ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for charts Register for streaming realtime charts, analysis tools, and prices.

SNC SNC Lavalin Group Inc

43.49
0.00 (0.00%)
Last Updated: 01:00:00
Delayed by 15 minutes
Share Name Share Symbol Market Type
SNC Lavalin Group Inc TSX:SNC Toronto Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 43.49 43.31 43.57 0 01:00:00

SNC-Lavalin consortium awarded Evergreen Line rapid transit project in Metro Vancouver

31/01/2013 3:50pm

PR Newswire (Canada)


SNC Lavalin (TSX:SNC)
Historical Stock Chart


From Aug 2019 to Aug 2024

Click Here for more SNC Lavalin Charts.
SNC-Lavalin consortium awarded Evergreen Line rapid transit project in Metro Vancouver

MONTREAL, Jan. 31, 2013 /CNW Telbec/ - SNC-Lavalin (TSX: SNC) is pleased to announce that its consortium, EGRT Construction, has signed a design, build and finance agreement with the Province of British Columbia for the Evergreen Line rapid transit project in Metro Vancouver. EGRT Construction is led by SNC-Lavalin Constructors (Pacific) Inc., the design-build contractor, and includes a joint venture between SNC-Lavalin Constructors (Western) Inc. and Graham Building Service.

The Evergreen Line will link the Tri-Cities area to the existing Millennium Line for the first time through rapid transit. The new system is expected to support community growth and development along the route and near the stations by providing better transit connections between regional centres and downtown Vancouver.

The construction cost for the Evergreen Line is estimated at $889 million. EGRT Construction will be responsible for the construction of elevated and at-grade guideways, a two-kilometre bored tunnel, seven stations, power substations, train operating systems, parking facilities, and a vehicle storage and light maintenance facility.

"We are honoured to have been selected for a project which will greatly enhance Metro Vancouver's world-class mass transit network," said Robert Card, President and CEO, SNC-Lavalin Group Inc. "We are also pleased to be working with the Government of BC to once again deliver a sustainable rapid transit system that will link communities in the northeast sector to downtown Vancouver."

Work on the Evergreen Line will begin in February 2013, with completion expected for the summer of 2016.

SNC-Lavalin is one of the leading engineering and construction groups in the world and a major player in the ownership of infrastructure, and in the provision of operations and maintenance services. Founded in 1911, SNC-Lavalin has offices across Canada and in over 40 other countries around the world, and is currently working in some 100 countries. www.snclavalin.com. 

SOURCE SNC-LAVALIN

Copyright 2013 Canada NewsWire

1 Year SNC Lavalin Chart

1 Year SNC Lavalin Chart

1 Month SNC Lavalin Chart

1 Month SNC Lavalin Chart