We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Karmin Exploration Inc | TSXV:KAR | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 1.01 | 1.01 | 1.03 | 0 | 00:00:00 |
NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES
Karmin Exploration Inc. (“Karmin”) (TSXV and the Lima Stock Exchange: KAR) is pleased to report significant progress at the Aripuanã Zinc Project (“Aripuanã”) located in north-western Brazil. Karmin has a 30% carried interest in Aripuanã until 12 months after the delivery of a feasibility study.
2016 Work Program
The very extensive 2016 work program at Aripuanã continues with the following activities;
Corporate Developments with Aripuanã’s Owners
Compañía Minera Milpo S.A.A. (“Milpo”) (Lima Stock Exchange: MILPOC1) and Votorantim Metais Zinc S.A. (“Votorantim”) jointly own 70% of Aripuanã and are responsible for 100% of expenditures until 12 months after the delivery of a feasibility study. Under the terms of the Contract of Association, the feasibility study must be in a form acceptable to lending organizations for the purpose of raising financing, preferably as project finance on a limited recourse basis.
On April 12, 2016 it was reported that Votorantim Metais–Cajamarquilla S.A. purchased 20.17% of Milpo through the facilities of the Lima Stock Exchange thereby increasing its controlling stake in Milpo to 80.24%.
On November 30, 2016 Milpo is to have a shareholders’ meeting to vote on a motion to delist its shares from the Lima Stock Exchange. If this motion is carried Karmin will be the only public company exposed to the future developments of Aripuanã.
About Karmin
The common shares of Karmin are listed on the TSX Venture Exchange and the Lima Stock Exchange and trade in both markets under the symbol “KAR”. The principal business of Karmin is to acquire, explore and develop resource properties.
Karmin owns 30% of Aripuanã, one of the ten largest undeveloped zinc projects in the world. Aripuanã covers an 820 square kilometre mineralized massive-sulphide district that includes five areas of mineralization (Ambrex, Arex, Babacu, Massaranduba and Mocoto) over a 25-kilometre strike length. Votorantim and Milpo own the remaining 70% of Aripuanã, but are responsible for 100% of the project costs until 12 months after the completion of a feasibility study.
The Summary of Mineral Resources at Aripuanã is outlined in Table 1. This summary is detailed in a Technical Report prepared by RPA Inc. which conforms to NI 43-101 Standards of Disclosure for Mineral Projects and is dated January 29, 2013 (see Karmin press release dated February 21, 2013).
TABLE #1 SUMMARY OF MINERAL RESOURCES – ARIPUANÃSeptember 12, 2012
Grade Contained Metal Tonnage Zn Pb Cu Au Ag Zn Pb Cu Au Ag Mt % % % g/t g/t M lb M lb M lb Oz K Oz AREX Measured 2.4 7.15 2.50 0.51 0.24 73 378 132 27 19,000 5,633 Indicated 2.5 3.50 1.18 1.36 0.64 37 195 65 76 52,000 2,996 Inferred 3.2 3.9 1.4 0.8 0.7 39 278 101 57 73,000 4,001 AMBREX Indicated 14.2 3.39 1.23 0.07 0.18 29 1,062 386 23 82,000 13,389 Inferred 11.5 5.0 1.7 0.1 0.30 40 1,269 436 36 108,000 14,657 AREX + AMBREX Measured + Indicated 19.1 3.87 1.38 0.30 0.25 36 1,635 584 125 153,000 22,018 Inferred 14.7 4.8 1.7 0.3 0.4 39 1,547 536 93 181,000 8,560 Notes: 1. CIM definitions were followed for Mineral Resources. 2. Mineral Resources are reported as within mineralized wireframes modelled at 3% Zn in the stratabound zone and 0.5% Cu in the stringer zone and include internal dilution. 3. The Ambrex resource database does not include results of drilling in 2012. 4. Numbers may not add due to rounding.Karmin owns 100% of the Aripuanã Gold Project, which encompasses the gold and silver mineralization associated with near-surface oxidized portions of numerous massive-sulphide deposits in the 820-square-kilometre Aripuanã Zinc Project in north-western Brazil.
Karmin owns 100% of the 25 square-kilometre Cushuro Gold Project located in the world-class Alto Chicama gold-mining district of northern Peru.
Qualified Person
The Mineral Resources for Aripuanã disclosed in this press release have been prepared by Votorantim and reviewed by Ms. Valerie Wilson, P.Geo, an employee of RPA and independent of Karmin. Ms. Wilson, P.Geo., has read and approved the contents of this press release as it pertains to the disclosed Mineral Resource estimate.
Disclaimer Relating to Forward-Looking Information
This news release contains forward-looking statements that are based on the belief of management and reflect Karmin’s current expectations. Forward-looking statements include, but are not limited to, possible events and statements. The words “potential,” “possible,” “expects,” “plans,” “scheduled,” “estimates,” “anticipates” or “believes,” or variations of such words and phrases or statements that certain actions, events or results “may,” “could,” “would,” “might,” or “will” be taken or occur, and similar expressions identify forward-looking statements. The forward-looking statements and information in this press release include, but are not limited to the mineral resource estimates and the business plans of Karmin. Such statements and information reflect the current view of Karmin with respect to risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information.
Such statements are not historical facts. Readers are cautioned not to place undue reliance on forward-looking statements, as there can be no assurance that the plans, intentions or expectations upon which they are based will occur. By their nature, forward-looking statements involve numerous assumptions, known and unknown risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections in the forward-looking statements will not occur, and that actual performance and results in future periods may differ materially from any estimates or projections of future performance or results expressed or implied by such forward-looking statements.
The Aripuanã Zinc Project and the land it relates to is an exploration property only. Accordingly, there are a number of important factors that could cause Karmin’s actual results to differ materially from those indicated or implied by forward-looking statements and information. Such factors relating to the Aripuanã Zinc Project include, among others, the timing and content of work programs, results of the development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimates, receipt and security of mineral property titles, receipt of licenses to conduct mining activities, project cost overruns or unanticipated costs and expenses, fluctuations in metal prices and general market and industry conditions, changes in national and local government legislation, taxation, controls, policies and regulations, the security of personnel and assets, and political or economic developments in Canada and Brazil, operating or technical difficulties in connection with mining or development activities, employee relations, the speculative nature of mineral exploration and development and the risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding.
The forward-looking statements contained in this news release are made as of the date of this news release. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. Except as required by law, Karmin disclaims any intention and assumes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. Additionally, Karmin undertakes no obligation to comment on the expectations of, or statements made by, third parties in respect of the matters discussed above.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
View source version on businesswire.com: http://www.businesswire.com/news/home/20161116005498/en/
Karmin Exploration Inc.David Brace, 416-367-0369Chief Executive Officerdavidbrace@karmin.comorJohn Iannozzi, 519-337-5302Chief Financial Officerjohni@karmin.com
1 Year Karmin Exploration Chart |
1 Month Karmin Exploration Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions