ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for default Register for Free to get streaming real-time quotes, interactive charts, live options flow, and more.

CLE Clean Commodities Corp

0.03
0.00 (0.00%)
22 Nov 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Clean Commodities Corp TSXV:CLE TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.03 0.025 0.035 0 00:00:00

Azincourt Energy to Begin Road Construction, Sets Drilling Timeline, at East Preston Uranium Project

05/12/2019 1:00pm

GlobeNewswire Inc.


Clean Commodities (TSXV:CLE)
Historical Stock Chart


From Nov 2019 to Nov 2024

Click Here for more Clean Commodities Charts.

AZINCOURT ENERGY CORP. (“Azincourt” or the “Company”) (TSX.V: AAZ, OTC: AZURF), is pleased to provide an additional update on permitting and preparation plans for the 2020 winter diamond drilling program at the 25,000+ hectare East Preston Uranium Project, located 50km southeast of Patterson Lake, in the Western Athabasca Basin, northern Saskatchewan, Canada.

A permit for road construction is in place, and weather permitting, road opening into the main exploration camp and drilling areas will be initiated in the next two weeks.  The plan calls for the re-opening of approximately 65km of winter road, passing Purepoint Uranium Group’s turnoff to Hook Lake at 15km in, and the Azincourt camp at Bolton Lake Wilderness Lodge, at 55km. A preliminary open to the lodge should be in effect by Christmas, after which an additional 8km of new winter road will be established into the Five Island Lake area (central to the Zone-A and Zone-B targets as referenced in the Company’s Drill Plan news release dated December 4, 2019).

Drill mobilization is then scheduled for January 2020, following receipt of 2020 drill/work permits, which are expected to be received sometime in the next few weeks. 

As detailed in the December 4, 2019 Company news release, drill target prioritization has been completed, based on compilation of results from the 2019 winter drill program and 2018 and 2019 ground-based EM & gravity surveys, and property-wide helicopter-borne Versatile Time-Domain Electromagnetic (VTEM™ Max) and magnetic surveys.

The proposed $1.2M drill program will focus on prospective targets in the Five Island Lakes area with 2000-2500m (up to 15 holes) of diamond drilling at 8-to-10 pad locations. The Company will continue to provide updates as permitting is received, groundwork commences, and drill mobilization begins over the next few weeks.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/3bf85cb0-0a60-41b5-9d84-0e308311098b

About East Preston

Azincourt is currently earning towards 70% interest in the 25,000+ hectare East Preston project as part of a joint venture agreement with Skyharbour Resources (TSX.V: SYH), and Clean Commodities Corp (TSX.V: CLE). Extensive regional exploration work at East Preston was completed in 2013-14, including airborne electromagnetic (VTEM), magnetic and radiometric surveys. Three prospective conductive, low magnetic signature corridors have been discovered on the property. The three distinct corridors have a total strike length of over 25 km, each with multiple EM conductor trends identified.  Ground prospecting and sampling work completed to date has identified outcrop, soil, biogeochemical and radon anomalies, which are key pathfinder elements for unconformity uranium deposit discovery.

The Company completed a winter geophysical exploration program in January-February 2018 that generated a significant amount of new drill targets within the previously untested corridors while refining additional targets near previous drilling along the Swoosh corridor.

Ground-truthing work confirmed the airborne conductive trends and more accurately located the conductor axes for future drill testing. The gravity survey identified areas along the conductors with a gravity low signature, which is often associated with alteration, fault/structural disruption and potentially, uranium mineralization. The combination/stacking of positive features has assisted in prioritizing targets.

The Main Grid shows multiple long linear conductors with flexural changes in orientation and offset breaks in the vicinity of interpreted fault lineaments – classic targets for basement-hosted unconformity uranium deposits. These are not just simple basement conductors; but clearly upgraded/enhanced prospectivity targets because of the structural complexity.

The targets are basement-hosted unconformity related uranium deposits similar to NexGen’s Arrow deposit and Cameco’s Eagle Point mine. East Preston is near the southern edge of the western Athabasca Basin, where targets are in a near surface environment without Athabasca sandstone cover – therefore they are relatively shallow targets but can have great depth extent when discovered. The project ground is located along a parallel conductive trend between the PLS-Arrow trend and Cameco’s Centennial deposit (Virgin River-Dufferin Lake trend).

In early 2019 the Company conducted a small initial diamond drill program totaling 552 meters. The results confirmed the prospectivity of the East Preston project, as basement lithologies and graphitic structures intersected at East Preston were found to be very similar and appear to be analogous to the Patterson Lake South-Arrow-Hook Lake/Spitfire uranium deposit host rocks and setting.

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43- 101 and reviewed on behalf of the company by Ted O’Connor, P.Geo. a director of the Company, as well as a qualified person.

About Azincourt Energy Corp. 

Azincourt Energy is a Canadian-based resource company specializing in the strategic acquisition, exploration and development of alternative energy/fuel projects, including uranium, lithium, and other critical clean energy elements.  The Company is currently active at its joint venture East Preston uranium project in the Athabasca Basin, Saskatchewan, Canada, and the Escalera Group uranium-lithium project located on the Picotani Plateau in southeastern Peru.

ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.

“Alex Klenman”

Alex Klenman, President & CEONeither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This press release includes “forward-looking statements”, including forecasts, estimates, expectations and objectives for future operations that are subject to a number of assumptions, risks and uncertainties, many of which are beyond the control of Azincourt.  Investors are cautioned that any such statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in the forward-looking statements. Such forward-looking information represents management’s best judgment based on information currently available.  No forward-looking statement can be guaranteed, and actual future results may vary materially.

For further information please contact:

Alex Klenman, President & CEO

Tel: 604-638-8063

info@azincourtenergy.com

Azincourt Energy Corp.

1430 – 800 West Pender Street

Vancouver, BC V6C 2V6

www.azincourtenergy.com

1 Year Clean Commodities Chart

1 Year Clean Commodities Chart

1 Month Clean Commodities Chart

1 Month Clean Commodities Chart

Your Recent History

Delayed Upgrade Clock