![](/cdn/assets/images/search/clock.png)
We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
TSXV:CDE | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0 | - |
Challenger Deep Resources Corp. (TSX VENTURE:CDE) ("Challenger" or the "Company") is pleased to provide an exploration update on the Pelangi property, one of the four properties in the Company's Tabang Coal Project located in East Kalimantan, Indonesia.
The Pelangi Mining license is in the "Local Announcement" stage with the IUP Exploration permit currently in process.
The property covers an area of approximately 4,000 hectares and is located approximately 10km south of Challenger's ATRP property. The project covers the Balikpapan formation which is prospective for coal in the quality range of CV 4,000 - 6,000 Kcal/kg (Adb) and is known to host large resources of coal in the general Tabang area.
The phase 1 program of mapping, outcrop/test pit sampling and analysis has been completed. This program is the precursor to a phase 2 drilling program which will commence upon granting of the IUP Exploration permit and other permitting as required. In the interim, work will continue on geological interptretation and drill hole planning.
Up to the end of October, 2011, exploration has resulted in the discovery of 32 coal outcrops representing multiple seams in two separate zones with the main area of coal outcrop containing multiple seams covering an area of 5 x 2km. The coal seams are generally flat dippping an average angle of 10 degrees to south and southeast. The thickness of the seams varies from 0.15 - greater than 6.0 meters.
A total of 27 samples were collected and analysed from outcropping coal and 6 test pits. Coal quality indicates middle to upper Balikpapan formation.
Coal Quality of the Pelangi Property
--------------------------------------------------------------------------- GCV (Kcal Thick- TM IM Ash VM FC TS /Kg) No ness (m) Sample Code %,AR %,ADB %,ADB %,ADB %,ADB %,ADB ADB Lab --------------------------------------------------------------------------- 1 greater CDR-KP6-OC- 27.99 17.54 2.45 41.98 38.03 0.18 5320 SGS than 12022011-KH01 0.25 --------------------------------------------------------------------------- 2 greater OC RAB 1 48.41 20.34 4.56 38.33 36.77 0.19 4778 SGS than 1 --------------------------------------------------------------------------- 3 greater OC RAB 2 44.85 17.32 3.87 41.48 37.33 0.16 5105 SGS than 2.20 --------------------------------------------------------------------------- 4 ? OC RAB 5 43.94 18.60 8.86 37.06 35.48 0.40 4698 SGS --------------------------------------------------------------------------- 5 greater CDR-PL-OC-160611- 40.76 15.19 5.48 41.55 37.78 0.2 5094 SGS than YN01 2.30 --------------------------------------------------------------------------- 6 greater CDR-PL-OC-160611- 43.44 16.40 4.52 41.69 37.38 0.17 5275 SGS than YN02 2.60 --------------------------------------------------------------------------- 7 greater CDR-PL-OC-160611- 42.21 15.36 4.69 39.94 40.02 0.23 5109 SGS than YN03 2.40 --------------------------------------------------------------------------- 8 0.50 CDR-PL-OC-180611- 35.17 12.68 16.60 34.42 36.30 0.49 4497 SGS YN04 --------------------------------------------------------------------------- 9 0.50 CDR-PL-OC-180611- 39.22 15.00 2.23 42.63 40.15 0.29 5521 SGS YN05 --------------------------------------------------------------------------- 10 0.70 CDR-PL-TP-200611- 40.04 14.84 8.32 37.52 39.32 0.48 5140 SGS YN01 --------------------------------------------------------------------------- 11 greater CDR-PL-OC-250611- 32.1 13.38 1.50 46.68 38.45 0.18 5831 SGS than YN06 2.10 --------------------------------------------------------------------------- 12 0.40 CDR-PL-OC-250611- 33.9 12.19 9.91 39.58 38.32 0.33 4979 SGS YN07 --------------------------------------------------------------------------- 13 greater CDR-PL-OC-250611- 34.21 13.20 7.28 39.28 40.24 0.33 5107 SGS than YN08 0.40 --------------------------------------------------------------------------- 14 greater CDR-PL-OC-280611- 31.54 14.43 10.13 39.08 36.36 0.31 5023 SGS than YN09 0.30 --------------------------------------------------------------------------- 15 greater CDR-PL-OC-280611- 32.49 13.67 4.53 40.94 40.86 0.25 5364 SGS than YN10 1.10 --------------------------------------------------------------------------- 16 greater CDR-PL-OC-020711- 39.39 16.06 1.46 40.97 41.52 0.35 5532 SGS than YN11 0.30 --------------------------------------------------------------------------- 17 greater CDR-PL-OC-070711- 37.58 13.78 8.73 37.54 39.95 0.27 4854 SGS than YN12 1.00 --------------------------------------------------------------------------- 18 greater CDR-PL-OC-070711- 40.96 17.08 2.18 39.49 41.25 0.20 5333 SGS than YN13 0.60 --------------------------------------------------------------------------- 19 0.35 CDR-PL-TP-130811- 35.64 12.19 17.35 34.93 35.53 0.3 4493 SGS DW1 --------------------------------------------------------------------------- 20 0.3 CDR-PL-TP-140811- 35.65 14.2 9.04 39.42 37.34 0.28 5017 SGS DW2 --------------------------------------------------------------------------- 21 2.1 CDR-PL-TP-200811- 36.44 14.22 1.79 43.17 40.82 0.23 5565 SGS DW3 --------------------------------------------------------------------------- 22 3.5 CDR-PL-TP-120911- 36.43 16.02 3.5 41.96 38.52 0.16 5377 SGS DW4 --------------------------------------------------------------------------- 23 greater CDR-PL-TP-210911- 36.98 14 5.61 42.27 38.12 0.22 5285 SGS than DW5 2.5 --------------------------------------------------------------------------- 24 greater CDR-PL-TP-141011- 45.33 16.28 6.81 39.84 37.06 0.25 4794 SGS than 6 DW6 A --------------------------------------------------------------------------- 25 greater CDR-PL-TP-141011- 42.99 14.14 8.58 43.32 33.96 0.2 4901 SGS than 6 DW6 B --------------------------------------------------------------------------- 26 greater CDR-PL-TP-141011- 45.23 14.69 3.22 43.89 38.2 0.13 5376 SGS than 6 DW6 C --------------------------------------------------------------------------- 27 1.05 CDR-PL-TP-171011- 36.1 12.71 21.3 34.35 31.65 0.28 3952 SGS DW7 ---------------------------------------------------------------------------
Challenger's Tabang Project encompasses four properties, ATRP and Pelangi which are under the terms of Conditional Sale and Purchase Agreements (CSPAs) and two properties under exclusive MOUs. ATRP received the first IUP Exploration permit and accordingly is the first property to have been drilled. Challenger is preparing for the IUP Mining license on ATRP and will commence drilling on Pelangi once the IUP Exploration permit has been issued for that property. CSPAs for the two other Tabang Project properties are being prepared.
It is Challenger's intention to begin mining operations on the ATRP property first utilizing a local short-haul road and jetty facilities to be constructed. As the other Tabang Project properties are advanced, the intention is to link all properties with a common haul road and to construct a larger jetty and loading facility further down-river from ATRP.
All outcrop and test pit samples for the Pelangi property were processed by SGS Coal Laboratories, Samarinda, East Kalimantan. Industry standard Quality Control and Quality Assurance protocols were employed in the sample acquisition, preparation and analysis procedures.
The Qualified Person (as defined by NI 43-101) responsible for the review and approval of the technical material presented in this news release is Mr. Andre Talaska, a director of PT Bestindo Energy, a wholly owned subsidiary of Challenger.
Challenger also announces that Mr. Brent Stevenson has resigned from Challenger's board of directors to pursue other business endeavours. The Board wishes to thank Mr. Stevenson for his contributions over the past years.
About Challenger
Challenger Deep Resources Corp. is an exploration company focused on the Indonesian coal industry. Challenger's business plan is to acquire, explore and to bring its viable coal projects into production. Challenger has an experienced Indonesian exploration and mining team with offices in Calgary, Singapore and Jakarta.
READER ADVISORY
Statements in this press release may contain forward-looking information including, statements regarding expected exploration activities and property related agreements and permits. Any statements that are contained in this press release that are not statements of historical fact may bedeemed to be forward-looking statements. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of which are beyond the control of Challenger. Factors that could cause the actual results to differ materially from those in forward-looking statements include, granting of exploration permits, surface access, mining and other licenses from Indonesian regulatory authorities, preliminary exploration results, the continued availability of capital and financing, and general economic, market or business conditions in North America and in the Asia Pacific region. The reader is cautioned not to place undue reliance on any forward-looking information. There can be no assurance that the proposed exploration programs in Indonesia or other project acquisitions will be completed or, if completed, will be successful.
The forward-looking statements contained in this press release are made as of the date of this press release, and Challenger does not undertake any obligation to update publicly or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise, except as required by securities law.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy of accuracy of this news release.
Contacts: Challenger Deep Resources Corp. Ranjeet Sundher President +65-6220-7745 Challenger Deep Resources Corp. Kirk Gamley Investor Relations 604-689-7422 Challenger Deep Resources Corp. Mas Kobuchi Investor Relations 604-689-7422www.challengerdeep.ca
1 Year Challenger Deep Resources Corp. Chart |
1 Month Challenger Deep Resources Corp. Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions