ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for alerts Register for real-time alerts, custom portfolio, and market movers

KAS Khalkos Exploration

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Khalkos Exploration TSXV:KAS TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Khalkos Exploration Inc.: 17.1 g/t Au Over 7.8 Metres Intersected by Diamond Drilling on Villebon

09/07/2014 1:00pm

Marketwired Canada


EXPLORATION KHALKOS. ("Khalkos") (TSX VENTURE:KAS) is pleased to announce that
the diamond drill hole VB-14-07 has intersected a section of 7.8 metres with a
gold grade of 17.1 g/t, including 153 g/t Au over 0.8 m. The intersection was
obtained at a vertical depth of 20 metres under Cere's showing that had never
been drilled previously. A second drill hole, the VB-14-08 located behind the
VB-14-07, has also intersected the new zone at vertical depth of 30 metres with
two sections of 17.5 g/t Au over 0.5 m and 1.02 g/t Au over 6.1 m. The shear's
true width is estimated at 75-80%. 


Numerous gold specks were observed in the drill holes that also demonstrate an
expansion in depth of the Cere shear zone. Grab samples collected from this
showing on surface graded up to 72 g/t Au (see press release November 19 2013).
The process of the 15-ton bulk sample collected by Khalkos on the Cere's zone is
still ongoing (see press release February 3 2014). 


Note that only two holes have been drilled to date on Cere's showing. The only
work done prior to those of Khalkos is the digging, in the 1940-1950's, of an
exploration well of about 6 metres deep. 


Until now, Khalkos has drilled a total of 569 m on its Villebon property, all
the drill holes (VB-13-01 to VB-14-08) have intersected gold. The Villebon
project is situated at less than 75 km south-east of the city Val-d'Or and is
served by an excellent road network. 


Under an assurance and analytical control of quality programme, blank and
certified reference materials were added to the drill core samples taken from
the Villebon property. Core samples were processed by the ALS Chemex laboratory
in Val-d'Or, Quebec by fire assay and metallic sieve.


This press release was prepared by Robert Gagnon, President of Khalkos,
Qualified Person pursuant to National Instrument 43-101.


Neither the TSX Venture Exchange nor its Regulation Services Provider (as that
term is defined in the policies of the TSX Venture Exchange) accepts
responsibility for the adequacy or accuracy of this release. 


FOR FURTHER INFORMATION PLEASE CONTACT: 
Robert Gagnon, President
(819) 860-2621
rgagnon@khalkos.com
(514) 510-7964 (FAX)


Christian Guilbaud B.B.A
(514) 813-7862
cguilbaud@videotron.ca
(514) 510-7964 (FAX)
www.khalkos.com

1 Year Khalkos Exploration Inc. Chart

1 Year Khalkos Exploration Inc. Chart

1 Month Khalkos Exploration Inc. Chart

1 Month Khalkos Exploration Inc. Chart

Your Recent History

Delayed Upgrade Clock