ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

HMX Hunt Mining Corp

0.115
0.00 (0.00%)
30 Apr 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Hunt Mining Corp TSXV:HMX TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.115 0.115 0.115 0 01:00:00

Hunt Mining Provides an Update on Concentrate Shipments From Martha Project - 2018 Year to Date

26/07/2018 12:01pm

GlobeNewswire Inc.


Hunt Mining (TSXV:HMX)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Hunt Mining Charts.

Hunt Mining Corp. (the “Corporation” or “Hunt”) (TSX VENTURE:HMX) (OTCQB:HGLD) is pleased to update concentrate shipments from the Martha Project located in Santa Cruz Province, Argentina. The total, contained troy ounces of silver and gold in these three shipments was 87,533.49 and 206.98, respectively.

Argentina Ag-Au 2018 Shipments (based on Alex Stewart outbound port assays)
ShipmentDate of AnalysisWeight dmtAg g/t grade & weighted averageAu g/t grade & weighted averageSilver (Troy Ounces)Gold (Troy Ounces)
 1019-Feb-201819.99755,89791.735,937.1958.96
1120-Mar-201813.29548,23047.420,615.6220.26
1223-Jul-201816.25359,288244.530,980.69127.76
Summaries 49.52754,952.02129.9487,533.49206.98

1 troy ounce = 31.1035 gramsdmt = dry metric tonneg/t = grams per tonneGrades are based on independent assays taken at the Deseado port by Alex Stewart International, a global, independent, certified analytical services company.

Ongoing activity at the Martha Project is being undertaken without established mineral resources or reserves and the Corporation has not established the economic viability of the operations on the Martha Project. As a result, there is increased uncertainty and economic risk of failure associated with these production activities.  Hunt is presently preparing an updated NI 43-101 Technical Report (“Technical Report”) for the Martha property.  It is anticipated that this Technical Report will be published in Q3 2018.   

Donald J, Birak, an independent consulting geologist and Registered Member of the Society for Mining, Metallurgy and Exploration, and Qualified Person, as defined by Canadian National Instrument 43-101, has approved the scientific and technical and details of this press release.

Additional information on the Martha Project and other Santa Cruz, Argentina projects can be viewed on the Company website at: www.huntmining.com.

About Hunt Mining

Hunt Mining Corp. has continued to develop its properties as an active and aggressive explorer in Santa Cruz since 2006. During that time, Hunt's wholly owned subsidiary, Cerro Cazador S.A., has completed exploration activity including 62,000 meters of HQ core drilling, 416 line kilometers of Induced Polarization geophysical surveys and more than 20,000 surface soil, sediment, channel, chip, and trench samples, beyond the historical work previous to the same properties. Hunt also owns a 100% interest in the Martha Mine, located in the Santa Cruz Province, Argentina.

For more information contact:

Dean Stuart Investor RelationsT: (403) 617-7609E: dean@boardmarker.net

Bob Little Chief Administration OfficerT: (509) 290-5659E: blittle@huntmining.com

Neither the TSX Venture nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture) accepts responsibility for the adequacy or accuracy of this release.

1 Year Hunt Mining Chart

1 Year Hunt Mining Chart

1 Month Hunt Mining Chart

1 Month Hunt Mining Chart

Your Recent History

Delayed Upgrade Clock