We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Alderon Iron Ore Corp | TSXV:ADV | TSX Venture | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.00 | 0.00% | 0 | - |
----------------------------------------------------------------- From To Drill Hole (meters) (meters) Length (meters) Total Iron % ----------------------------------------------------------------- K-10-37A 148.3 577.3 429.0 30.0 ----------------------------------------------------------------- including 326.4 371.6 45.2 33.6 ----------------------------------------------------------------- and 458.5 549.0 90.5 33.3 ----------------------------------------------------------------- ----------------------------------------------------------------- K-10-39A 12.7 370.7 358.0 28.7 ----------------------------------------------------------------- including 12.7 104.8 92.1 32.6 ----------------------------------------------------------------- and 121.1 226.0 104.9 32.3 ----------------------------------------------------------------- ----------------------------------------------------------------- K-10-40 15.0 123.0 108.0 32.1 ----------------------------------------------------------------- 145.4 210.7 65.3 31.4 -----------------------------------------------------------------
"The grade and width consistency at Kami is great to see," says Matt Simpson, Chief Operating Officer of Alderon. "Not only are we drilling within the mineralized zone that was previously outlined, but we continue to step outside the boundary and still see great mineralization."
All drill holes to date have tested the north eastern half of the Rose Lake Central Zone. Holes K-10-39A and K-10-40 were drilled within the known mineralized envelope, whereas K-10-37A was collared 210 meters to the southwest and confirms the extension of the mineralized zone.
Complete assay highlights with drill plan maps and sections are posted on the Alderon website at: http://www.alderonmining.com/projects/kami/
True widths of the reported intercepts vary depending on the angle of the individual drill holes and are estimated to be between 36% and 60% of the core interval as reported. Samples were prepared from sawn NQ-sized half-core sections on site in Labrador. Split drill core samples are then sent to SGS Mineral Services in Lakefield, Ontario for analyses. Total iron analysis is performed using X-ray fluorescence (XRF) and the magnetic component is determined by Satmagan magnetic analysis. Standards, blanks, and duplicate assays are included at regular intervals in each sample batch submitted from the field as part of an ongoing Quality Assurance/Quality Control program.
About Alderon
Alderon is a leading iron ore exploration and development company in Canada. The Kami Project is located within an existing iron ore district and is surrounded by producing iron ore mines. The Alderon team is comprised of skilled professionals with significant iron ore expertise to advance Kami towards production.
Alderon's exploration work on the Kami Property is supervised by Edward Lyons, P.Geo., the Chief Geologist for Alderon and a Qualified Person as defined by NI 43-101. Mr. Lyons has verified that the assay results presented above have been accurately summarized from the official assay certificates provided to Alderon.
For more information on Alderon, please visit our website at www.alderonmining.com.
ALDERON RESOURCE CORP.
On behalf of the Board
Mark J. Morabito, President & CEO
This news release may contain forward-looking statements. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statement or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Contacts: Alderon Resource Corp. - Vancouver Office Mark Morabito 604-681-8030 604-681-8039 (FAX) mmorabito@explorationgroup.com Alderon Resource Corp. - Toronto Office 416-309-2135 416-861-5887 (FAX) info@alderonmining.com www.alderonmining.com
1 Year Alderon Iron Ore Corp Chart |
1 Month Alderon Iron Ore Corp Chart |
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions