ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

PRYM Prime Mining Corp

1.78
0.00 (0.00%)
03 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Prime Mining Corp TSXV:PRYM TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 1.78 1.67 1.78 0 01:00:00

Prime Mining Completes Acquisition of Los Reyes Gold-Silver Project

20/07/2020 2:00pm

GlobeNewswire Inc.


Prime Mining (TSXV:PRYM)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Prime Mining Charts.

Prime Mining Corp. (TSX.V: PRYM) (OTCQB: PRMNF) (Frankfurt: A2PRDW) (“Prime” or the “Company”) is pleased to announce that the Company has completed the acquisition of the Los Reyes gold and silver property in Sinaloa, Mexico (“Los Reyes”) with a payment of US$1,500,000 to Vista Gold Inc. (“Vista”), which was made on July 17, 2020 (the “Acquisition Date”).  With this payment, Vista no longer retains two separate 2% net smelter royalties on production from open-pit or underground mining, or a back-in right to assume a 49% non-carried interest in any underground mining at Los Reyes.  Prime is required to pay Vista an additional US$2,100,000 through two payments of: (i) US$1,100,000 no later than six months from the Acquisition Date; and (ii) US$1,000,000 no later than twelve months from the Acquisition Date.  If the Company fails to make the two payments, Vista’s net smelter royalties and back-in right will be reinstated.

Prime filed a deed in Mexico with the Public Registry of Property and Commerce to record the transfer of the thirty-seven Los Reyes mining concessions to Prime’s local subsidiary company.   In several days, the mining concessions will also be registered with the Mines General Directorate’s Mining Public Registry.

Daniel Kunz, Chief Executive Officer Prime Mining Corp commented, “With the completion of the transaction Prime now owns 100% of Los Reyes, an oxide open-pit project that already has a high-quality gold-silver mineral resource with exceptional growth potential.”

Vice President Investor Relations AppointmentPrime is also pleased to announce that Mr. Alex Tsakumis has been appointed as Vice President – Investor Relations.  Mr. Tsakumis has over 25 years of capital markets experience representing mining companies listed on major stock exchanges (including TSX and NYSE).  His responsibilities have included corporate governance, corporate communications and maintaining active engagement and strong relationships with institutional investors. Mr. Tsakumis holds a BA in Economics.

About Prime Mining Corp.Prime’s management team has an ideal mix of successful capital markets and mining executives and experienced local exploration personnel. Prime is actively exploring the historic Los Reyes gold and silver project in Sinaloa, Mexico. Los Reyes has a current measured and indicated in-pit oxide mineral resource for the Property of 19.8 million tonnes containing 633,000 gold ounces at 1.0 gpt and 16,604,000 silver ounces at 26.2 gpt.  Los Reyes holds substantial resource upside based on open extensions of known resources, ten kilometres of undrilled strike length and at least eight additional exploration targets. Prime Mining has a well-planned capital structure with significant management and insider ownership.

For more information please visit www.primeminingcorp.ca and follow us on Twitter, Facebook or LinkedIn.

ON BEHALF OF THE BOARD OF DIRECTORS Daniel KunzChief Executive Officer

For further information, please contact:

Daniel KunzChief Executive Officer and DirectorPrime Mining Corp.1307 S. Colorado Ave.Boise, Idaho 83706Telephone: 1-208-926-6379 officeemail: dan@dkunzassoc.com

Andrew Bowering Executive Vice President and DirectorPrime Mining Corp.1507 – 1030 West Georgia StreetVancouver, BC, V6E 2Y3Telephone: (604) 428-6128Facsimile: (604) 428-6430E: andy@primeminingcorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking InformationInformation set forth in this document may include forward-looking statements. While these statements reflect management's current plans, projections and intents, by their nature, forward-looking statements are subject to numerous risks and uncertainties, some of which are beyond the control of the Company.  Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on these forward-looking statements. There is no assurance the transactions noted above will be completed on the terms as contemplated, or at all.  The Company’s actual results, programs, activities and financial position could differ materially from those expressed in or implied by these forward-looking statements.

1 Year Prime Mining Chart

1 Year Prime Mining Chart

1 Month Prime Mining Chart

1 Month Prime Mining Chart

Your Recent History

Delayed Upgrade Clock