We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Integra Resources Corp | TSXV:ITR | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
-0.02 | -1.71% | 1.15 | 1.15 | 1.16 | 1.19 | 1.15 | 1.17 | 155,445 | 20:58:35 |
TSXV: ITR; NYSE American: ITRG
www.integraresources.com
VANCOUVER, BC, May 30, 2024 /CNW/ - Integra Resources Corp. ("Integra" or the "Company") (TSXV: ITR) (NYSE American: ITRG) is pleased to provide an overview of the upcoming exploration drill campaign at the Wildcat Deposit ("Wildcat"), which combined with the Mountain View Deposit form the Nevada North Project (the "Project"). Wildcat is located within the Farrell mining district in northwest Nevada, 56 kilometers ("km") (~35 miles) north of the town of Lovelock, in Pershing County. The 17,612-acre land package consists of 916 unpatented claims and 4 patented claims. Mineralization at Wildcat consists of a gold-dominated, low sulphidation, epithermal vein system with disseminated oxide, transition, and non-oxide mineralization hosted in permeable volcanic and intrusive rocks.
The Company intends to complete a ~2,000 meter ("m") Phase 1 exploration drill program at Wildcat, commencing in June 2024. The drill program is designed to test the oxide mineralization adjacent to the existing mineral resource at Wildcat, while also testing the high-grade breccia target which is believed to be the feeder source of gold mineralization at Wildcat. The planned drill program is the first time Integra's team will complete a significant follow up exploration program since the Company acquired the Project as part of the merger with Millennial Precious Metals Corp. ("Millennial") in 2023. The Company believes that Phase 1 drilling has the potential to significantly increase the existing mineral resource at Wildcat by testing high-priority targets that could not be drilled previously due to permit restrictions.
Highlights:
(1) | CAD:USD FX rate of 1.32 |
(2) | Refer to the NI 43-101 technical report titled: "Technical Report Preliminary Economic Assessment for the Wildcat and Mountain View Projects, Pershing and Washoe Counties, Nevada, USA", dated June 28, 2023 with an effective date of July 30, 2023 available under Integra Resources' SEDAR+ profile at www.sedarplus.ca and EDGAR profile at www.sec.gov. |
Jason Kosec, President, CEO and Director of Integra commented: "We are extremely excited to kick off the much-anticipated 2024 drill program at Wildcat. The planned program is the first significant exploration drilling program at Wildcat since the deposit was explored by Millennial in 2022, when five new mineralized targets were discovered outside the 2023 PEA pit. We believe this drill program has the potential to significantly increase the near surface oxide mineral resource which will enhance future economics at Wildcat. Moreover, the discovery of the main feeder zone could be a potential game changer for Wildcat, altering the scope of what we currently know about the potential size of the deposit."
Key Figures
Figure 1: Wildcat 2024 plan view with proposed drilling and locations:
https://integraresources.com/site/assets/files/2572/wc_nr_plan_figure_2024-05-28.pdf
Figure 2: Wildcat schematic long sections with geophysics:
https://integraresources.com/site/assets/files/2572/nr_-_wildcat_geophysics_sls_2024-05-28.pdf
Figure 3: 2022 Millennial drilling highlights:
https://integraresources.com/site/assets/files/2572/wc_nr_cs_rev1_2024-05-28.pdf
Overview of Previous Millennial Exploration at Wildcat
In 2022, Millennial completed both drilling and a detailed mapping and sampling program at Wildcat. The sampling program included detailed surface mapping, a robust rock chip sampling program (~850 samples, ~23% of samples returned grades above 0.1 g/t Au), and detailed compilation of historic data. The mapping program successfully increased the mineralized footprint at Wildcat from ~1.5 km by 1.5 km to ~3.0 km by 2.0 km. Infill and metallurgical drilling which took place at Wildcat in 2022 was highly successful, demonstrating strong grade continuity, minimal overburden coverage, and excellent rock mechanics allowing for favourable pit wall angles and the potential to reduce stripping volumes and lower mining costs. Wildcat demonstrates an extremely low-strip ratio of 0.28 Life-of-Mine ("LoM"), which is presented in the 2023 PEA (Nevada North LoM strip ratio of 1.21). See Figure 3 for a cross section providing an overview of the mineralization at Wildcat.
Highlights from the 2022 drill program include (refer to Millennial news release date November 29, 2022):
Hole No. | From (m) | To (m) | Interval | Au (g/t) |
WCCD-0003 | 0.2 | 39.3 | 39.2 | 1.26 |
including | 1.1 | 21.6 | 20.6 | 1.82 |
WCCD-0004 | 0.3 | 41.8 | 41.4 | 0.93 |
including | 32.6 | 41.8 | 9.2 | 2.51 |
and | 41.8 | 79.9 | 38.1 | 0.74 |
WCCD-0005 | 52.1 | 120.7 | 68.6 | 0.55 |
and | 4.0 | 21.6 | 17.7 | 0.36 |
WCCD-0006 | 0.9 | 121.0 | 120.2 | 0.39 |
including | 0.9 | 15.9 | 15.0 | 0.68 |
WCCD-0012 | 64.9 | 119.8 | 54.9 | 0.41 |
and | 5.5 | 36.0 | 30.5 | 0.34 |
Note: Considering the broad shape of mineralization, all intercepts are estimated to represent 70-100% of true width. |
2024 Exploration Drill Program at Wildcat
The 2024 exploration drill program at Wildcat will test the expanded mineralized footprint at Wildcat identified by Millennial in 2022. The drill program will focus on greenfield exploration targets that have the potential to expand the oxide mineral resource at Wildcat. Material will also be collected for metallurgical and geotechnical testing to be used in future studies.
The greenfield portion of the 2024 drilling program will focus on three primary targets:
Wildcat Deposit Overview
Wildcat is located within the Farrell mining district in Nevada, 56 km north of the town of Lovelock within Pershing County. The property can be accessed year-round by roads from Lovelock via State Route 399 and Seven Troughs Road. The 17,612-acre land package consists of 916 unpatented claims and 4 patented claims. The claims are located on publicly-owned lands administered by the U.S. Bureau of Land Management.
Mineralization at Wildcat is genetically related to a mid-Miocene rhyolite dome complex developed during the extensional dominated tectonic environment of the Nevada Rift. The bulk-tonnage gold mineralization is hosted in tuff breccia that is considered to be the erosional remnant of a subaerial apron to a phreatomagmatic diatreme vent. The tuff breccia-hosted gold mineralization was fed from low-sulphidation veins in the underlying Mesozoic granodiorite basement. Additional bulk-tonnage gold mineralization associated with tuff breccia may be present elsewhere within the district, particularly beneath a post-mineral mafic volcanic cover sequence and within the interpreted main feeder diatreme. Low-sulphidation epithermal veins beneath the tuff breccia have the potential to host high-grade gold targets.
A technical report for the Nevada North Project, comprised of the Wildcat and Mountain View deposits, is available under Integra's SEDAR+ profile at www.sedarplus.ca and EDGAR profile at www.sec.gov.
Wildcat Mineral Resource Estimate
Tonnes | g/t | oz Au | g/t | oz Ag | g/t | oz AuEq | ||
Oxide | Indicated | 59,872,806 | 0.39 | 746,297 | 3.34 | 6,437,869 | 0.43 | 829,152 |
Inferred | 22,455,848 | 0.29 | 209,662 | 2.74 | 1,980,129 | 0.33 | 235,146 |
(1) | Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
(2) | Refer to the NI 43-101 technical report titled: "Technical Report Preliminary Economic Assessment for the Wildcat and Mountain View Projects, Pershing and Washoe Counties, Nevada, USA", dated June 28, 2023 with an effective date of July 30, 2023 available under Integra Resources' SEDAR+ profile at www.sedarplus.com and EDGAR profile at www.sec.gov. |
(3) | The estimate is reported for open-pit mining scenario and with reasonable assumptions. |
(4) | The cut-off grade of 0.15 g/t Au was calculated using a gold price of US$1,800/oz, mining costs vary from US$1.5/t to US$2.4/t (depending on material type and project location), processing cost of US$3.1/t and US$3.7/t, G&A costs of US$0.4/t to US$0.5/t, and metallurgical gold recoveries varying from 30% to 86%. Gold equivalent in the Resource Estimate is calculated by g/t Au + (g/t Ag ÷ 77.7). |
(5) | Rounding as required by reporting guidelines may result in apparent discrepancies between tonnes, grades, and contained metal content. |
(6) | The estimate of mineral resources may be materially affected by geology, environment, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. |
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by Raphael Dutaut, Ph.D (P.Geo), Integra's Vice President Geology and Mining. Mr. Dutaut is a "qualified person" as defined in National Instrument 43- 101 – Standards of Disclosure for Mineral Projects ("NI 43-101").
