ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for discussion Register to chat with like-minded investors on our interactive forums.

ANM Antares Minerals

0.00
0.00 (0.00%)
Share Name Share Symbol Market Type
Antares Minerals TSXV:ANM TSX Venture Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0 -

Antares Intersects 2.00% Cu Over 52.45 m at Cristo de los Andes Prospect, Haquira Cu-Mo-Au Project, Peru

01/02/2010 9:12pm

Marketwired Canada


Antares Minerals Inc. ("Antares") (TSX VENTURE:ANM) is pleased to announce the
results of ten additional diamond drill holes (2,451 m) from the drilling
campaign completed in late 2009 at the Cristo de los Andes target of the Haquira
Cu-Mo-Au project in southern Peru. These results extend the area of near-surface
secondary copper mineralization, amenable to SX-EW heap leaching, to a minimum
strike length of 600 m and a width of 250-300 m (please see figure 1 below). 


Highlights of secondary Cu mineralization from the ten holes reported in this
release are as follows:




--  ACAD-015 31.70 m with 2.02% Cu and 0.190 g/t Au 
     and 28.95 m with 1.41% Cu and 0.104 g/t Au

--  ACAD-014 33.40 m with 0.84% Cu and 0.032 g/t Au 

--  ACAD-013 52.45 m with 2.00% Cu and 0.050 g/t Au 
     including 26.75 m with 3.65% Cu and 0.074 g/t Au

--  ACAD-009 19.25 m with 1.19% Cu and 0.034 g/t Au and 0.017% Mo 
     and 25.05 m with 1.45% Cu and 0.103 g.t Au and 0.030% Mo
     and 47.10 m with 0.59% Cu 

--  ACAD-007 21.40 m with 0.76% Cu and 0.032 g/t Au 
     and 41.40 m with 0.84% Cu and 0.052 g/t Au
     and 32.00 m with 0.86% Cu and 0.021% Mo

--  Bottle roll metallurgical tests to determine leaching characteristics of
    the secondary copper mineralization will be underway within the next few
    weeks. 

--  Primary copper sulphide mineralization encountered at depth in several
    holes including 
    --  ACAD-006 37.55 m with 0.74% Cu 
    --  ACAD-008 69.50 m with 0.35% Cu, 0.065 g/t Au and 0.026% Mo 
    --  ACAD-012 25.30 m with 0.52% Cu 
    --  ACAD-014 49.25 m with 0.44% Cu, 0.032 g/t Au and 0.023% Mo 
    --  Follow-up drilling is warranted for next drill campaign 

--  Haquira Resource Estimate Update: The updated resource estimate for the
    Haquira East and Haquira West deposits is nearly complete with an
    anticipated release date of mid-February. The report has been pushed
    back approximately two weeks to incorporate key drill results from late
    2009 and due to restricted availability of key third-party staff
    involved in the preparation of the estimate. Please note that the
    mineralization at Cristo de los Andes will not be included in this
    updated Haquira project resource estimate. 



John Black, President and CEO of Antares Minerals Inc., commented as follows:

"We continue to be encouraged with drill results from Cristo de los Andes. These
new results double the previously reported strike length of mineralization to
600 m and consistently demonstrate better than expected grades, commonly in the
range of 1-2% Cu in the near-surface secondary zone. Several of the holes also
encountered encouraging intercepts of underlying primary Cu-Mo-Au sulphide
mineralization.


The initial drill program has exceeded its objectives and the Cristo de los
Andes prospect has very good potential to make a significant economic
contribution to the overall Haquira Project. We look forward to the initiation
of a substantial second drilling campaign in the next few months to delineate
the grade and tonnage potential of the secondary zone and explore for primary
mineralization at depth. "


To view the Figure 1. Geology and Drill Hole Locations - Cristo de los Andes
Prospect map, please click the following link:
http://media3.marketwire.com/docs/201anm_fig1.pdf


Please see Table 1 below for a complete summary of the new results and refer to
the Antares website at www.antaresminerals.com for drill-hole location maps,
cross sections and additional information about the Cristo de los Andes prospect
and the Haquira Copper project. The initial phase of drilling at Cristo de los
Andes has been completed with a total of 4,265 m in 15 holes and all holes have
now been reported. The drilling campaign was extended from an original plan of
3,000 m based upon the positive results received from initial drilling.




