ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

EPK

0.00
0.00 (0.00%)
Last Updated: -
Delayed by 15 minutes
Share Name Share Symbol Market Type
TSXV:EPK TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

EPM Mining Announces Filing of the Preliminary Feasibility Study for its Sevier Lake Playa Sulphate of Potash Project

18/11/2013 4:42pm

Marketwired Canada


EPM Mining Ventures Inc. (TSX VENTURE:EPK)(OTCQX:EPKMF) ("EPM" or the "Company")
announced today the filing on SEDAR of a technical report entitled "NI 43-101
Technical Report Preliminary Feasibility Study of the Sevier Lake Playa Sulphate
of Potash Project, Millard County, Utah" dated effective October 25, 2013 by
CH2M HILL Engineers, Inc., Agapito Associates, Inc., and Norwest Corporation
(the "Technical Report"). 


The Technical Report outlines the results of the Preliminary Feasibility Study
("PFS") of EPM's Sevier Lake Playa Sulphate of Potash Project located in
southwestern Utah. EPM first reported the economic results of the PFS in a press
release dated October 29, 2013.


The Technical Report is available on EPM's SEDAR profile page at www.sedar.com
as well as on EPM's website. 


About EPM Mining Ventures

EPM, through its wholly owned subsidiary Peak Minerals Inc., controls directly
or through agreement, mineral leases on more than 124,000 acres on the Sevier
Lake Playa property in Millard County, Utah. EPM is targeting the future
development and production of SOP, a premium-priced fertilizer used with
specialty crops and soil types, through a cost-effective solar evaporation
methodology. The Company is currently engaged in engineering and chemical
analysis designed to support the completion of a feasibility study. 


For more information on the Company, please visit our web site at
www.epmmining.com. 


Neither TSX Venture Exchange nor its Regulation Services Provider (as that term
is defined in the policies of the TSX Venture Exchange) accepts responsibility
for the adequacy or accuracy of this release.


FOR FURTHER INFORMATION PLEASE CONTACT: 
EPM Mining Ventures Inc.
Lance D'Ambrosio
Chief Executive Officer
(801) 485-0223
www.epmmining.com

1 Year Chart

1 Year  Chart

1 Month Chart

1 Month  Chart

Your Recent History

Delayed Upgrade Clock