![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Silk Road Energy Inc | TSXV:SLK | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.05 | 0.015 | 0.05 | 0 | 01:00:00 |
Selkirk Metals Corp. ("Selkirk" or the "Company") (TSX VENTURE:SLK) is pleased to report the second set of assay results from the ongoing diamond drilling program from underground at the Ruddock Creek Property, located 100 km north-northwest of Revelstoke in the Kamloops and Revelstoke Mining Divisions, British Columbia. All of the drill holes reported to date have successfully intersected the target E-Zone massive sulphides. The best intersection in drill holes EUG 08-7 to EUG 08-11 reported here is 12.71% Zinc and 2.87% Lead over a width of 4.63 meters. The character of the E-Zone continues to consist of a stratigraphic section up to 30 to 40 meters thick including intervals of high grade massive sulphide up to 15 meters thick intermixed with pegmatite and calc silicates. The attitudes of the mineralized intervals are variable so the true thickness will be calculated as more drill intersections pierce the entire mineralized section. The following table summarizes the results received from drill holes 8 to 11 from the underground diamond drilling program: --------------------------------------------------------------- FROM TO INTERVAL ZINC LEAD HOLE NUMBER (m) (m) (m) % % --------------------------------------------------------------- EUG-08-07 129.57 134.20 4.63 12.71 2.87 and 139.4 142.02 2.62 6.77 2.31 --------------------------------------------------------------- --------------------------------------------------------------- EUG-08-08 34.04 40.13 6.09 3.80 0.69 including 35.39 38.53 3.14 4.53 0.95 --------------------------------------------------------------- --------------------------------------------------------------- EUG-08-9 61.44 71.15 9.71 4.65 1.66 including 66.33 69.83 3.50 10.69 1.93 --------------------------------------------------------------- --------------------------------------------------------------- EUG-08-10 47.30 51.93 4.63 3.50 0.40 and 70.79 73.96 3.17 4.81 2.08 and 83.00 84.82 1.82 5.14 0.42 and 107.00 108.06 1.06 11.37 2.87 --------------------------------------------------------------- --------------------------------------------------------------- EUG-08-11 90.64 94.18 3.54 7.59 1.61 --------------------------------------------------------------- All reported drill holes were completed from drill stations in the vicinity of or along the 900 meter incline, which was developed to a length of 170 meters east of the main decline and includes four drill stations. In addition to the definition drilling from the incline to the east, drilling has also been completed down dip to the west of the decline with results pending. "We are pleased that the drilling to date continues to confirm the down dip extension of the E-Zone mineralization both in character and grade," stated Gordon Keevil, President. The underground diamond drilling program is continuing with the focus on completing the drill holes necessary to finalize the resource calculation of the E-Zone from surface to the point where it has been intersected by the decline, a length of approximately 1.2 kilometers. Operations on the Ruddock Creek Property are being conducted under the supervision of the Company's Qualified Person (as defined by NI 43-101), Jim Miller-Tait, P.Geo., Vice President of Exploration. Acme Analytical Laboratories Ltd. was engaged to carry out the analytical work on all samples. The analytical procedure utilized was the Group 7AR 23 multi-element assay by ICP-AES methods. On Behalf of the Board of Directors: Gordon Keevil, President This release includes certain statements that may be deemed to be "forward-looking statements" within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration and development activities and events or developments that the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see our public filings at www.sedar.com for further information.
1 Year Silk Road Energy Chart |
1 Month Silk Road Energy Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions