ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

OX

0.00
0.00 (0.00%)
Last Updated: -
Delayed by 15 minutes
Share Name Share Symbol Market Type
TSXV:OX TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Orex: Preliminary Economic Assessment-Positive Report

16/04/2014 2:45pm

Marketwired Canada


OREX EXPLORATION INC. (TSX VENTURE:OX) ("Orex" or "the Corporation") - The board
of Directors have received the Preliminary Economic Assessment ("PEA") on the
Goldboro gold project undertaken by MineTech International Limited ("MineTech")
of Halifax, Nova Scotia. MineTech reviewed the Boston Richardson and the East
and West Goldbrook deposits at Goldboro, Nova Scotia, Canada, which collectively
holds a Measured Resource of 27,900 ounces of gold (149,000 tonnes at 5.8 g/t
gold) and Indicated Resource of 358,700 ounces (1,436,000 tonnes at a grade of
7.8 g/t gold) using a 3 g/t cutoff grade. The deposits also contain Inferred
Resources of 343,400 ounces gold (1,537,000 tonnes at 6.95 g/t gold) as
disclosed in the February, 11th 2013 Mercator NI 43 - 101 report. 


The Preliminary Economic Assessment includes inferred mineral resources that are
considered too speculative geologically to have the economic considerations
applied to them that would enable them to be categorized as mineral reserves,
and there is no certainty that the Preliminary Economic Assessment will be
realized.


The Board of Directors have reviewed the document and have approved the release
of the report, which will be posted on SEDAR shortly.


Highlights from the report:



--  A mechanised underground mine, with cash cost of production forecast at
    US$500 per ounce over the life of the mine. Initial output of 21,000
    ounces of gold per annum (after mill recovery and NSR), is expected to
    rise to over 30,000 ounces per annum (after mill recovery and NSR)
    following the planned expansion in year three. Peak production in years
    seven and eight is forecast at over 40,000 ounces per annum (after mill
    recovery and NSR). 
    
--  An expenditure of US$24.3 million is needed for pre-production and
    first-year capital, including a 20% contingency. An additional US$3.7
    million is needed for working capital. Expansion from 350 tonnes per day
    to 500 tonnes per day is estimated to cost US$8.8 million during years
    two and three including the expansion of the milling capacity. The
    sustaining capital over the life-of-mine is forecast to be US$13.4
    million or approximately US$2.2 million per annum, commencing in year
    four. 
    
--  The mine life is estimated to be eleven years and the table produced
    below illustrates the Net Present Value of the Goldboro project based on
    a range of gold prices and discount rates. The base case used by
    MineTech during modelling was US$1,200 per ounce.   

                                                                            
----------------------------------------------------------------------------
Goldboro Mine                          GOLD PRICE IN US$ PER OUNCE          
Nova Scotia                                                                 
                            ------------------------------------------------
                              $1,200  $1,250  $1,300  $1,350  $1,400  $1,450
----------------------------------------------------------------------------
Discount Rate                       Net Present Value after tax (NPV)       
----------------------------------------------------------------------------
5.0%                           $98 M  $107 M  $116 M  $124 M  $133 M  $142 M
----------------------------------------------------------------------------
7.5%                           $80 M   $88 M   $95 M  $103 M  $110 M  $118 M
----------------------------------------------------------------------------
10.0%                          $66 M   $72 M   $79 M   $85 M   $92 M   $99 M
----------------------------------------------------------------------------
    
--  Underground mining will initially be carried out using a single drill
    jumbo. At this time no surface mining is planned. 
    
--  Metallurgical test work showed that 70% of the gold can be recovered
    using a simple gravity separation process. A flotation concentrate will
    recover another 20 - 23%. It is planned to treat concentrate on site and
    produce dore bars. 
    
--  Mining would commence using the existing portal and developed areas,
    which will mean that only minor development work is required to access
    the first two years of production. 
    
--  An initial estimated workforce of 85 people will be required and that up
    to 120 long term jobs will be created in the area. 
    
--  The Corporation intends to continue to explore at the Goldboro property
    with a view to increasing the size of the deposit at depth and to the
    eastern boundary of the property. It is also planned to carry out infill
    drilling in an effort to convert some of the current inferred and
    indicated resources into measured resources. 
    
--  The property boasts excellent resource expansion potential in all
    directions which could extend the current estimated mine life. 



It is anticipated that an environmental study capable of complying with world
recognised Equator Principles will be undertaken. www.equator-principles.com


Technical information pertaining to the Preliminary Economic Analysis contained
in this news release was reviewed by Patrick Hannon, M.A.Sc., P. Eng., of
MineTech International Limited, who is an independent Qualified Person as
defined under National Instrument 43-101. 


Commenting on this development, Willie McLucas, President and CEO said "When I
first visited the Goldboro property in August 2013, I was excited by the
opportunity and I am very pleased that the results shown in the PEA confirm my
optimism. The recent increase in interest in gold projects in Nova Scotia can
only be of benefit to our cause. Your Board will now actively commence the
search for a debt funding package of this project in order to minimise dilution
to existing shareholders."


Neither the TSX Venture Exchange nor its regulation services provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this news release. The statements
made in this news release that are not historical facts are `forward-looking
statements, and readers are cautioned that any such statements are not
guarantees of future performance and that actual developments or results may
vary materially from those in these "forward-looking" statements.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Willie McLucas, President and CEO
+44 7881 816 980
wpm@mclucasfamilyholdings.com


Mark Billings, Chairman
(514) 296-1641
mark@marengomgt.com

1 Year Orex Exploration Inc. Chart

1 Year Orex Exploration Inc. Chart

1 Month Orex Exploration Inc. Chart

1 Month Orex Exploration Inc. Chart

Your Recent History

Delayed Upgrade Clock