ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

ZIM

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
TSXV:ZIM TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Zinco Announces Completion of Drill Contract with Major Drilling on its San Juan and Jesus Maria Prospects in the Cuale Distr...

22/08/2011 10:45pm

Marketwired


Zinco Mining Corporation (TSXV:ZIM)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Zinco Mining Corporation Charts.

Zinco Mining Corporation (TSX VENTURE: ZIM) (FRANKFURT: 61Z) has completed 1534.8 meters of HQ diamond drilling in 14 holes at its San Juan and Jesus Maria prospects in the Cuale VMS camp, Jalisco, Mexico. The drilling was completed by Major Drilling de Mexico S.A. de C.V. between 5 June 2011 and 20 July 2011. The main objective of the program was to expand Zinco's geological knowledge of significant reverse circulation drilling intercepts from both prospects. Specific results that were followed up with additional drilling include: (i) silver-rich hole ZIM9 from San Juan with 85.7 meters of 185 g/t Ag, 1.5% Zn and 0.8% Pb (followed up with an additional 955.3 meters in Holes ZIM 34 to ZIM42), and (ii) zinc-rich hole ZIM30 from Jesus Maria with 41.82 meters of 5% Zn, 1.4% Pb, 0.2% Cu and 14 g/t Ag (followed up with an additional 579.5 metres of drilling in holes ZIM43 to ZIM47).

Prior to sampling, diamond drill core was logged for geology and structure, examined with a microscope, photographed using an electronic camera, then analysed semiquantitatively using a Niton GOLDD XRF analyser to delimit the mineralized intercepts. Prior to the onset of the rains, some core samples from San Juan were scanned with a short-wave infrared (SWIR) spectrometer. Once the rains started, humidity levels were too high to properly dry the core for SWIR spectroscopy.

Core was split in half using a gas powered core saw or conventional core-splitter. Sample intervals were generally 1 metre long, except where modified for geological reasons. One half of the split core was kept in the box on site as a reference, and the other half was sealed in a double-bagged plastic bag for assay. Standard pulps and coarse blank samples were inserted into the sample stream at regular intervals.

The samples were packed into rice bags, then shipped to Acme Laboratories de Mexico in Guadalajara via Transportes Castores for sample preparation. In the lab, the samples were dried, crushed and pulverized. The prepared pulps were shipped via DHL from the lab in Mexico to Acme's analytical laboratory in Vancouver, British Columbia, Canada. Gold determinations are to be completed using fire-assay ICP-ES methods on a 30 gram charge. Silver and base metals are to be analyzed using combined ICP-MS - ICP-ES methods on a 0.5 gram charge with a 4 acid digestion. Silver over limits for this method are to be re-analyzed using gravimetric methods.

The assaying is in-progress.

Qualified Person

This press release was reviewed by Michelle Robinson, M.A.Sc., P.Eng., a Director of Zinco Mining Corporation, who acts as Zinco's qualified person as defined by NI 43-101.

Further information about the Jalisco VMS Project can be reviewed on Zinco's website www.zincomining.com

ON BEHALF OF THE BOARD,

David Elgee, PRESIDENT

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS NEWS RELEASE.

Contacts: Zinco Mining Corporation David Elgee President (604) 507-2181 (604) 507-2187 (FAX) www.Zincomining.com

1 Year Zinco Mining Corporation Chart

1 Year Zinco Mining Corporation Chart

1 Month Zinco Mining Corporation Chart

1 Month Zinco Mining Corporation Chart