ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

ZIM

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
TSXV:ZIM TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Zinco Announces Signing of Drill Contract With Major Drilling for Continuation of Exploration Work on Its San Juan and Jesus Mar

10/05/2011 10:32pm

Marketwired


Zinco Mining Corporation (TSXV:ZIM)
Historical Stock Chart


From Jul 2019 to Jul 2024

Click Here for more Zinco Mining Corporation Charts.

Zinco Mining Corporation (TSX VENTURE: ZIM) (FRANKFURT: 61Z) is pleased to announce that it has signed a 1500 meter drill contract with Major Drilling de Mexico S.A. de C.V. to commence diamond core drilling on its mineral prospects in the Cuale volcanogenic massive sulfide (VMS) camp. The main objective of the program is to expand on significant reverse circulation drilling intercepts from two prospects, San Juan and Jesus Maria. From San Juan, Zinco's previous intercepts include:


I.   ZIM9 with 85.7 meters of 185 g/t Ag, 1.5% Zn and 0.8% Pb,
II.  ZIM3, collared 41 m east-northeast of ZIM9, with 108.1 meters of 58 g/t
     Ag, 1.4% Zn and 0.7% Pb.
III. ZIM1, collared 135 m north-northeast of ZIM9, with 14.3 meters of 127
     g/t Ag, 2.9% Zn and 0.9% Pb.
IV.  ZIM5, collared 215 m north-northeast of ZIM9, with 25.5 meters of 72
     g/t Ag, 0.4% Zn and 0.2% Pb.

From Jesus Maria, the 2008 campaign returned results of:


I.   ZIM30 with 41.82 meters of 5% Zn, 1.4% Pb, 0.2% Cu and 14 g/t Ag,
II.  ZIM19, collared 170 meters southwest of ZIM30, with 17.34 meters of
     4.2% Zn, 1.6% Pb, 0.1% Cu and 5 g/t Ag,
III. ZIM16, collared 40 meters southwest of ZIM30, with 17.34 meters of 4.9%
     Zn, 0.1% Pb, 0.2% Cu and 5 g/t Ag.

Plan maps and cross-sections of these results are on Zinco's website at http://www.zincomining.com/s/Mineralization.asp.

The two areas of interest are characterized by multiple intersections of VMS-style mineralization and have grades of economic interest, with zinc and silver dominating the polymetallic assemblage. Diamond drilling is being initiated at both sites to test for physical continuity of the mineralization identified by the earlier reverse circulation drilling program. The company has been active in camp preparation and drill pad preparation in anticipation of diamond drilling commencing in the near future.

Qualified Person

This press release was reviewed by Michelle Robinson, M.A.Sc., P.Eng., a Director of Zinco Mining Corporation, who acts as Zinco's qualified person as defined by NI 43-101. Details regarding sampling and assaying are appended to Zinco's News Release dated 21 February 2011.

Further information about the Jalisco VMS Project can be reviewed on Zinco's website www.zincomining.com.

ON BEHALF OF THE BOARD,

David Elgee, PRESIDENT

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.

Contacts: Zinco Mining Corporation David Elgee President (604) 507-2181 (604) 507-2187 (FAX) www.zincomining.com

1 Year Zinco Mining Corporation Chart

1 Year Zinco Mining Corporation Chart

1 Month Zinco Mining Corporation Chart

1 Month Zinco Mining Corporation Chart

Your Recent History

Delayed Upgrade Clock