About Integra Resources
Integra is one of the largest precious metals exploration and development companies in the Great Basin of the Western USA. Integra is currently focused on advancing its two flagship oxide heap leach projects: the past producing DeLamar Project located in southwestern Idaho and the Nevada North Project, comprised of the Wildcat and Mountain View deposits, located in northwestern Nevada. The Company also holds a portfolio of highly prospective early-stage exploration projects in Idaho, Nevada, and Arizona. Integra's long-term vision is to become a leading USA focused mid-tier gold and silver producer.
ON BEHALF OF THE BOARD OF DIRECTORS
Jason Kosec
President, CEO and Director
Forward Looking and Other Cautionary Statements
Certain information set forth in this news release contains "forward‐looking statements" and "forward‐looking information" within the meaning of applicable Canadian securities legislation and applicable United States securities laws (referred to herein as forward‐looking statements). Except for statements of historical fact, certain information contained herein constitutes forward‐looking statements which includes, but is not limited to, statements with respect to: the future financial or operating performance of the Company and the Company's mineral properties and project portfolio; the results from work performed to date; the estimation of mineral resources and reserves; the realization of mineral resource and reserve estimates; the development, operational and economic results of technical reports on mineral properties referenced herein; magnitude or quality of mineral deposits; the anticipated advancement of the Company' mineral properties and project portfolios; exploration expenditures, costs and timing of the development of new deposits; underground exploration potential; costs and timing of future exploration; the completion and timing of future development studies; estimates of metallurgical recovery rates; exploration prospects of mineral properties; requirements for additional capital; the future price of metals; government regulation of mining operations; environmental risks; the timing and possible outcome of pending regulatory matters; the realization of the expected economics of mineral properties; future growth potential of mineral properties; and future development plans.
Forward-looking statements are often identified by the use of words such as "may", "will", "could", "would", "anticipate", "believe", "expect", "intend", "potential", "estimate", "budget", "scheduled", "plans", "planned", "forecasts", "goals" and similar expressions. Forward-looking statements are based on a number of factors and assumptions made by management and considered reasonable at the time such information is provided. Assumptions and factors include: the Company's ability to complete its planned exploration programs; the absence of adverse conditions at mineral properties; no unforeseen operational delays; no material delays in obtaining necessary permits; the price of gold remaining at levels that render mineral properties economic; the Company's ability to continue raising necessary capital to finance operations; and the ability to realize on the mineral resource and reserve estimates. Forward‐looking statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or result expressed or implied by such forward‐looking statements. These risks and uncertainties include, but are not limited to: integration risks; general business, economic and competitive uncertainties; the actual results of current and future exploration activities; conclusions of economic evaluations; meeting various expected cost estimates; benefits of certain technology usage; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; geological, mining and exploration technical problems; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); title to properties; and management's ability to anticipate and manage the foregoing factors and risks. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in the forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Readers are advised to study and consider risk factors disclosed in Integra's annual report on Form 20-F dated March 28, 2024 for the fiscal year ended December 31, 2023.
There can be no assurance that forward‐looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward‐looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The forward-looking statements contained herein are presented for the purposes of assisting investors in understanding the Company's plans, objectives and goals, and may not be appropriate for other purposes. Forward-looking statements are not guarantees of future performance and the reader is cautioned not to place undue reliance on forward‐looking statements.
Cautionary Note for U.S. Investors Concerning Mineral Resources and Reserves
NI 43-101 is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Technical disclosure contained in this news release has been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Classification System. These standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and resource information contained in this news release may not be comparable to similar information disclosed by domestic United States companies subject to the SEC's reporting and disclosure requirements.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/integra-provides-overview-of-upcoming-drill-program-at-wildcat-deposit-in-nevada-302158809.html
SOURCE Integra Resources Corp.
Copyright 2024 Canada NewsWire
1 Year Integra Resources Chart |
1 Month Integra Resources Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions