We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Name | Symbol | Market | Type |
---|---|---|---|
SSE PLC (PK) | USOTC:SSEZY | OTCMarkets | Depository Receipt |
Price Change | % Change | Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.21 | -0.98% | 21.17 | 20.69 | 21.43 | 21.29 | 20.97 | 21.08 | 155,183 | 22:00:01 |
By Dominic Chopping
Aker Solutions ASA said Thursday that as part of a consortium with Siemens Energy AG and Doosan Babcock, it has been awarded the front-end engineering and design contract for SSE Thermal and Equinor ASA's proposed Keadby 3 Carbon Capture Power Station in the U.K.
Over the next 12 months, the consortium will deliver the engineering design for the proposed natural gas power plant--with a generating capacity of up to 910 megwatts--that is to be equipped with a carbon-capture plant to remove CO2 from its emissions.
Aker Carbon Capture ASA will be the consortium's carbon-capture provider.
Keadby 3, located in North Lincolnshire, will have the ability to capture up to 1.5 million metric tons of carbon annually once it is operational, which represents around 5% of the government's 2030 target.
Aker Solutions said it will book the contract as order intake in the second quarter of 2022.
Financial terms weren't disclosed.
Write to Dominic Chopping at dominic.chopping@wsj.com
(END) Dow Jones Newswires
June 16, 2022 03:18 ET (07:18 GMT)
Copyright (c) 2022 Dow Jones & Company, Inc.
1 Year SSE (PK) Chart |
1 Month SSE (PK) Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions