ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

ORS Orestone Mining Corp

0.03
0.00 (0.00%)
03 Jun 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Orestone Mining Corp TSXV:ORS TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.03 0.025 0.03 0 12:30:02

Orestone Prepares Gold Drill Targets on Captain for Field Season

30/04/2013 1:00pm

Marketwired Canada


Orestone Mining Corp. (TSX VENTURE:ORS) in preparation for the upcoming field
season at the Captain project the Company has made application for an additional
20 diamond drill holes and 44.9 kilometers of IP geophysics to increase coverage
over the large outlined magnetic high anomalies. Recent drilling has shown a
direct correlation between magnetic dike swarms and disseminated porphyry gold
mineralization. 


Recent diamond drill hole C12-05, intersected long intervals of 0.30-0.65 g/t
gold and 0.06-0.07% copper over 119-165m, including 9m of 6.5 g/t gold and 0.27%
copper as well as 6m of 4.4 g/t gold and 0.51% copper (News Release Jan 14,
2013). When plotted on the detailed magnetic map, C12-05 and drill hole C11-01
lie on the southern fringe of a large circular magnetic high known as the
Admiral target. The Admiral target measures 1000m x 1500m and is similar in size
and intensity to the magnetic high associated with the "MBX" and "66" ore bodies
at the Mount Milligan Mine located 30 kilometers to the north. This is the
highest priority drill target on the Captain project and will be drilled at the
start of the 2013 summer field season. 


Recent logging of timber in the Admiral target area has created a network of
roads which will permit easy drill rig access. The Company currently has all
permits in place to facilitate the next several phases of exploration; 30 line
kilometers of geophysics and 38 sites approved for drilling by the B.C. Ministry
of Energy and Mines.


The 100% owned Captain Project hosts a large gold-copper porphyry system
measuring 7 by 14 kilometers located 41 kilometers north of Fort St. James,
British Columbia and approximately 30 kilometers south of the Mt. Milligan
gold-copper deposit. The Captain Project features relatively flat terrain,
moderate tree cover and an extensive network of logging and Forest Service roads
suitable for exploration year around. The Company has or is applying for all
permits to facilitate the next several phases of exploration. For additional
information including maps referenced visit www.orestone.ca.


ON BEHALF OF ORESTONE MINING CORP.

David Hottman, President and CEO

This news release has been prepared by management and no regulatory authority
has approved or disapproved the information contained herein.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Orestone Mining Corp.
David Hottman
President & CEO
604-629-1929
info@orestone.ca
www.orestone.ca

1 Year Orestone Mining Chart

1 Year Orestone Mining Chart

1 Month Orestone Mining Chart

1 Month Orestone Mining Chart

Your Recent History

Delayed Upgrade Clock