Project in Mexico ('Sonora' or the 'Project') in light of the ongoing Covid-19 pandemic.

Cadence Minerals - Holdings in Mexalit and Megalit:

Bacanora is a lithium exploration and development company. Cadence holds 30% of Mexalit and Megalit joint venture companies. Mexalit is the owner of the El Sauz, El Sauz 1, El Sauz 2, Fleur and Fleur 1 mineral concessions, which form part of the 20-year mine plan of the Sonora Lithium Project in Northern Mexico.

Sonora Operations

The Pilot Plant has completed the bulk sampling required for the Sonora plant and engineering designs. These samples have been sent to the Company's relevant partners in the USA and China for optimisation of the final designs.

Engineering

All engineering work is now being undertaken off-site. GR Engineering ("GRES") has completed its concentrator design work and will integrate this into the overall project scope. Importantly, the Company's joint venture partner, Ganfeng Lithium ("Ganfeng"), has also completed its flow sheet design testwork for the production of battery grade lithium from the samples provided by the Pilot Plant; Ganfeng is now integrating these results into a larger scale design, and remains on schedule to deliver its final engineering packages at the end of Q4 2020. Lastly, Ganfeng is working with its equipment suppliers to determine equipment delivery times and process guarantees.

Bacanora therefore remains on schedule to commence initial site works at Sonora in H1 2021, subject to completion of financing, which would enable commencement of production at the plant in 2023. This timeframe coincides well with the anticipated increase in lithium demand from European, Asian and US electric vehicle manufacturers expected that year*.

Covid-19 and the Mining Industry in Sonora

The number of new Covid-19 cases continues to fall in the Sonora district of Mexico and lockdown restrictions are slowly being lifted. The Company continues to monitor the situation closely, with the health and safety of its employees and communities remaining its top priority.

New health and safety protocols and social distancing will remain in place at the Pilot Plant for the foreseeable future but will not impact the Company's ability to continue to work on site. Most of the larger scale mining operations within the Sonora district, are now back in production and Bacanora will have employees back in the field in October to survey site access roads in preparation for site access works in Q2 2021.

Recently, the federal government implemented austerity measures as a result of COVID-19, one of which is the restructuring of several undersecretary positions in various sectors, including that for mining. The functions, staff, and responsibilities of the areas that reported to the undersecretary for mining remain intact, and will continue to function as normal, under the responsibility of the Secretariat of the Economy. President Andrés Manuel López Obrador ("AMLO") and the Secretariat of the Economy have consistently supported investment in the mining sector and specifically projects with downstream applications, such as Bacanora's Sonora Lithium Project. This government wide austerity measure does not represent a change in those policies.

Lithium Market

Recent forecasts from Chile, the world's largest producer of downstream battery grade lithium products, indicate that, as electric vehicles sales in Europe and China continue to rebound post the Covid-19 downturn, the electric car industry is forecast to dominate demand for lithium over the next ten years. By 2030, EV demand will account for more than 75% of consumption, up from 30% in 2019. As a result, demand for lithium for electric vehicles would surge to 1.4 million tonnes by 2030**, almost a five-fold increase from the current 300,000 tonnes of demand in 2019***.

* https://www.iea.org/reports/global-ev-outlook-2020

** https://uk.reuters.com/article/chile-lithium/electric-cars-to-account-for-79-of-lithium-demand-by-2030-chile-idUKL1N2FS22Q

*** http://coinnews.tv/lithium-outlook-2019-a-transition-year-ahead/

The full Bacanora release can be found at: https://www.londonstockexchange.com/news-article/BCN/sonora-operational-update/14680960

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014.

- Ends -

 
For further information: Cadence Minerals plc         +44 (0) 7879 584153 
  Andrew Suckling 
  Kiran Morzaria 
 
  WH Ireland Limited (NOMAD 
   & Broker)                   +44 (0) 207 220 1666 
  James Joyce 
  James Sinclair-Ford 
 
  Novum Securities Limited 
   (Joint Broker)              +44 (0) 207 399 9400 
  Jon Belliss 
 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identi ed by their use of terms and phrases such as "believe" "could" "should" "envisage" "estimate" "intend" "may" "plan" "will" or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements re ect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

MSCURRWRRUUKARR

(END) Dow Jones Newswires

September 10, 2020 04:04 ET (08:04 GMT)

1 Year Cadence Minerals Chart

1 Year Cadence Minerals Chart

1 Month Cadence Minerals Chart

1 Month Cadence Minerals Chart

Your Recent History

Delayed Upgrade Clock