----------------------------------------------------------------------------
 Table 1 - Significant drill intercepts Cristo de los Andes - Holes ACAD-006
                                 to ACAD-015                                
----------------------------------------------------------------------------
            from        Length             %                              
Drill-hole    (m) to (m)    (m)   Cu% soluble Au g/t   Mo%         Comments
----------------------------------------------------------------------------
ACAD-006   30.25  67.80  37.55   0.74      32  0.028 0.002  0.2% Cu cut-off;
                                                            mixed/primary   
----------------------------------------------------------------------------
TD = 83.95                                                  hole lost at    
     m                                                      83.95 m         
----------------------------------------------------------------------------
ACAD-007    6.20  27.60  21.40   0.76      57  0.032 0.001  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
TD =       73.55 114.95  41.40   0.84      89  0.052 0.012  0.2% Cu cut-off;
 311.60 m                                                   secondary       
----------------------------------------------------------------------------
          206.45 238.45  32.00   0.86      80  0.019 0.021  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
including 226.40 238.45  12.05   1.79      79  0.027 0.015  0.7% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
          244.50 282.15  37.65   0.33      19  0.026 0.015  0.2% Cu cut-off;
                                                            primary         
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ACAD-008    0.00  29.85  29.85   0.37      67  0.043 0.002  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
TD =       38.90  70.70  31.80   0.37      40  0.026 0.007  0.2% Cu cut-off;
 284.55 m                                                   mixed           
----------------------------------------------------------------------------
          185.05 254.55  69.50   0.35       5  0.065 0.026  0.2% Cu cut-off;
                                                            primary         
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ACAD-009   60.40  79.65  19.25   1.19      83  0.034 0.017  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
TD =      119.30 144.35  25.05   1.45      91  0.103 0.030  0.2% Cu cut-off;
 354.25 m                                                   secondary       
----------------------------------------------------------------------------
          208.10 255.20  47.10   0.59      61  0.019 0.015  0.2% Cu cut-off;
                                                            mixed           
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ACAD-010   42.55  49.40   6.85   0.47      78  0.076 0.011  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
TD =       76.60  81.00   4.40   0.96      87  0.215 0.007  0.2% Cu cut-off;
 325.65 m                                                   secondary       
----------------------------------------------------------------------------
           91.90  98.50   6.60   0.36      51  0.036 0.003  0.2% Cu cut-off;
                                                            mixed           
----------------------------------------------------------------------------
          111.90 121.25   9.35   0.31      38  0.045 0.007  0.2% Cu cut-off;
                                                            mixed           
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ACAD-011  214.45 222.05   7.60   1.10      13  0.011 0.001  0.2% Cu cut-off;
                                                            primary         
----------------------------------------------------------------------------
TD =                                                                     
 242.20 m                                                                  
----------------------------------------------------------------------------
ACAD-012   82.90 108.20  25.30   0.52       9  0.038 0.003  0.2% Cu cut-off;
                                                            primary         
----------------------------------------------------------------------------
TD =      116.45 124.80   8.35   0.60       6  0.022 0.002  0.2% Cu cut-off;
 181.95 m                                                   primary         
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ACAD-013   24.55  77.00  52.45   2.00      70  0.050 0.011  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
including  26.60  53.35  26.75   3.65      71  0.074 0.013  1.0% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
TD =       92.25 104.45  12.20   0.66      82  0.076 0.028  0.2% Cu cut-off;
 198.75 m                                                   secondary       
----------------------------------------------------------------------------
          179.25 198.75  19.50   0.25      10  0.025 0.014  0.2% Cu cut-off;
                                                            primary         
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ACAD-014   21.50  35.65  14.05   0.54      78  0.017 0.002  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
TD =       50.10  83.50  33.40   0.84      72  0.032 0.009  0.2% Cu cut-off;
 264.60 m                                                   secondary       
----------------------------------------------------------------------------
          150.35 160.00   9.65   1.09      95  0.066 0.032  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
          190.15 239.40  49.25   0.44      57  0.032 0.023  0.2% Cu cut-off;
                                                            mixed           
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
ACAD-015    0.00  31.70  31.70   2.02      93  0.190 0.026  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
TD =      141.70 170.65  28.95   1.41      80  0.104 0.021  0.2% Cu cut-off;
 203.55 m                                                   secondary       
----------------------------------------------------------------------------
including 143.45 152.25   9.80   2.71      76  0.239 0.030  1.0% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
          179.90 191.90  12.00   0.54      95  0.018 0.001  0.2% Cu cut-off;
                                                            secondary       
----------------------------------------------------------------------------
          197.90 203.55   5.65   0.70      21  0.046 0.009  0.2% Cu cut-off;
                                                            primary         
----------------------------------------------------------------------------



Discussion of results

The Cristo de los Andes property is located immediately to the south of Antares'
Haquira property and the areas are collectively referred to as the Haquira
project. The principal area of known mineralization at Cristo de los Andes is
located approximately 10 km south from Antares' Haquira East and Haquira West
discoveries. The best exposed mineralization occurs within a 100 m by 400 m zone
with abundant copper oxides and secondary copper sulphides hosted in siltstones,
sandstones, and quartzites of the Jurassic Chuquibambilla and Soraya Formations.
This area of mineralization trends to the north-northwest and is associated with
the western margin of a multi-phase monzonite intrusive complex in a setting
almost identical to that of the Haquira East deposit. 


The first five drill holes of the 2009 drill campaign (see news release of
November 12, 2009) tested the immediate area of exposed mineralization and
defined secondary copper mineralization over an area with minimum dimensions of
300 m along strike and 200 m in width. The additional ten holes reported in this
release extended the area of drilling an additional 200 m to the northwest
(ACAD-007 and ACAD-009) and 100 m to the southeast (ACAD-006 and ACAD-008).
Drill holes ACAD-014 and ACAD-015 were completed on the section with most
control across the mineralized zone (ACAD-001, ACAD-004, ACAD-005) and extended
the drill indicated width of the zone to approximately 300 m. Drill hole
ACAD-013 was drilled between ACAD-001 and ACAD-002 to complete a gap in the
100-m drill spacing along the mineralized zone and returned one of the best
intercepts of secondary Cu encountered to date with 2.00% Cu over 52.45 m. 


Drill hole ACAD-10 was drilled 600 m to the northeast of ACAD-009 to test the
north margin of the intrusive complex. This hole only encountered narrow
intercepts of secondary Cu but the area between ACAD-009 and ACAD-010 remains
prospective and warrants further drilling. Two holes (ACAD-011 and ACAD-012)
were drilled to the west of the principal mineralized zone and only encountered
narrow intercepts of primary Cu suphide mineralization.


With the exception of ACAD-008, which was drilled almost entirely in monzonite
intrusive rocks, the remaining nine drill holes intersected intercalated
quartzite and siltstone wall rocks along the margin of the monzonite intrusive
complex. Higher Cu grades are preferentially associated with siltsone horizons,
particularly where thin dikes or sills of intrusive rock are present. The area
of drill indicated secondary Cu mineralization now has minimum dimensions of 600
m along strike and 250-300 m in width and remains open to the north with strong
mineralization present in the northernmost drill hole (ACAD-009). 


Please refer to the Antares website at www.antaresminerals.com for drill-hole
location maps, geological cross sections and additional information about the
Cristo de los Andes target and the Haquira Copper project.


About the Cristo de los Andes prospect and the Haquira Copper project, Peru

The Haquira project offers potential for a low-strip, low-cost SX-EW copper
operation in southern Peru as well as a good opportunity for an underlying
higher grade primary porphyry copper-molybdenum mill/concentrator operation. The
project is located contiguous to, and immediately south of, Xstrata Copper's Las
Bambas Cu-Au project and consists of two blocks of property optioned under
separate agreements as well as additional concessions acquired by Antares for a
total of 20,635 hectares of area. Antares has an option agreement with Minera
Phelps Dodge del Peru S.A.C. to acquire a 100% interest in the original Haquira
project by completing optional payments totalling US$15 million over a five-year
period (see Antares press release dated March 17, 2005). A total of US$10
million has been paid to date with the remaining US$5.0 million due on or before
March 4, 2010. Antares also has an option agreement with Minera del Suroeste
S.A.C. (MISOSA), a wholly owned subsidiary of Hochschild Mining PLC, whereby
Antares can acquire up to a 60% interest in the Cristo de los Andes project,
located contiguous to, and immediately south of the Haquira project (April 28,
2008). Antares can acquire an initial 51% interest in the Cristo de los Andes
project by completing 12,000 m of drilling, making US$1,050,000 in payments and
granting MISOSA a production royalty of US$0.005/lb of Antares' share of copper
production exceeding 500,000,000 lbs from the Cristo de los Andes Property.
Antares also has the option to acquire an additional 9% interest in the project
for a total of 60% by electing to complete a bankable feasibility study within
five years.


Antares has announced an updated resource estimate (October 9, 2007) and
Preliminary Economic Assessment (May 14, 2008) for the near-surface, SX-EW
amenable portion of the Haquira project. This portion of the Haquira project
hosts an indicated resource of 133.7 million tonnes at 0.53% total Cu with an
additional inferred resource of 43.6 million tonnes at 0.44% total Cu (0.3%
total Cu cut-off, leachable secondary copper sulphide and oxide mineralization
only). This resource is projected to support a 50,000 t/d SX/EW heap leach
operation that will produce an average of 109 million lbs of copper cathode for
11 years of mine life. The capital cost to construct the operation is estimated
at US$301 million with a projected IRR of 26.9% and an NPV of US$224 million
utilizing a copper price of US$2.00/lb and a discount rate of 8%. 


Antares has also announced the first interim resource estimate for the
underlying primary Cu-Mo-Au mineralization at the Haquira East zone based upon
drill holes up to AHAD-120 (November 24, 2008). The Haquira East primary
mineralization includes an indicated resource of 147.9 million tonnes at 0.57%
Cu and 0.015% Mo, an inferred resource to a depth of 700m of 205.2 million
tonnes at 0.56% Cu and 0.014% Mo and an additional inferred resource below 700 m
depth of 99.4 million tonnes at 0.46% Cu and 0.008% Mo. Mineralization remains
open to depth and several directions laterally. Additional drill holes that have
been released after the completion of the interim resource calculation include
hole AHAD-159 which intersected 937 m of 1.14% Cu, 0.034% Mo and 0.1 g/t Au -
the best hole completed at Haquira to date.


Antares expects to release an updated resource estimate for the Haquira Project
(excluding the Cristo de los Andes prospect) in mid-February.


About Antares

Antares is a successful mineral exploration company with highly experienced
technical and management teams. The Company is focused on precious- and
base-metal exploration properties in Latin America that can be quickly and
cost-effectively advanced to the discovery and production stage. In addition to
the Haquira Project in Peru, Antares is also currently exploring the Rio Grande
(Cu-Au porphyry) project in Salta Province of NW Argentina on a 50/50
joint-venture basis with Pachamama Resources Ltd., a spin-off from Mansfield
Minerals Inc.


All of Antares' exploration programs and pertinent disclosure of a technical or
scientific nature are prepared by, or prepared under the direct supervision of
John Black, Antares' President, who serves as the qualified person (QP) under
the definitions of National Instrument 43-101. 


Antares' security, chain of custody and quality control is described on their
website and can be reviewed at:

http://www.antaresminerals.com/bestpractices/samplingmethodologies

Mineral resources do not have demonstrated economic viability and future in-fill
drilling and scoping, pre-feasibility and feasibility studies will determine
what percentage of the inferred resource can be placed into the mineable
category. Antares is not aware of any environmental, permitting, legal, title,
taxation, socio-political, marketing or other issue which may materially affect
this estimate of mineral resources.


Certain disclosure in this release, including management's assessment of
Antares' plans and projects, constitutes forward-looking statements that are
subject to numerous risks, uncertainties and other factors relating to Antares'
operation as a mineral exploration company that may cause future results to
differ materially from those expressed or implied. Readers are cautioned not to
place undue reliance on forward-looking statements.


The Cristo de los Andes prospect has a geological setting similar to Antares'
nearby Haquira discovery (which hosts 43-101 compliant resources containing a
total of 8.0 billion lbs Cu or 9.2 billion lbs Cu equivalent utilizing a cut-off
grade of 0.2% Cu for leachable resources and 0.3% Cu for primary sulphide
resources; see press releases of November 24th, 2008 and September 1st, 2009).


1 Year Antares Minerals Chart

1 Year Antares Minerals Chart

1 Month Antares Minerals Chart

1 Month Antares Minerals Chart