ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

TMI Trivalence Mining (Tier1)

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Trivalence Mining (Tier1) TSXV:TMI TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Nortec Announces 14m @ 1.02% Nickel from TL (Tasisuak Lake) Property, Labrador

07/10/2008 7:33pm

Marketwired Canada


Nortec Ventures Corp. (TSX VENTURE:NVT), ("Nortec" or the "Company"), is pleased
to announce that the recent summer drill program at Tasisuak Lake in Labrador
has encountered significant Nickel (Ni), Copper (Cu), Cobalt (Co) mineralization
highlighted as follows:


- 14 metres of 1.02% Ni, 0.51% Cu, 0.03% Co (Hole 08-AA-60)

- 9 metres of 1.02% Ni, 0.55% Cu, 0.04% Co (Hole 08-LP-55)

- 3 metres of 1.04% Ni, 0.38 Cu, 0.03% Co (Hole 08-LP-56)

- 3 metres of 1.01% Ni, 0.39% Cu, 0.04% Co (Hole 08-AA-62)

The drill program consisted of 1960 metres of diamond coring over 18 holes. The
program was designed to test a variety of surface showings and VTEM geophysical
anomalies.


The Property consists of 219 contiguous claims, contained in four Exploration
Licenses, covering 5,475 hectares. In March 2003 Nortec optioned the TL Property
from Vulcan Minerals Inc. ("Vulcan") of Saint John's, Newfoundland. Nortec can
earn up to a 51% interest in the TL Property by incurring exploration
expenditures of $1.5 million by March 17, 2009.




2008 Drill Locations

----------------------------------------------------------------------------
----------------------------------------------------------------------------
                     Easting  Northing                                Total 
                          (m)       (m) Elevation   Azimuth      Dip  Depth
Hole_ID  Prospect  NAD27_z20 NAD27_z20         (m) (degrees)(degrees)    (m)
----------------------------------------------------------------------------
----------------------------------------------------------------------------
08-LP-55 Long Pond    512372   6270033        484       105      -50  137.2
----------------------------------------------------------------------------
08-LP-56 Long Pond    512372   6270033        484       130      -80 107.84
----------------------------------------------------------------------------
08-LP-57 Long Pond    512413   6270013        476       320      -80  156.6
----------------------------------------------------------------------------
08-AA-58 All About-it 512310   6270400        508       108      -50  39.63
----------------------------------------------------------------------------
08-AA-59 All About-it 512310   6270400        508       108      -80  28.05
----------------------------------------------------------------------------
08-AA-60 All About-it 512266   6270635        534       140      -50  118.9
----------------------------------------------------------------------------
08-AA-61 All About-it 512266   6270635        534       140      -80  86.57
----------------------------------------------------------------------------
08-AA-62 All About-it 512283   6270628        533       320      -45  64.02
----------------------------------------------------------------------------
08-BZ-63 B-Zone       512550   6271400        500        80      -85 287.15
----------------------------------------------------------------------------
08-NB-64 No Baccy     512233   6270947        542        75      -45   79.9
----------------------------------------------------------------------------
08-NB-65 No Baccy     512250   6270952        544       255      -60  51.21
----------------------------------------------------------------------------
08-NB-66 No Baccy     512251   6270920        540        80      -45  100.5
----------------------------------------------------------------------------
08-BZ-67 B-Zone       512752   6270667        502       270      -60 140.24
----------------------------------------------------------------------------
08-BZ-68 B-Zone       512883   6269979        493       270      -75 115.85
----------------------------------------------------------------------------
08-BZ-69 B-Zone       512921   6269998        491       260      -45  82.32
----------------------------------------------------------------------------
08-FZ-70 F-Zone       513355   6268989        496       270      -60 109.76
----------------------------------------------------------------------------
08-AZ-71 A-Zone       513639   6269988        515       270      -60  118.9
----------------------------------------------------------------------------
08-BZ-72 B-Zone       512497   6271773        470       350      -80 136.28
----------------------------------------------------------------------------



Generally, the holes testing geological targets along the C-zone (holes 56-66,
except 63) proved to contain the best mineralization with disseminated to
semi-massive sulphide textures, as follows:




