Production
Financials
Growth
The Company’s interim consolidated financial statements and associated management’s discussion and analysis for the three and six months ended June 30, 2023 are available for download on the Company’s website and under the Company’s profile on SEDAR+ (www.sedarplus.ca). All amounts are in U.S. dollars unless otherwise indicated.
See Figure 1: Quarterly Production and AISC ChartSee Figure 2: Quarterly Total Ore Processed, Development Metres Advanced and Total Mined Material Chart
John Lewins, K92 Chief Executive Officer and Director, stated, “During the second quarter, the Company achieved a significant number of positives with production growing 43% from Q1 2023 and 18% from Q2 2022; strong cash costs of $597/oz and AISC of $975/oz, well below the annual guidance range of $620-$680/oz for cash costs and $1,180-$1,300/oz for AISC; completion of the Stage 2A Plant Expansion in May, which delivered an immediate and notable boost to metallurgical recoveries; the discovery of a new high-grade zone at the J2 Vein at Judd South; exploration expanding multiple high-grade areas at Kora-Kora South and Judd-Judd South; and the considerable strengthening of our financial position.
Financially, the cash balance grew by $6.9m, even after a near-record $22.0m was spent on property, plant and equipment plus a record $6.3 million on exploration and evaluation expenditures during the quarter. The balance sheet is strong, standing at $95.6m cash and no debt at quarter end. Subsequent to quarter end, our financial outlook also strengthened significantly upon the order of long-lead items and the award of the Lump Sum Fixed Price engineering, procurement, construction and commissioning (“EPC”) contract for the 1.2 mtpa Stage 3 Process Plant. Combined with the long-lead items, K92 has awarded approximately 94% of the process plant capital cost, our largest growth capital item for the expansion, forecasted to represent over half of the growth capital, on a fixed price basis, significantly mitigating potential capital cost increases for the expansion. Other packages for the Stage 3 Expansion are also substantially progressing (see July 24, 2023 press release).
On the process plant, I would like to acknowledge and congratulate the team on site for the completion of the Stage 2A Plant Expansion. Since the end of 2019, the plant’s quarterly throughput has more than tripled, with two expansions, Stage 2 and Stage 2A, completed largely during the pandemic environment. The plant, as noted above, has performed well – our gold and copper recoveries in Q2 were the highest since Q4 2021. In June, the first full month post-commissioning, gold recoveries already achieved the Integrated Development Plan’s recovery parameter of 93%. Optimization work on the plant is underway, and we look forward to discovering its ultimate throughput and recovery potential.
On exploration, we are progressing on multiple fronts, with a total of 11 drills operating at the Kora-Kora South, Judd-Judd South vein systems and the A1 porphyry. We expect to provide another extensive exploration update shortly.”
Mine Operating Activities | ||
Three months ended June 30, 2023 | Three months endedJune 30, 2022 | |
Operating data | ||
Head grade (Au g/t) | 8.2 | 7.2 |
Gold recovery (%) | 92.4% | 91.0% |
Gold ounces produced | 27,405 | 22,934 |
Gold ounces equivalent produced (1) (2) | 30,794 | 26,085 |
Tonnes of copper produced | 692 | 558 |
Silver ounces produced | 34,001 | 25,224 |
Financial data (in thousands of dollars) | ||
Gold ounces sold | 28,141 | 23,674 |
Revenues from concentrate and doré sales | US$51,759 | US$37,356 |
Mine operating expenses | US$9,782 | US$9,310 |
Other mine expenses | US$12,268 | US$9,363 |
Depreciation and depletion | US$7,148 | US$4,496 |
Statistics (in dollars) | ||
Average selling price per ounce, net | US$1,883 | US$1,782 |
Cash cost per ounce (2) | US$597 | US$617 |
All-in sustaining cost per ounce (2) | US$975 | US$893 |
Notes:
(1) | Gold equivalent in Q2 2023 is calculated based on: gold $1,976 per ounce; silver $24.13 per ounce; and copper $3.85 per pound. Gold equivalent in Q2 2022 is calculated based on: gold $1,870 per ounce; silver $23 per ounce; and copper $4.32 per pound. | |
(2) | The Company provides some non-international financial reporting standard measures as supplementary information that management believes may be useful to investors to explain the Company’s financial results. Please refer to non-IFRS financial performance measures on pages 12 and 13 of the Company’s management’s discussion and analysis dated August 9, 2023, available on SEDAR+ or the Company’s website, for reconciliation of these measures. |
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Conference Call and Webcast to Present Results
K92 will host a conference call and webcast to present the 2023 second quarter financial results at 8:30 am (EDT) on Thursday, August 10, 2023.
The conference call will also be broadcast live (webcast) and may be accessed via the following link: https://services.choruscall.ca/links/k92mining2023q2.html
Qualified Person
K92 Mine Geology Manager and Mine Exploration Manager, Mr. Andrew Kohler, PGeo, a qualified person under the meaning of Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and is responsible for the technical content of this news release.
About K92
K92 Mining Inc. is engaged in the production of gold, copper and silver at the Kainantu Gold Mine in the Eastern Highlands province of Papua New Guinea, as well as exploration and development of mineral deposits in the immediate vicinity of the mine. The Company declared commercial production from Kainantu in February 2018 and is in a strong financial position. A maiden resource estimate on the Blue Lake copper-gold porphyry project was completed in August 2022. K92 is operated by a team of mining company professionals with extensive international mine-building and operational experience.
On Behalf of the Company,
John Lewins, Chief Executive Officer and Director
For further information, please contact David Medilek, P.Eng., CFA, President at +1-604-416-4445
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. Such forward-looking statements include, without limitation: (i) the results of the Kainantu Project Definitive Feasibility Study, and the Kainantu 2022 Preliminary Economic Assessment, including the Stage 3 Expansion, a new standalone 1.2 mtpa process plant and supporting infrastructure; (ii) statements regarding the expansion of the mine and development of any of the deposits; and (iii) the Kainantu Stage 4 Expansion, operating two standalone process plants, larger surface infrastructure and mining throughputs.
All statements in this news release that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, although not always, identified by words such as “expect”, “plan”, “anticipate”, “project”, “target”, “potential”, “schedule”, “forecast”, “budget”, “estimate”, “intend” or “believe” and similar expressions or their negative connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors, many of which are beyond our ability to control, that may cause our actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include, without limitation, Public Health Crises, including the COVID-19 Pandemic; changes in the price of gold, silver, copper and other metals in the world markets; fluctuations in the price and availability of infrastructure and energy and other commodities; fluctuations in foreign currency exchange rates; volatility in price of our common shares; inherent risks associated with the mining industry, including problems related to weather and climate in remote areas in which certain of the Company’s operations are located; failure to achieve production, cost and other estimates; risks and uncertainties associated with exploration and development; uncertainties relating to estimates of mineral resources including uncertainty that mineral resources may never be converted into mineral reserves; the Company’s ability to carry on current and future operations, including development and exploration activities; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Company’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the availability and costs of achieving the Stage 3 Expansion or the Stage 4 Expansion; the ability of the Company to achieve the inputs the price and market for outputs, including gold, silver and copper; inability of the Company to identify appropriate acquisition targets or complete desirable acquisitions; failures of information systems or information security threats; political, economic and other risks associated with the Company’s foreign operations; geopolitical events and other uncertainties, such as the conflict in Ukraine; compliance with various laws and regulatory requirements to which the Company is subject to, including taxation; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions, including relationship with the communities in Papua New Guinea and other jurisdictions it operates; other assumptions and factors generally associated with the mining industry; and the risks, uncertainties and other factors referred to in the Company’s Annual Information Form under the heading “Risk Factors”.
Estimates of mineral resources are also forward-looking statements because they constitute projections, based on certain estimates and assumptions, regarding the amount of minerals that may be encountered in the future and/or the anticipated economics of production. The estimation of mineral resources and mineral reserves is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, Forward-looking statements are not a guarantee of future performance, and actual results and future events could materially differ from those anticipated in such statements. Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking statements, there may be other factors that cause actual results to differ materially from those that are anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.
Figure 1: Quarterly Production and AISC Charthttps://www.globenewswire.com/NewsRoom/AttachmentNg/5966eb17-7df2-4779-aceb-0f7714cce4a9
Figure 2: Quarterly Total Ore Processed, Development Metres Advanced and Total Mined Material Charthttps://www.globenewswire.com/NewsRoom/AttachmentNg/1a07f918-0cae-478c-9fad-5e9b3951bd18
1 Year K92 Mining Chart |
1 Month K92 Mining Chart |
It looks like you are not logged in. Click the button below to log in and keep track of your recent history.
Support: +44 (0) 203 8794 460 | support@advfn.com
By accessing the services available at ADVFN you are agreeing to be bound by ADVFN's Terms & Conditions