We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
North Bay Resources Inc (PK) | USOTC:NBRI | OTCMarkets | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.001 | 0.001 | 0.001 | 0.00 | 00:00:00 |
North Bay Resources Announces Mt. Vernon Gold Mine Bulk Sample,
Sierra County, California
Bishop, CA -- September 11, 2024 -- InvestorsHub NewsWire -- North Bay Resources Inc. (the "Company" or "North Bay") (OTC: NBRI) is pleased to announce the Operating Plan for the Company's Mt. Vernon Gold Mine is now complete and ready for filing and approval, as required, with Federal Mine Regulators (MSHA) for the commencement of production. Detailed 3D modelling (see Diagrams 1-3), ore extraction, surface operations, as well as safety and logistical planning are largely complete. Modern mine infrastructure, including mining equipment and certain consumables are currently on-site. The first phase of mining will be to blast, load, sort and ship 500 tons from the heart of the deposit. This zone has shown consistent gold grades over 1 ounce and up to 4.8 ounces per ton over 150 feet. This material will be used for optimization of the mining, milling, and metallurgy, and for production of gold bars and platinum buttons for final sale. Previous concentration and extraction testing of gold, platinum and silver by gravity separation has indicated the ore is highly amicable to a simple crush and gravity table recovery (see Press Release dated August 22, 2024) and is well suited to the Company's 100 ton per day Bishop Gold Mill, located in Inyo County.
Diagram 1. High grade Gold Sampling Locations
Diagram 2. Oblique View of High-Grade Gold Shell
Diagram 3. Plan View of Global Channel
Mt. Vernon Mine
The Mt. Vernon Mine is a largely undeveloped deposit. Sampling, by qualified mining engineers, have assayed greater than 1 ounce per ton, and up to 4.8 ounces per ton, continuously reported over 150 feet. The modern access tunnel runs across the known 200-foot-wide gold bearing zone and perpendicular to the channel itself. The channel is up to 500 feet wide and extends over 2000 feet in length throughout the property. The channel varies in thickness from 4 feet to up to 20 feet. Typically, the lower 4 feet contains the higher gold grades. The channel is the same channel previously mined at the contiguous Ruby Mine which is known to be the richest mine in North America. Mt. Vernon is a permitted underground mine with modern portal, tunnel, ventilation. power, and equipment. The ore body is estimated at 954,000 tons based on the known channel (B. Hanford, 2023).
On behalf of the Board of Directors of
NORTH BAY RESOURCES INC.
Jared Lazerson
CEO
X: @NorthBayRes
Facebook: North Bay Resources Inc | Facebook
LinkedIn: North Bay Resources Inc | LinkedIn
This news release may contain certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws.
1 Year North Bay Resources (PK) Chart |
1 Month North Bay Resources (PK) Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions