We could not find any results for:
Make sure your spelling is correct or try broadening your search.
Share Name | Share Symbol | Market | Type |
---|---|---|---|
Prime Mining Corp | TSX:PRYM | Toronto | Common Stock |
Price Change | % Change | Share Price | Bid Price | Offer Price | High Price | Low Price | Open Price | Shares Traded | Last Trade | |
---|---|---|---|---|---|---|---|---|---|---|
0.05 | 3.45% | 1.50 | 1.48 | 1.53 | 1.50 | 1.45 | 1.45 | 7,910 | 18:10:13 |
Resource Highlights:
Chief Executive Officer, Scott Hicks commented, “We are pleased to announce this significant Resource update on the high-grade gold-silver Los Reyes project. And, we are particularly excited to announce the addition of a high-grade underground resource at Los Reyes. With this update, we have demonstrated significant underground and open pit optionality. The new Resource demonstrates the potential for a high-grade, high-quality milling operation at Los Reyes. Given the impressive results from our drilling campaign since our May, 2023 resource statement, we are also able to highlight the potential of Los Reyes as an underground-only mine: if mined exclusively by underground, we have defined over 1 million gold-equivalent Indicated ounces at just over 4 g/t gold-equivalent and almost 1 million Inferred ounces at well over 3 g/t gold-equivalent (Table 3). The Company will continue its well-funded ‘success-based’ exploration approach with high confidence in further expansion of the resource – both open pit and underground – as all major trends remain open along strike and at depth.”
Scott Smith, Executive Vice President of Exploration, added: “Today’s update quantifies the excellent results of expansion drilling along our three known resource trends, but also highlights three ‘Generative Areas’, Las Primas, Mariposa and Fresnillo, which were not included in our past resource and which remain open in most directions. Ongoing drilling will continue to focus on discovering additional economic ounces across the property with many kilometres of mapped host structures that remain undrilled, as well as high-priority targets that could represent new discoveries within the prolific Los Reyes system (Figure 5). Since the July 17, 2024 drilling cutoff date for this MRE, we have completed an additional 9,000 m to-date across the property.”
Key Details of the MRE:
Open-Pit Milled Indicated and Inferred Resources have grown to 1.27 million ounces gold-equivalent (“AuEq”) (24.7 million tonnes at 1.60 g/t AuEq) and 335,000 ounces AuEq (7.2 million tonnes at 1.45 g/t AuEq), respectively.
New Underground Milled Indicated and Inferred Resources of 664,000 ounces AuEq (4.1 million tonnes at 5.00 g/t AuEq) and 406,000 ounces AuEq (4.1 million tonnes at 3.12 g/t AuEq), respectively.
Open Pit Heap Leach Indicated and Inferred Resources have grown to 261,000 ounces AuEq (20.3 million tonnes at 0.40 g/t AuEq) and 76,000 ounces AuEq (5.9 million tonnes at 0.40 g/t AuEq), respectively.
Table 1 – 2024 Resource Estimate($1950/oz gold price, $25.24/oz silver price, economic-constrained estimate)2
Resource Discussion
The Los Reyes Resource is hosted within low-sulfidation epithermal ‘horsetail’ structures containing significant gold and silver. The current MRE is contained within three major Trends and several ‘Generative Targets’ that have been recently drilled and were not included in last year’s resource estimate (see Figure 1 and Table 2).
The Company believes there is still tremendous potential for expansion of the three main Trends and Generative Targets within the current zones, along strike and down-dip, in addition to the under-explored north and northeast areas of the Los Reyes property (Figure 5). Exploration drilling continues across the property.
Los Reyes contains a high-grade core that, due to its grades, vein widths and continuity, can be mined by either open pit or underground methods. The updated Resource statement reflects a mixed approach that considers open pit versus underground mining on an area-by-area basis (Figure 2). For example, in the Z-T area, it is assumed that the majority of the ounces are mined by open pit, and that the remnant ounces are mined underground (see Figure 3). For the Guadalupe East area, within the Guadalupe Trend, the opposite is assumed – underground mining ounces are prioritized and residual ounces are mined within an economic residual pit4 (see Figure 4).
Table 3 demonstrates a sensitivity at Los Reyes that prioritizes underground economic stope shapes and then considers only the residual economic pits4 that remain. This optionality provides significant flexibility to ensure multiple mining faces and mining approaches, and can provide cost-effective optimization of future mine plans, including operational flexibility in regard to mining sequence and permitting.
To illustrate the high-grade core of the Los Reyes Resource, Table 4 shows the total mill inventories using the open pit resource Au only cutoff (of 0.17 g/t) and a sensitivity at an inflated 0.75 g/t Au only cutoff (for open pit material only). This sensitivity illustrates that at this elevated cutoff, the inventory grade would increase by almost 40%, while maintaining almost 1.6M Indicated and 0.6M Inferred gold-equivalent ounces. Compared to the 2023 MRE, this represents approximately the same number of total contained AuEq ounces, but at almost twice the overall AuEq grade.
All reported Resource ounces are contained within economically constrained pits or underground stope shapes. Geotechnical parameters for open pit slope angles and stope dimension considerations were provided by Knight Piésold following their review of core photos and geotechnical logging.
Kappes Cassiday & Associates has provided a full review of current and past engineering metallurgical testwork and provided the recovery estimates along with benchmarked processing cost estimates for milling and heap leaching in the Resource constraints 2. Prime and previous owners have performed significant gravity, flotation and leach testing, including over 250 bottle roll tests across the three main resource trends. Results indicate strong gold recoveries across the property, especially in mill crush/grind sized samples where assumed average gold recoveries have increased from 93% in the 2023 MRE to 95.6% in the current MRE.
MRE block models were constructed and classified using a drilling cut-off date of July 17, 2024. Open pit estimation was based on 5 x 5 x 5 m selective mining unit (SMU) models and the underground estimate used the Mineable Stope Optimizer algorithm on 2.5 x 2.5 x 2.5 m block models. The selected interpolation methodology for gold and silver in all block models was Inverse Distance Cubed (ID^3). Interpolation and resource classification confidence was based on approximately 191,451 m of drilling completed by Prime and 48,721 m by previous owners. Over 93% of drilling is diamond drill core.
As part of this release, Prime is reporting 21 drill holes (8,110 m of assayed drill results) not previously released that were incorporated into the 2024 MRE (see link to Table 5 below).
This MRE was completed under the supervision of John Sims, a member of the American Institute of Professional Geologists since 2004, an ‘Independent Qualified Person’ as defined by NI 43-101 guidelines, with over 35 years of related experience. Prime will file a NI 43-101 compliant updated Technical Report in support of this resource within 45 days of this release.
Figure 1 –Resource Areas and MRE Drilling
Table 2 – 2024 Resource Estimate by Area($1950/oz gold price, $25.24/oz silver price, economic-constrained estimate)2
Underground Sensitivity3
The Los Reyes project is also amenable to a more substantial underground mining approach. In the following sensitivity table, Los Reyes is assumed to be mined by underground methods, backfilled, and then economically-constrained residual open pits4 are estimated at a 0.17 g/t Au only cutoff.
Table 3 – Sensitivity: Underground Mining Prioritized Scenario($1950/oz gold price, $25.24/oz silver price, economic-constrained estimate)2
Mill Only Cut-off Grade Sensitivity3
The following table illustrates the mill only open pit and underground economic inventories using an open-pit Au only cutoff grade of 0.17 g/t (Resource cutoff for reference) and a higher-grade cutoff of 0.75 g/t (Au only).
Table 4 – Sensitivity: Mill Only at Various Cutoff Grades($1950/oz gold price, $25.24/oz silver price, economic-constrained estimate)2
Figure 2 –Northeast View of Los Reyes Indicating Resource Pits and Stopes
Figure 3 – Cross-section of Z-T (Tahonitas) Area Illustrating Open Pit and Underground Resource Shapes
Figure 4 – Cross-section of Guadalupe East Area Illustrating Open Pit and Underground Resources Shapes
Figure 5 –Current Resource Areas and High-Priority Exploration Target Locations
Discovery Costs
To date, the Company has incurred approximately $CAD 55M in direct exploration expenditures since acquiring the property in 2019. This equates to an estimated discovery cost over the past four years of just over $US 20 per gold equivalent ounce for resources defined up to the cutoff date of July 17, 2024 for this MRE.
2024 Exploration Outlook
Given the results from Prime’s success-based drilling program at mid-year, the Company approved the expansion of its fiscal 2024 program to 50,000m from 40,000m. The drill program will continue to be evaluated according to this success-based approach. This evaluation will also include prioritization of targets based on probability of resource development and generative area discovery potential.
Five drill rigs are currently active on site at Los Reyes, with 2024 exploration focused on:
Next Steps
With the resource areas remaining open along strike and at depth, and multiple high-priority Generative Areas with discovery potential, Prime will continue with its increased 50,000m exploration drilling plan at Los Reyes in 2024. Work will also continue on technical de-risking including metallurgical testwork, geotechnical assessments, mine and processing stream optimization and trade-offs, environmental studies, permit planning, community relations and stakeholder engagement.
Links to Figures:
Links to Tables:
Notes
About the Los Reyes Gold and Silver Project
Los Reyes is a rapidly evolving high-grade, low sulphidation epithermal gold-silver project located in Sinaloa State, Mexico. Since acquiring Los Reyes in 2019, Prime has spent over CAD$55 million on direct exploration activities and has completed over 200,000 metres of drilling.
Exploration is ongoing and suggests that the three known main deposit areas (Guadalupe, Central and Z-T) remain largely open along strike and down dip. Potential also exists for new discoveries where mineralized trends have been identified outside of the currently defined resource areas.
Historic operating results indicate that an estimated 1 million ounces of gold and 60 million ounces of silver were recovered from five separate operations at Los Reyes between 1770 and 1990. Prior to Prime’s acquisition, recent operators of Los Reyes had spent approximately US$20 million on exploration, engineering, and prefeasibility studies.
QA/QC Protocols and Sampling Procedures
Drill core at the Los Reyes project is drilled in predominately HQ size (63.5 millimetre “mm”), reducing to NQ (47.6 mm) when required. Drill core samples are generally 1.50 m long along the core axis with allowance for shorter intervals if required to suit geological constraints. After logging intervals are identified to be sampled, the core is cut and one half is submitted for assay. RC drilling returns rock chips and fines from a 133.35 mm diameter tricone bit. The returns are homogenized and split into 2 halves, with one half submitted for analysis and the other half stored.
Sample QA/QC measures include unmarked certified reference materials, blanks, and field duplicates as well as preparation duplicates which are inserted into the sample sequence. These make up approximately 8% of the samples submitted to the laboratory for each drill hole.
Samples are picked up from the Project by the laboratory personnel and transported to their facilities in Durango or Hermosillo Mexico, for sample preparation. Sample analysis is carried out by Bureau Veritas and ALS Labs, with fire assay, including over limits fire assay re-analysis, completed at their respective Hermosillo, Mexico laboratories and multi-element analysis completed in Vancouver, Canada. Drill core sample preparation includes fine crushing of the sample to at least 70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250-gram split to at least 85% passing 75 microns.
Gold in the drill core is analyzed by fire assay and atomic absorption spectroscopy of a 30 g sample (code FA430 or Au-AA23). Multi-element chemistry is analyzed by 4-Acid digestion of a 0.25-gram sample split (code MA300 or ME-ICP61) with detection by inductively coupled plasma emission spectrometer for a full suite of elements.
Gold assay techniques FA430 and Au-AA23 have an upper detection limit of 10 ppm. Any sample that produces an over-limit gold value via the initial assay technique is sent for gravimetric finish via method FA-530 or Au-GRA21. Silver analyses by MA300 and ME-ICP61 have an upper limit of 200 ppm and 100 ppm, respectively. Samples with over-limit silver values are re-analyzed by fire assay with gravimetric finish FA530 or Au-GRA21.
Both Bureau Veritas and ALS Labs are ISO/IEC accredited assay laboratories.
Additional Notes
Metres is represented by “m”; “etw” is Estimated True Width and is based on drill hole geometry or comparisons with other on-section drill holes; “Au” refers to gold, and “Ag” refers to silver; “g/t” or “gpt” is grams per metric tonne; “mt” refers to millions of metric tonnes; “kt” refers to thousands of metric tonnes; “oz” or “ozs” refers to troy ounces and “koz” refers to thousands of troy ounces; some figures may not sum due to rounding; Composite assay grades presented in summary tables are calculated using a Au grade minimum average of 0.20 g/t or 1.0 g/t as indicated in “Au Cut-off” column of Summary Tables. Maximum internal waste included in any reported composite interval is 3.00 m. The 1.00 g/t Au cut-off is used to define higher-grade “cores” within the lower-grade halo.
Gold equivalent grades are calculated based on an assumed gold price of US$1,950 per ounce and silver price of $25.24 per ounce, based on the formula AuEq grade (g/t) = Au grade + (Ag grade x $25.24 / $1,950). Metallurgical recoveries are not considered in the in-situ grade estimate but are estimated to be 95.6% and 81% for gold and silver, respectively, when processed in a mill, and 73% and 25% respectively when heap-leached. Additional details will be available in the forthcoming associated Los Reyes Technical Report.
Qualified Person
Scott Smith, P.Geo., Executive Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101 and has reviewed and approved the technical content in this news release.
About Prime Mining
Prime is managed by an ideal mix of successful mining executives, strong capital markets personnel and experienced local operators all focused on unlocking the full potential of the Los Reyes Project. The Company has a well-planned capital structure with a strong management team and insider ownership. Prime is targeting a material resource expansion at Los Reyes through a combination of new generative area discoveries and growth, while also building on technical de-risking activities to support eventual project development.
For further information, please visit https://primeminingcorp.ca or direct enquiries to:
Scott HicksCEO & Director
Indi GopinathanVP Capital Markets & Business Development
Prime Mining Corp.710 – 1030 West Georgia St.Vancouver, BC V6E 2Y3 Canada+1(604) 238-1659info@primeminingcorp.ca
Cautionary Notes to U.S. Investors Concerning Resource Estimates
This news release has been prepared in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of the U.S. securities laws. In particular, and without limiting the generality of the foregoing, the terms “mineral reserve”, “proven mineral reserve”, “probable mineral reserve”, “inferred mineral resources,” “indicated mineral resources,” “measured mineral resources” and “mineral resources” used or referenced in this presentation are Canadian mineral disclosure terms as defined in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) under the guidelines set out in the 2014 Canadian Institute of Mining, Metallurgy and Petroleum Standards for Mineral Resources and Mineral Reserves, Definitions and Guidelines, May 2014 (the “CIM Standards”). The CIM Standards differ from the mineral property disclosure requirements of the U.S. Securities and Exchange Commission (the “SEC”) in Regulation S-K Subpart 1300 (the “SEC Modernization Rules”) under the U.S. Securities Act of 1933, as amended (the “Securities Act”). As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multijurisdictional disclosure system, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Standards. Accordingly, the Company’s disclosure of mineralization and other technical information may differ significantly from the information that would be disclosed had the Company prepared the information under the standards adopted under the SEC Modernization Rules.
Forward Looking Information
This news release contains certain “forward-looking information” and “forward-looking statements” within the meaning of Canadian securities legislation as may be amended from time to time, including, without limitation, statements regarding the perceived merit of the Company’s properties, including additional exploration potential of Los Reyes, potential quantity and/or grade of minerals, the potential size of the mineralized zone, metallurgical recoveries, and the Company’s exploration and development plans in Mexico. Forward-looking statements are statements that are not historical facts which address events, results, outcomes, or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company’s management on the date the statements are made, and they involve several risks and uncertainties. Certain material assumptions regarding such forward-looking statements were made, including without limitation, assumptions regarding the price of gold, silver and copper; the accuracy of mineral resource estimations; that there will be no material adverse change affecting the Company or its properties; that all required approvals will be obtained, including concession renewals and permitting; that political and legal developments will be consistent with current expectations; that currency and exchange rates will be consistent with current levels; and that there will be no significant disruptions affecting the Company or its properties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: risks related to uncertainties inherent in the preparation of mineral resource estimates, including but not limited to changes to the cost assumptions, variations in quantity of mineralized material, grade or recovery rates, changes to geotechnical or hydrogeological considerations, failure of plant, equipment or processes, changes to availability of power or the power rates, ability to maintain social license, changes to interest or tax rates, changes in project parameters, delays and costs inherent to consulting and accommodating rights of local communities, environmental risks, title risks, including concession renewal, commodity price and exchange rate fluctuations, risks relating to COVID-19, delays in or failure to receive access agreements or amended permits, risks inherent in the estimation of mineral resources; and risks associated with executing the Company’s objectives and strategies, including costs and expenses, as well as those risk factors discussed in the Company's most recently filed management's discussion and analysis, as well as its annual information form dated March 25, 2024, available on www.sedarplus.ca. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management’s beliefs, estimates or opinions, or other factors, should change.
Infographics accompanying this announcement are available at https://www.globenewswire.com/NewsRoom/AttachmentNg/c272925a-be45-4121-9695-f55aff2130d3https://www.globenewswire.com/NewsRoom/AttachmentNg/39d655db-5791-497b-a648-81654bdf8efehttps://www.globenewswire.com/NewsRoom/AttachmentNg/91d6efe4-077c-4df2-8f86-e1d9157cc779https://www.globenewswire.com/NewsRoom/AttachmentNg/903bd7f5-9325-42b7-bd8a-c6d268bf4463https://www.globenewswire.com/NewsRoom/AttachmentNg/ef6e6cee-d9eb-4d6b-8583-5374cdc7f991https://www.globenewswire.com/NewsRoom/AttachmentNg/a6ef298e-11d6-450b-a870-544e2b15b3e6https://www.globenewswire.com/NewsRoom/AttachmentNg/a593d4d6-c389-4378-b78a-6e04ad76617chttps://www.globenewswire.com/NewsRoom/AttachmentNg/bd3cbb04-d9a3-43a5-abc2-8ac23054806dhttps://www.globenewswire.com/NewsRoom/AttachmentNg/e19bfcd9-20e0-4ecf-8832-5d1436d08c4d
1 Year Prime Mining Chart |
1 Month Prime Mining Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions