ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

PSR Polar Star Mining Corporation

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Polar Star Mining Corporation TSXV:PSR TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Polar Star Receives SRK Consulting (Chile) NI 43-101 Technical Report on Chepica

08/04/2009 8:25pm

Marketwired Canada


NOT FOR DISTRIBUTION TO UNITED STATES WIRE SERVICES OR DISSEMINATION IN
THE UNITED STATES

Polar Star Mining Corporation ("Polar Star" or the "Company") (TSX VENTURE:PSR)
announced today that it has received a draft of SRK's Independent Technical
Report on the Chepica Project located near the town of Talca in Region VII,
southern Chile.


Highlights of the Report are as follows:

- Total Measured and Indicated Resources of the Chepica Number 1 Vein system 
are 401,000 tonnes grading 2.6 grams/tonne gold, 8.3 grams/tonne silver and
0.48% copper using a cut-off grade of 0.6 grams/tonne gold, uncut.


- The current Chepica plant has been designed to process up to 120 tonnes/day.

A separate metallurgical report was received from the University of La Serena
Metallurgical Laboratory stating that their test work on drill core indicates
the copper and gold recoveries are in the order of 65%. These metallurgical
results have not yet been included in SRK's technical report.


The Chepica process plant is currently milling limited amounts of exploration
and development rock from the Number 2 Vein.


The final SRK report will be posted on SEDAR subsequent to review and approval.

Estimation was based on 50 of 66 drill holes corresponding to 5,299 meters of
diamond core drilling, together with 19 underground channel samples and 2 trench
samples totalling 92.5 meters in length.


The resources were estimated by Ordinary Kriging using block model sizes of 10
by 10 by 10 meters.


Qualified Person

The qualified person within the meaning of National Instrument 43-101 is Mr.
Terence Walker, M.Sc., P.Geo. Mr. Walker has reviewed the contents of this news
release.


About Polar Star Mining Corporation

Polar Star was created to acquire advanced stage exploration properties focusing
on gold, copper, and uranium. The Corporation's material assets include 20
projects in Chile, which are 100% owned and cover approximately 146,112
hectares.


Forward-Looking Statements

This press release may contain forward-looking statements based on assumptions,
uncertainties and management's best estimates of future events. Actual events or
results could differ materially from the Company's expectations and projections.
Investors are cautioned that forward-looking statements involve risks and
uncertainties. Accordingly, readers should not place undue reliance on
forward-looking statements. When used herein, words such as "anticipate",
"will", "intend" and similar expressions are intended to identify
forward-looking statements. For a more detailed discussion of such risks and
other factors that could cause actual results to differ materially from those
expressed or implied by such forward-looking statements, refer to Polar Star
Mining Corporation's filings with Canadian securities regulators available on
www.sedar.com or the Company's website at www.polarstarmining.com.


1 Year Polar Star Chart

1 Year Polar Star Chart

1 Month Polar Star Chart

1 Month Polar Star Chart

Your Recent History

Delayed Upgrade Clock