We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Meadow Bay Gold Corp (delisted) | TSXV:MAY | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0 | - |
To view the map accompanying this release please click on the following link: http://media3.marketwire.com/docs/0414may.jpg
One trench and four core holes were drilled in the Colorback Gold Project prior to its acquisition by the Company. Highlights from the drill program are noted below:
--------------------------------------------------------------------------- Intercept Description Interval Gold (1000ppb = Width Grade 0.0292opt Hole_Id M From M To meters ppb gold) --------------------------------------------------------------------------- CB-01 67.67 71.63 3.96 4,080 3.96m @ 4,080.96 ppb --------------------------------------------------------------------------- CB-01 88.09 90.98 2.89 627 2.89m @ 627.38 ppb --------------------------------------------------------------------------- CB-01 95.86 97.38 1.52 763 1.52m @ 763.00 ppb --------------------------------------------------------------------------- CB-01 101.19 102.41 1.22 2,052 1.22m @ 2,052.00 ppb --------------------------------------------------------------------------- CB-01 106.98 108.51 1.53 787 1.53m @ 787.00 ppb --------------------------------------------------------------------------- CB-01 109.27 113.39 4.12 2,742 4.12m @ 2,742.44 ppb --------------------------------------------------------------------------- CB-01 143.56 144.93 1.37 628 1.37m @ 628.00 ppb --------------------------------------------------------------------------- CB-01 169.32 170.84 1.52 301 1.52m @ 301.00 ppb --------------------------------------------------------------------------- CB-01 172.52 173.74 1.22 397 1.22m @ 397.00 ppb --------------------------------------------------------------------------- CB-02 57 58.83 1.83 664 1.83m @ 664.00 ppb --------------------------------------------------------------------------- CB-02 115.52 117.04 1.52 861 1.52m @ 861.00 ppb --------------------------------------------------------------------------- CB-03 75.9 78.64 2.74 904 2.74m @ 904.34 ppb --------------------------------------------------------------------------- CB-04 54.56 57.61 3.05 3,655 3.05m @ 3,655.58 ppb --------------------------------------------------------------------------- CB-04 160.32 161.85 1.53 882 1.53m @ 882.00 ppb --------------------------------------------------------------------------- CBT-1 9.14 15.24 6.1 594 6.1m @ 594.69 ppb --------------------------------------------------------------------------- CBT-1 25.91 28.96 3.05 681 3.05m @ 681.23 ppb --------------------------------------------------------------------------- CBT-1 48.77 50.29 1.52 1,602 1.52m @ 1,602.00 ppb --------------------------------------------------------------------------- CBT-1 62.48 64.01 1.53 490 1.53m @ 490.00 ppb --------------------------------------------------------------------------- CBT-1 70.1 71.63 1.53 309 1.53m @ 309.00 ppb --------------------------------------------------------------------------- CBT-1 82.3 91.44 9.14 815 9.14m @ 815.85 ppb --------------------------------------------------------------------------- CBT-1 97.54 99.06 1.52 664 1.52m @ 664.00 ppb --------------------------------------------------------------------------- CBT-1 111.25 114.3 3.05 2,483 3.05m @ 2,483.41 ppb ---------------------------------------------------------------------------
Tim Masters, head of the Company's Nevada operations commented, "We are very excited to report these drill results which provide an indication of high grade Gold mineralization. The results will help guide the Company's exploration program and pending Technical Report prepared to NI 43-101 standards."
Below is a cross section of core holes CB-01 and CB-04 showing the dip of mineralization from the surface under trench 01:
To view the map accompanying this release please click on the following link: http://media3.marketwire.com/docs/0414may1.jpg
The next round of drilling will test the shallow and larger larger lower plate target.
The contents of this news release have been reviewed by Tim Masters, a Qualifiied Person under National Instrument 43-101 and officer of the Company's Nevada based subsidiary.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.
Contacts: Meadow Bay Capital Corporation Robert Dinning CEO 613-882-7467 Meadow Bay Capital Corporation Matthew Harrington Investor Relations 613-882-7467
1 Year Meadow Bay Gold Corp (delisted) Chart |
1 Month Meadow Bay Gold Corp (delisted) Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions