ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

AR Argonaut Gold Inc

0.42
0.005 (1.20%)
06 May 2024 - Closed
Delayed by 15 minutes
Share Name Share Symbol Market Type
Argonaut Gold Inc TSX:AR Toronto Common Stock
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.005 1.20% 0.42 0.42 0.425 0.43 0.415 0.415 1,855,098 20:59:59

Argonaut Gold Receives Air Quality Permit Modification for Florida Canyon to Allow Installation and Operation of New Conveyin...

28/04/2021 12:00pm

PR Newswire (Canada)


Argonaut Gold (TSX:AR)
Historical Stock Chart


From May 2019 to May 2024

Click Here for more Argonaut Gold Charts.

TORONTO, April 28, 2021 /CNW/ - Argonaut Gold Inc. (TSX: AR) (the "Company", "Argonaut Gold" or "Argonaut") is pleased to announce it has received all necessary regulatory approvals, including a modification to the existing Air Quality permit, to allow for the construction, installation and operation of a new conveying and stacking system at its Florida Canyon mine in Nevada, USA.  The equipment associated with the conveying and stacking system is expected to begin arriving on site in May, and it is estimated that the new system will be operational and ramped up to design capacity during the third quarter of 2021.  The capital associated with the convey and stack project was included in Argonaut's 2021 capital guidance (see press release dated January 19, 2021).    

Argonaut Gold Inc. Logo (CNW Group/Argonaut Gold Inc.)

Pete Dougherty, President and CEO stated: "When we acquired the Florida Canyon mine, we saw the opportunity to eliminate multiple re-handling of ore and significantly reduce the operating cost profile.  The receipt of the Air Quality Permit modification allows us to execute on our plan to lower cost and also raise the production profile at Florida Canyon.  Furthermore, the conveying and stacking system will be operated on grid power and eliminate the need to run diesel haul trucks from the crusher to the leach pads, which we expect will reduce greenhouse gas emissions."

During the fourth quarter 2020, the Company eliminated a re-handle of ore prior to the primary crusher by adding a drop box to the design.  Haul trucks now dump ore directly into a box that feeds into the primary crusher.  Prior to the addition of the drop box, the primary crusher had to be loader fed, which required haul trucks to dump ore on the ground, a dozer to push the ore into a pile and a loader to feed to the primary crusher. 

Currently, once ore goes through the primary and secondary crushers, it is loaded into haul trucks with a front-end loader and delivered to the leach pads via haul trucks.  Argonaut identified potentially significant operating cost savings once it can eliminate the re-handle on the back end of the secondary crushing by switching to a conveying and stacking system to transport crushed ore to the leach pads. 

This change will also free up mobile equipment to transport more ore tonnes from the open pit to the crusher and is expected to increase the annual production profile at Florida Canyon beginning in 2022.

For further information on the Florida Canyon mine, please see the report listed below on the Company's website or on www.sedar.com:

Florida Canyon
Gold Mine

NI 43-101 Technical Report on Mineral Resource and Mineral Reserve Florida Canyon Gold Mine Pershing County, Nevada, USA dated July 8, 2020 (effective date June 1, 2020)

About Argonaut Gold

Argonaut Gold is a Canadian gold company engaged in exploration, mine development and production.  Its primary assets are the El Castillo mine and San Agustin mine, which together form the El Castillo Complex in Durango, Mexico, the La Colorada mine in Sonora, Mexico and the Florida Canyon mine in Nevada, USA.  The Company also holds the construction stage Magino project, the advanced exploration stage Cerro del Gallo project and several other exploration stage projects, all of which are located in North America. 

Argonaut Gold Inc.
Dan Symons
Vice President, Corporate Development & Investor Relations
Phone: 416-915-3107
Email: dan.symons@argonautgold.com

SOURCE Argonaut Gold Inc.

Copyright 2021 Canada NewsWire

1 Year Argonaut Gold Chart

1 Year Argonaut Gold Chart

1 Month Argonaut Gold Chart

1 Month Argonaut Gold Chart

Your Recent History

Delayed Upgrade Clock