2008 Drill Results

----------------------------------------------------------------------------
----------------------------------------------------------------------------
                                                                   Platinum,
                                                                  Palladium+
           From     To    Interval    Nickel    Copper    Cobalt       Gold
Hole_ID      (m)    (m)         (m)        %         %         %        g/t 
----------------------------------------------------------------------------
----------------------------------------------------------------------------
08-LP-55      7     21          14      0.80      0.85      0.03       0.36
----------------------------------------------------------------------------
Incl.        10     19           9      1.02      0.55      0.04       0.40
----------------------------------------------------------------------------
incl.         7     13           6      1.02      1.59      0.05       0.30
----------------------------------------------------------------------------
WITH          7      8           1      0.55      4.02      0.03       0.30
----------------------------------------------------------------------------
08-LP-56      8     25          17      0.41      0.15      0.02       0.16
----------------------------------------------------------------------------
incl.         8     14           6      0.69      0.24      0.02       0.21
----------------------------------------------------------------------------
incl.         9     12           3      1.04      0.38      0.03       0.28
----------------------------------------------------------------------------
08-LP-57    NSI
----------------------------------------------------------------------------
08-AA-58      8     13           5      0.11      0.05      0.07       0.05
----------------------------------------------------------------------------
08-AA-59    NSI    
----------------------------------------------------------------------------
08-AA-60      3     42          39      0.57      0.28      0.02       0.25
----------------------------------------------------------------------------
incl.         6     20          14      1.02      0.51      0.03       0.35
----------------------------------------------------------------------------
WITH         13     14           1      2.15      0.38      0.05       0.36
----------------------------------------------------------------------------
08-AA-61      2     31          29      0.42      0.21      0.02       0.15
----------------------------------------------------------------------------
incl.         5      6           1      1.62      0.66      0.05       0.35
----------------------------------------------------------------------------
incl.         8     10           2      1.23      0.34      0.04       0.41
----------------------------------------------------------------------------
08-AA-62    5.5   41.5          36      0.42      0.19      0.02       0.19
----------------------------------------------------------------------------
incl.       7.5   10.5           3      1.01      0.39      0.04       0.63
----------------------------------------------------------------------------
incl.      11.5   13.5           2      1.09      0.25      0.06       0.53
----------------------------------------------------------------------------
08-NB-64   5.50   11.5           6      0.75      0.22      0.02       0.32
----------------------------------------------------------------------------
incl.      5.50    7.5           2      1.47      0.28      0.03       0.46
----------------------------------------------------------------------------
08-NB-65   7.70    8.7           1      1.21      1.04      0.03       0.03
----------------------------------------------------------------------------
08-NB-66  15.25  16.25           1      0.29      0.07      0.01       0.08
----------------------------------------------------------------------------



Drill holes 63, 67-72 tested a series of VTEM Anomalies in the B, F and A zones
and did not encounter any significant nickel-copper mineralization. However,
three of the holes did encounter a massive pyrrhotite zone up to 3 meters in
thickness with gold enrichment of 1 gram/tonne over 2 metres in hole 68. As
well, some zones of anomalous platinum (Pt) and palladium (Pd) were encountered.
Hole 63 encountered the thickest gabbroic body over 69.4 metres though no
significant mineralization was encountered.


All core samples were cut in half in the field by diamond saw, packaged and
sealed in the field and shipped to Accurassay Laboratories receiving facility in
Gambo South, NL where they were prepared and forwarded to the main lab in
Thunder Bay, ON. One half of the core samples are preserved for further
analysis. Samples were tested for 30 elements (including base metals) with an
ICP (Inductively Coupled Plasma) process. Samples exceeding detection limits
were processed for ore grade analysis with an AA (Atomic Absorption) process.
All samples were also analyzed for Au, Pt and Pd with a fire assay process.
QA/QC was maintained by the laboratory by running duplicates and repeats, and
also with blind duplicates inserted into the sample stream directly from the
field.


The Tasisuak Lake property is situated approximately 50 kilometres northwest of
the world class Voisey Bay nickel-copper-cobalt mine. The property covers
significant outcrops of Tasiuyak gneisses hosting mafic intrusions which contain
the nickel-copper mineralization. The genesis and style of mineralization
remains unexplained in the context of the regional setting and timing of
emplacement. The Company plans to carry out geochemical and petrographic
analysis of the mineralization and host rocks to answer these questions and
assist in further exploration of the property.


The property contains many untested geophysical anomalies and surface showings.
The C-zone mineralization remains open in a north-south direction in excess of 5
kilometers based on its geophysical signature. The Company is encouraged by
these drill results and notes that they are some of the highest grade over width
nickel-copper intersections drilled in Labrador outside of Voisey's Bay.


Kingurutik Property

As part of the recently signed agreement between Nortec and Vulcan, Nortec
commissioned Geotech Ltd. ("Geotech") to carry out a 417 line-km
helicopter-borne geophysical survey for Nortec over the Kingurutik River
Property, 70km north of the Tasisuak Lake property. The airborne geophysics
consisted of a versatile time domain electromagnetic ("VTEM") survey and total
magnetic intensity ("TMI") using a cesium magnetometer.


There are 5 main anomalies identified from the geophysical survey. Three of
these anomalies are located in the north central part of the claim and have E-W
trending conductors with coincident magnetic highs possibly related to metallic
mineralization in the form of mixed magnetite and pyrrhotite dominated
sulphides.


As part of a first pass exploration drill program, 3 holes were drilled for a
total of 321metres. The holes targeted the potential near-surface mineralization
and coincident geophysical anomaly on Prospect A.




Drillhole Collar co-ordinates on the Kingurutik River Property

----------------------------------------------------------------------------
                     Easting  Northing                                Total 
                          (m)       (m) Elevation   Azimuth      Dip  Depth
Hole_ID  Prospect  NAD27_z20 NAD27_z20         (m) (degrees)(degrees)    (m)
----------------------------------------------------------------------------
08-KG-01        A     504162   6317813        555       270       45    121
----------------------------------------------------------------------------
08-KG-02        A     504010   6318762        480       320       45    100
----------------------------------------------------------------------------
08-KG-03        A     504300   6318912        391       320       45    100
----------------------------------------------------------------------------



All core samples were cut in half by diamond saw, packaged and sealed in the
field before being shipped to Accurassay Laboratories receiving facility in
Gambo South, NL where they were prepared and forwarded to the main lab in
Thunder Bay, ON. Samples were tested for 30 elements (including base metals)
with an ICP (Inductively Coupled Plasma) process. Samples exceeding detection
limits were processed for ore grade analysis with an AA (Atomic Absorption)
process. All samples were also analyzed for Au, Pt and Pd with a fire assay
process. QA/QC was maintained by the laboratory by running duplicates and
repeats, and also with blind duplicates inserted into the sample stream directly
from the field. No significant nickel-copper mineralization was encountered.
Geological and geophysical interpretation of the Kingurutik River Property is
ongoing with the aim of delineating future drill targets.


To view a map of the Tasisuak Lake project, click the following link:
http://media3.marketwire.com/docs/nvtmap.jpg.


Further information on the TL and Kingurutik River Properties is available on
Nortec's website at www.nortecventures.com. Mohan R. Vulimiri, M.Sc, P.Geo.,
President, CEO and Director of Nortec; and, Ian Laurent MEconGeol MAIG RPGeo,
Vice President - Exploration for Nortec, are the persons responsible for
initiating and guiding the work programs on the TL and Kingurutik Project. Mohan
Vulimiri is the Qualified Person responsible for the contents of this press
release.


On behalf of the Board of Directors,

NORTEC VENTURES CORP.

Mohan R. Vulimiri, President & CEO

The statements made in this Press Release may contain certain forward-looking
statements. Actual events or results may differ from the Company's expectations.
Certain risk factors may also affect the actual results achieved by the Company.


This press release does not constitute an offer to sell, or a solicitation of an
offer to sell, any of the foregoing securities in the United States. None of the
foregoing securities have been and, nor will they be, registered under the
United States Securities Act of 1933, as amended (the "U.S. Securities Act") or
any state securities laws and may not be offered or sold within the United
States or to U.S. Persons unless registered under the U.S. Securities Act and
applicable state securities laws or an exemption from such registration is
available.


There can be no assurance that forward-looking information will prove to be
accurate. Should one or more of these risks and uncertainties materialize, or
should underlying assumptions prove incorrect, actual results may vary
materially from any conclusions, forecasts or projections described in the
forward-looking information. Accordingly, readers are advised not to place undue
reliance on forward-looking information. Except as required under applicable
securities legislation, the Company undertakes no obligation to publicly update
or revise forward-looking information, whether as a result of new information,
future events or otherwise.


1 Year Trivalence Mining (Tier1) Chart

1 Year Trivalence Mining (Tier1) Chart

1 Month Trivalence Mining (Tier1) Chart

1 Month Trivalence Mining (Tier1) Chart

Your Recent History

Delayed Upgrade Clock