![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Southern Arc Minerals Inc | TSXV:SA | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0.89 | 0.32 | 0.90 | 0 | 01:00:00 |
MCG001 2.30m @ 3.96 g/t Au from 257.50m including 0.80m @ 7.60 g/t Au from 259.00m MCG002 2.00m @ 5.15 g/t Au from 118.70m including 0.20m @ 9.80 g/t Au from 118.70m
Based on surface mapping, the Waterfall target comprises a 1,200 metre long zone of mineralized epithermal breccias and veins, with two main parallel structures (15m average width) that are interpreted to coalesce at depth based on structural data (Figure 2).
Dr. Mike Andrews, Southern Arc's President and Chief Operating Officer, commented: "The first drill holes at the Mencanggah prospect have returned encouraging intercepts and confirm gold mineralization at depth, albeit in splays peripheral to the main target zones. Further drilling at Waterfall is a high priority and we look forward to reporting results as the drill program advances."
Holes MCG001 and MCG002 were halted in August following local unrest. Southern Arc has increased security at site and expects to resume drilling at Mencanggah by month end to test gold-bearing epithermal breccias with a program of approximately 30 holes to an average depth of 300 metres to complete a total of 10,000 metres by year end (Figure 1). Follow-up drilling with the objective of completing a National Instrument 43-101 compliant resource estimate for Mencanggah will continue through the first half of 2012.
Pelangan Drill Results
Southern Arc has also received assays for holes PDL028 to PDL033 drilled at the Pelangan Prospect.
PLD028 (Central Raja) 1.35m @ 1.0 g/t Au and 6.2 g/t Ag from 251.05m PLD031 (South Raja) 3.90m @ 3.9 g/t Au from 154.70m including 0.85m @ 11.5 g/t Au from 156.40m PLD032 (South Raja) 13.15m @ 1.4 g/t Au from 87.20m including 3.30m @ 2.3 g/t Au from 97.05m PLD033 (Tanjung) 0.65m @ 1.04 g/t Au from 114.95m
Drill holes PLD029 and PLD030 at North Raja did not intersect any significant mineralization.
Southern Arc has drilled more than 7,000 metres at Pelangan as part of its Phase 2 exploration program. Drilling will resume at Pelangan in late Q4-2011 with approximately 13,000 metres with the objective of completing a National Instrument 43-101 compliant resource estimate for the Pelangan Prospect in the first half of 2012.
On behalf of the Board of Directors
John Proust, Chairman and CEO
About Southern Arc
Southern Arc Minerals Inc. is an Indonesia-based Canadian mineral exploration company with an aggressive exploration, acquisition and growth strategy. The Company's portfolio includes four exploration projects with epithermal gold and gold-copper porphyry prospects on the Lombok and Sumbawa islands in Indonesia, three of which are being advanced in partnership with major mining companies Vale and Newcrest. The Company's key exploration property is its West Lombok project, with several gold-rich copper porphyry and epithermal gold vein prospects. Southern Arc is listed on the TSX Venture Exchange under the symbol SA. More information is available at www.southernarcminerals.com or by emailing info@southernarcminerals.com.
Qualified Person and Quality Control and Assurance
The information in this release has been compiled under the supervision of Southern Arc's Chief Geologist, Andrew Rowe B. App. Sc. Geology, MAusIMM. Mr. Rowe has over 18 years of international mineral exploration experience throughout Southeast and Central Asia and Australia. During this time he has held such positions as Chief Geologist - Feasibility Studies, Senior Geologist and Consulting Geologist. Mr. Rowe has sufficient experience relevant to the style of mineralization under consideration and qualifies as a Qualified Person as defined by National Instrument 43-101.
The drill program and sampling protocol is managed by Southern Arc under the supervision of Andrew Rowe. The diamond drill holes are drilled at PQ, HQ and NQ sizes depending on hole depth and core recovery to date has averaged 98.0%. Half core is cut by rock saw and is generally sampled using nominal 1-metre intervals; however, sample intervals are varied according to geological contacts and have ranged between 0.2 to 2.5 metres in length. Three quality control samples (one blank and two standards) are inserted into each batch of 40 samples. The half core samples are securely transported from the project site to the Intertek Testing Services ("ITS") sample preparation laboratory in Sumbawa Besar via private truck hired by Southern Arc. Sample pulps are then sent to the ITS Jakarta laboratory by ITS. Gold is analysed by fire assay with AAS finish and a four-acid digestion with ICP-MS finish is used to analyse a full suite of elements including silver and base metals. ITS is one of the world's largest product and commodity testing, inspection and certification organizations. The Jakarta laboratory is ISO 17025 accredited and employs a Laboratory Information Management System for sample tracking, quality control and reporting.
Forward-looking Statements
This news release contains forward-looking statements relating to expected or anticipated future events and operations, timing of projects and anticipated results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, the regulatory process and actions, technical issues, new legislation, competitive and general economic factors and conditions, the uncertainties resulting from potential delays or changes in plans, the occurrence of unexpected events, and the company's capability to execute and implement future plans. Actual results achieved may vary from the information provided herein as a result of numerous known and unknown risks and uncertainties and other factors. There is no representation by the company that actual results achieved during the forecast period will be the same in whole or in part as that forecast.
To view the figures accompanying this release please click on the following link: http://media3.marketwire.com/docs/0921sa.pdf
Table 1 - Mencanggah Prospect, Phase 1 Drilling, Diamond Drill Hole Statistics
---------------------------------------------------------------------------- AZI- SIGNIF- COORD- EL. MUTH ICANT INATE (m (N... INCL FINAL INTER- HOLE UTM above degrees (approx. DEPTH INTER- SECTIONS ID E N MSL) E) degrees) (m) VAL (Au g/t) ---------------------------------------------------------------------------- MCG 388177.0 9022741.0 277 210 -50 288.30 257.50- 2.30m @ 001 259.80m 3.96g/t Au (i) ---------------------------------------------------------------------------- MCG 388026.6 9022819.6 309 210 -55 138.30 118.70- 2.00m @ 002 120.70m 5.15g/t Au (i) ---------------------------------------------------------------------------- (i) Silver results pending. Table 2 - Pelangan Prospect, Phase 2 Drilling, Diamond Drill Hole Statistics ---------------------------------------------------------------------------- AZI- SIGNIF- COORD- EL. MUTH ICANT INATE (m (N... INCL FINAL INTER- HOLE UTM above degrees (approx. DEPTH INTER- SECTIONS ID E N MSL) E) degrees) (m) VAL (Au/Ag g/t) ---------------------------------------------------------------------------- PLD 384577.0 9028692.0 144.8 59 -50 150.00 56.55- 4.85m @ 001 61.4m 7.11/18.5 incl. 56.55- 1.35m @ 57.9m 16.7/17.0 ---------------------------------------------------------------------------- PLD 384577.0 9028692.0 144.8 59 -75 221.80 120.15- 17.25m @ 002 137.4m 5.73/11.7 incl. 121.6- 8.75m @ 130.35m 10.51/20.7 ---------------------------------------------------------------------------- PLD 384530.9 9028672.1 120.4 65 -65 300.30 232.95- 16.55m @ 003 249.50m 5.5/3.7 incl. 237.50- 7.70m @ 245.20m 10.9/6.1 incl. 240.70- 4.50m @ 245.20m 17.6/8.0 ---------------------------------------------------------------------------- PLD 384656.2 9028587.2 186.8 70 -50 150.00 79.25- 10.95m @ 004 90.20m 2.00/34.0 incl. 88.70- 1.5m @ 90.20m 5.6/166.0 ---------------------------------------------------------------------------- PLD 384463.8 9028885.9 71.6 100 -50 149.20 72.70- 17.5m @ 005 74.45m 1.15/4.9 and 92.90- 1.95m @ 94.85m 1.16/13.7 ---------------------------------------------------------------------------- PLD 384656.2 9028587.2 186.8 70 -68 149.00 110.05- 16.15m @ 006 126.20m 1.4/12.0 incl. 110.05- 2.45m @ 112.50m 4.7/34.0 ---------------------------------------------------------------------------- PLD 384490.0 9028777.6 77.6 62 -45 158.75 78.80- 39.7m @ 007 118.50m 9.4/15.7 incl. 78.50- 17.40m @ 96.20m 19.4/28.3 incl. 88.10- 6.15m @ 94.25m 37.7/26.0 127.70- 0.75m @ 128.45m 22.1/15.4 ---------------------------------------------------------------------------- PLD 384615.3 9028682.7 161.2 75 -45 156.00 70.35- 11.55m @ 008 81.90m 9.80/31.1 incl. 70.35- 3.5m @ 81.90m 26.1/96.5 93.70- 11.8m @ 105.50m 1.40/9.2 incl. 100.2- 2.00m @ 102.2m 3.70/22.6 ---------------------------------------------------------------------------- PLD 384530.9 9028672.1 120.4 32 -60 295.00 217.30- 8.20m @ 009 225.50m 4.4/2.7 incl. 217.30- 4.30m @ 221.60m 7.5/3.9 ---------------------------------------------------------------------------- PLD 384615.3 9028682.7 161.2 72 -70 195.00 127.35- 22.05m @ 010 149.40m 2.7/2.8 incl. 140.40- 9.0m @ 149.40m 4.6/1.6 incl. 140.80- 1.4m @ 142.20m 11.5/2.3 ---------------------------------------------------------------------------- PLD 384529.0 9028670.0 117.0 65 -60 282.35 210.20- 16.5m @ 011 226.70m 3.2/16.4 incl. 211.50- 4.75m @ 216.25m 8.2/41.9 ---------------------------------------------------------------------------- PLD 384490.0 9028777.6 77.6 55 -70 310.10 108.80- 2.8m @ 012 11.60m 0.5/5.4 188.50- 6.0m @ 194.50m 0.5/2.0 ---------------------------------------------------------------------------- PLD 384631.4 9028649.5 184.3 82 -65 201.00 110.40- 24.5m @ 013 134.90m 1.3/5.9 incl. 117.80- 8.95m @ 126.75m 2.3/11.8 ---------------------------------------------------------------------------- PLD 384711.1 9028441.1 191.7 50 -65 159.00 74.60- 37.2m @ 014 111.80m 2.5/14.2 incl. 90.70- 9.2m @ 99.90m 4.1/24.0 ---------------------------------------------------------------------------- PLD 384591.5 9028646.3 168.1 84.6 -70 341.50 No significant 015 result ---------------------------------------------------------------------------- PLD 384566.9 9028767.9 106.6 63 -70 157.90 91.90- 11.0m @ 016 102.90m 2.17/8.6 incl. 93.50- 2.30m @ 95.80m 4.00/14.5 and 98.50- 0.7m @ 99.20m 4.50 /4.0 ---------------------------------------------------------------------------- PLD 384709.1 9028440.0 191.6 15 -65 195.35 132.40- 6.0m @ 017 138.40m 2.2/13.1 incl. 132.40- 1.30m @ 133.70m 4.9/11 ---------------------------------------------------------------------------- PLD 384388.5 9029050.0 69.9 65 -47 162.90 79.30- 0.70m @ 018 80.00m 2.4/2.7 ---------------------------------------------------------------------------- PLD 384663.3 9028360.5 221.6 70 -46 228.10 147.10- 5.2m @ 019 152.30m 4.1/10.3 incl. 147.70- 0.75m @ 148.45m 14.0/43.7 and 151.75- 0.55m @ 152.30m 14.5/5.2 160.80- 13.95m @ 174.75m 2.7/19.4 incl. 160.80- 2.4m @ 163.20m 7.1/34.8 and 173.75- 1.0m @ 174.75m 4.7/40.9 ---------------------------------------------------------------------------- PLD 384309.8 9028698.1 183.9 215 -50 187.00 66.95- 1.05m @ 020 68.00m 1.3/1.5 78.65- 1.7m @ 80.35m 2.5/0.8 110.05- 0.95m @ 111.00m 1.4/3.3 ---------------------------------------------------------------------------- PLD 384640.2 9028566.2 171.1 65 -70 296.70 No significant 021 result ---------------------------------------------------------------------------- PLD 384783.9 9028193.0 269.9 80 -55 182.20 101.80- 15.8m @ 022 117.60m 3.6/19.7 incl. 111.40- 5.6m @ 117.00m 7.0/12.6 incl. 115.60- 1.4m @ 117.00m 18.2/10.9 ---------------------------------------------------------------------------- PLD 384245.7 9028742.7 183.1 210 -50 164.25 No significant 023 result ---------------------------------------------------------------------------- PLD 384663.3 9028360.5 221.6 65 -67 280.45 223.85- 1.95m @ 024 225.80m 3.3 (i) ---------------------------------------------------------------------------- PLD 384783.1 9028193.0 271.1 44 -65 214.35 145.55- 15m @ 025 160.55m 1.0 (i) 165.30- 10.05m @ 175.35m 1.1 189.80- 1.3m @ 191.10m 4.1 ---------------------------------------------------------------------------- PLD 384374.6 9029164.6 44.2 65 -55 77.60 Abandoned due to 026 water ---------------------------------------------------------------------------- PLD 384120.8 9028807.5 190.2 210 -50 247.25 167.20- 26.2m @ 027 193.40m 4.2 (i) incl. 67.20- 1.3m @ 168.50m 30.1 incl. 189.15- 3.45m @ 192.60m 12.3 ---------------------------------------------------------------------------- PLD 384375.2 9028828.0 121.1 70 -61 334.20 251.05- 1.35m @ 028 252.40m 1.0/6.2 ---------------------------------------------------------------------------- PLD 384313.1 9029257.0 53.3 65 -50 154.15 No significant 029 result ---------------------------------------------------------------------------- PLD 384158.7 9029448.0 32.4 65 -50 154.20 No significant 030 result ---------------------------------------------------------------------------- PLD 384728.4 9028268.0 266.1 70 -50 213.15 154.70- 3.90m @ 031 158.60m 3.9 (i) incl. 156.40- 0.85m @ 157.25m 11.5 ---------------------------------------------------------------------------- PLD 384809.5 9028103.0 267.3 65 -45 191.40 87.20- 13.15m @ 032 100.35m 1.4 (i) incl. 97.05- 3.30m @ 100.35m 2.3 ---------------------------------------------------------------------------- PLD 384003.4 9028878.0 219.0 210 -50 187.95 114.95- 0.65m @ 033 115.6m 1.04 (i) ---------------------------------------------------------------------------- PLD 383794.0 9029010.4 230.1 210 -50 100.00 034 ---------------------------------------------------------------------------- PLD 383897.1 9028942.8 228.1 210 -50 15.20 036 ---------------------------------------------------------------------------- PLD 384809.5 9028103.0 267.3 65 -75 39.45 037 ---------------------------------------------------------------------------- PLD 384728.4 9028268.0 266.1 70 -70 11.75 038 ---------------------------------------------------------------------------- Total Drilled Length 7,014.50 ------------------------------------------------------ (i) Silver results pending.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contacts: Southern Arc Minerals Inc. Rhylin Bailie Vice President, Communications & Investor Relations 604-676-5241 info@southernarcminerals.com www.southernarcminerals.com
1 Year Southern Arc Minerals Chart |
1 Month Southern Arc Minerals Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions