ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

ATM Andrada Mining Limited

5.05
0.00 (0.00%)
Last Updated: 08:00:26
Delayed by 15 minutes
Share Name Share Symbol Market Type Share ISIN Share Description
Andrada Mining Limited LSE:ATM London Ordinary Share GG00BD95V148 ORD NPV
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 5.05 4.90 5.20 5.05 5.05 5.05 0.00 08:00:26
Industry Sector Turnover Profit EPS - Basic PE Ratio Market Cap
Ferroalloy Ores, Ex Vanadium 9.88M -8.1M -0.0051 -9.90 79.82M

AfriTin Mining Ltd Operational Update (1378V)

05/08/2020 7:00am

UK Regulatory


Andrada Mining (LSE:ATM)
Historical Stock Chart


From Apr 2019 to Apr 2024

Click Here for more Andrada Mining Charts.

TIDMATM

RNS Number : 1378V

AfriTin Mining Ltd

05 August 2020

5 August 2020

AfriTin Mining Limited

("AfriTin" or the "Company")

Operational Update

AfriTin Mining Limited (AIM: ATM), an African tin mining company with its flagship asset, the Uis Tin Mine ("Uis") in Namibia, is pleased to provide an operational update.

Highlights:

-- Monthly production of tin concentrate for July 2020 increased to 35 tonnes, representing a month-on-month increase of 79%;

   --    Sixth shipment of tin concentrate dispatched on 3 August 2020; 
   --    Tin concentrate assays averaged 65% contained tin, resulting in 93% payability; 
   --    Debottlenecking of fines dewatering circuit nearing completion; and 

-- Offtake agreement with Thailand Smelting and Refining Corporation ("Thaisarco") renewed for a further 12 months.

Monthly production of tin concentrate from the Company's Phase 1 mining and processing facility at Uis increased to 35 tonnes for the month of July 2020. Tin concentrate production for the year to date totals 112 tonnes. The monthly production performance for 2020 is tabulated below. For Stage I of Phase 1, the Company is targeting the processing of 45,000 tonnes of ore processed per month, at a rate of 80 tonnes per hour, for the production of 60 tonnes of tin concentrate per month.

Table 1 : Monthly performance from the Uis Phase 1 pilot plant during 2020.

 
                                                               2020 
                                     Jan      Feb      Mar      Apr     May      Jun      Jul 
 Description           Units                                     * 
                                   -------  -------  -------  ------  -------  -------  ------- 
 Plant Availability    %             59%      60%      64%      59%     65%      69%      73% 
                      -----------  -------  -------  -------  ------  -------  -------  ------- 
 Plant Utilisation     %             58%      66%      68%      54%     70%      76%      88% 
                      -----------  -------  -------  -------  ------  -------  -------  ------- 
 Plant Processing      tonnes 
  Rate                  per hour      45       51       52      41       48       49       65 
                      -----------  -------  -------  -------  ------  -------  -------  ------- 
 Ore Processed         tonnes       11,420   14,043   16,866   9,618   16,217   18,551   31,324 
                      -----------  -------  -------  -------  ------  -------  -------  ------- 
 Tin Concentrate       tonnes        11.4     11.0     12.3    11.1     11.2     19.7     35.3 
                      -----------  -------  -------  -------  ------  -------  -------  ------- 
 Tin Contained 
  in Concentrate       tonnes        7.4      7.1      8.4      7.7     7.2      12.6     22.7 
                      -----------  -------  -------  -------  ------  -------  -------  ------- 
 

* Operations curtailed due to COVID-19 government lockdown regulations

AfriTin has dispatched its sixth shipment of tin concentrate from Uis. The tin in concentrate grade has averaged 65%, representing a premium product largely free from deleterious elements. The Company is achieving an average payability of 93%, referring to the percentage of the LME tin price realised for the tin contained in concentrate.

The offtake agreement with Thaisarco has been renewed for a further 12 months and the Company is looking forward to building on this robust relationship.

Initiatives to address bottlenecks in the processing plant circuits and expand production remain ongoing and on schedule. As a result of higher than anticipated fine material in the run-of-mine feed, improvements were required to rebalance material flows. During Q2 2020 improvement efforts have been focussed on the fines discard dewatering circuit, in particular the dewatering of grits (45 to 500 micron particles) and slimes (smaller than 45 micron particles). These modifications to the fines dewatering circuit are nearing completion and are expected to result in improved concentrator plant throughput.

The Company is continuing to operate the Uis Tin Mine at full scale despite ongoing COVID-19 measures in Namibia and South Africa. T he health, safety and well-being of our employees, contractors and the local community are of utmost importance to the Company. All necessary steps to mitigate a possible outbreak have been taken, and the Company is pleased to report that there continue to be no confirmed cases of COVID-19 at the Uis Tin Mine.

Change of Broker

As announced in the announcement dated 3 August 2020, the Company has appointed Turner Pope Investments as joint broker. At the same time, WH Ireland Limited has ceased to act as broker to the Company.

Anthony Viljoen, CEO of AfriTin Mining Limited commented:

"Despite operational challenges related to COVID-19 and the production ramp-up during the first half of 2020, the performance of our Uis operation is displaying improvement, which, together with the rebound in the tin price and the successful completion of our recent capital raising, provide a strong platform for the rest of 2020.

"We are delighted to have continued our relationship with offtaker, Thaisarco, and believe that this demonstrates confidence in our Company. Building on the results of our improvement initiatives, we expect to further expand production at Uis, while simultaneously advancing our project studies towards the full implementation of Phase 1."

For further information, please visit www.afritinmining.com or contact:

 
 AfriTin Mining Limited 
 Anthony Viljoen, CEO                  +27 (11) 268 6555 
 Nominated Adviser 
 WH Ireland Limited 
  Katy Mitchell 
  James Sinclair-Ford                  +44 (0) 207 220 1666 
 Corporate Advisor and Joint Broker 
 Hannam & Partners 
  Andrew Chubb 
  Jay Ashfield 
  Nilesh Patel                         +44 (0) 20 7907 8500 
 Joint Broker 
 Turner Pope Investments 
  Andy Thacker                         +44 (0) 203 657 0050 
 Financial PR (United Kingdom) 
 Tavistock                             +44 (0) 207 920 3150 
 Jos Simson 
  Barney Hayward 
 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

About AfriTin Mining Limited

Notes to Editors

AfriTin Mining Limited is the first pure tin company listed in London and its vision is to create a portfolio of globally significant, conflict-free, tin-producing assets. The Company's flagship asset is the Uis Tin Mine in Namibia, formerly the world's largest hard-rock opencast tin mine.

AfriTin is managed by an experienced board of directors and management team with a current two-fold strategy: fast-track Uis Tin Mine in Namibia to commercial production as Phase 1, ramping up to 5,000 tonnes of concentrate in a Phase 2 expansion. The Company strives to capitalise on the solid supply/demand fundamentals of tin by developing a critical mass of tin resource inventory, achieving production in the near term and further scaling production by consolidating tin assets in Africa.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

END

UPDZZGGRNDDGGZM

(END) Dow Jones Newswires

August 05, 2020 02:00 ET (06:00 GMT)

1 Year Andrada Mining Chart

1 Year Andrada Mining Chart

1 Month Andrada Mining Chart

1 Month Andrada Mining Chart

Your Recent History

Delayed Upgrade Clock