ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

ROR

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
TSXV:ROR TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Run of River Power Provides Skookum Power Project Update

14/03/2014 11:10pm

PR Newswire (Canada)


(TSXV:ROR)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more  Charts.

VANCOUVER, March 14, 2014 /CNW/ - Run of River Power Inc. ("ROR Power" or the "Company") (TSXV: ROR) further to the Company's news release on February 5, 2014, Run of River Power Inc. announces the anticipated total cost over-run has increased from $12.8 M to $14.7M (the "Cost Over-run") on the Skookum Creek Power Project (the "Project"). If the Cost Over-run becomes final the Company is obligated to repay to the Partnership $2.5M. The Company's maximum liability for repayment of the Cost Over-run is capped at $2.7M, a level which would be reached with a further $0.2M in Cost Over-run for a total Cost Over-run of $14.9M. The targeted completion of the Project is set for the end of March 2014.

The Partnership and the Company are investigating ways to defray the Cost Over-run while preserving value to the shareholders. An update will be provided once additional information is available.

About Run of River Power Inc.
ROR Power develops renewable, sustainable energy through its portfolio of clean energy projects. The company helps diversify BC's energy mix by providing a cleaner way to generate power and increasing the security of BC's energy supply. ROR Power operates an Eco Logo© certified hydroelectric power generation station at Brandywine Creek, near Whistler, BC that provides green power for about 4,000 homes.

Forward-Looking Statements
Certain information regarding the Company set forth in this press release, including management's assessment of the Company's future plans and operations contains forward looking statements that involve substantial known and unknown risks and uncertainties. These forward looking statements are subject to numerous risks and uncertainties, some of which are beyond the Company's and management's control, including but not limited to, the impact of general economic conditions, industry conditions, fluctuation of foreign exchange rates, environmental risks, industry competition, availability of qualified personnel and management, stock market volatility, timely and cost effective access to sufficient capital from internal and external sources. The Company's actual results, performance or achievement could differ materially from those expressed in or implied by, these forward looking statements and accordingly, no assurance can be given that any of the events anticipated to occur or transpire from the forward looking statements will provide any benefits to the Company.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Run of River Power Inc.

Copyright 2014 Canada NewsWire

1 Year Chart

1 Year  Chart

1 Month Chart

1 Month  Chart

Your Recent History

Delayed Upgrade Clock