ADVFN Logo ADVFN

We could not find any results for:
Make sure your spelling is correct or try broadening your search.

Trending Now

Toplists

It looks like you aren't logged in.
Click the button below to log in and view your recent history.

Hot Features

Registration Strip Icon for monitor Customisable watchlists with full streaming quotes from leading exchanges, such as LSE, NASDAQ, NYSE, AMEX, Bovespa, BIT and more.

F2T Forsys Metals Corp

0.4585
0.00 (0.00%)
09 Dec 2024 - Closed
Realtime Data
Share Name Share Symbol Market Type
Forsys Metals Corp TG:F2T Tradegate Ordinary Share
  Price Change % Change Share Price Bid Price Offer Price High Price Low Price Open Price Shares Traded Last Trade
  0.00 0.00% 0.4585 0.4585 0.4585 0.00 00:00:00

Forsys Reports Interim Drilling Results at Norasa

28/05/2024 12:00pm

GlobeNewswire Inc.


Forsys Metals (TG:F2T)
Historical Stock Chart


From Dec 2023 to Dec 2024

Click Here for more Forsys Metals Charts.

Forsys Metals Corp. (TSX: FSY) (FSE: F2T) (NSX: FSY) (“Forsys” or the “Company”)

Forsys is pleased to provide an update on the Company’s Norasa Uranium project (“Norasa1”) with interim results from its 2024 Resource Extension and Exploration target drilling program at Valencia (ML 149).

Highlights

  • A total of 4,332 metres in 32 boreholes have been completed since the drilling program commenced in February 2024. To date, assays from 21 boreholes have been received and 2,599 down-hole metres have been gamma surveyed.
  • Borehole VA24-022 intersected the widest grade interval, returning an average of 194 ppm U3O8 over a 232 m interval, drilled down plunge from surface, including 43 m at 416 ppm U3O8.

The drilling program strategy is to expand and upgrade the Valencia resources, adjacent to the main pit and to the north and northeast of the pit. Six areas of mineralisation potential were delineated from exploration work that includes aerial photo interpretation; geological mapping; aeromagnetic surveys; airborne radiometric and ground scintillometer surveys; and review of historic drilling data. Drilling aims to assess mineralisation extension potential at two targets in the vicinity of the Valencia Main pit and to test the potential of four targets to the north and east of the pit (see Figure 1).

A total of 60 boreholes for 8,512 metres of combined percussion and diamond drilling have been scheduled for this program. Twenty-two of the first percussion drill holes, including 2 diamond drill extensions, intersected uranium mineralisation. Four PQ diameter diamond holes are underway at Valencia main to retrieve metallurgical samples.

Valencia Main Pit Extension DrillingDrilling has focused on two zones, to date, that have the potential to extend the Valencia Main deposit: at Valencia West and at Valencia South, to depths of up to 380 metres below surface. Completed and planned collar locations are shown with a ground scintillometer background in Figure 1.

The resource extension drill program tested potential targets adjacent to the main pit and includes:

  • Valencia West extension was tested with 18 boreholes, on 80 m spaced sections, over 900 m strike length, and six infill holes immediately west of the Valencia Main pit (Figure 1).
    • Downhole scintillometer survey results were received from 17 of these boreholes.
    • Eighteen of the Valencia West boreholes have been assayed by XRF method and all returned positive confirmation of uranium mineralisation.
  • Valencia South is a down-plunge extension to the main deposit being tested with a grid of eight boreholes. Borehole VA24-022, intersected 232 metres at 194 ppm U3O8 from surface to the end of the percussion drill pre-collar. Mineralisation occurs within the Valencia Main inferred resource shell reported with current, 40 ppm U3O8 cutoff. Depth extensions to the percussion holes are being tested with diamond drill tails.

Valencia Exploration DrillingThe neighbouring exploration target drill program is planned to identify additional resource potential at the Jolie Zone, Valencia East, Bundu, and Valencia North (Figure 1). Twenty-eight boreholes are scheduled, comprising 2,280 metres of drilling across the four targets:

  • Jolie Zone occurs about 600 m north of the Valencia pit and to date three boreholes have been completed. Assay results from all three boreholes confirm uranium mineralisation, with the best intersection of 185 ppm U3O8 over 41 metres in VA24-019.
  • The Valencia East deposit occurs about 500 m northeast of the main pit. Fourteen boreholes are planned to test the existing resource and to potentially extend the deposit.
  • Mineralised granite was discovered about 1 km northeast of the main pit. The zone is named the Bundu Zone, where an initial three boreholes are planned.
  • The Valencia North prospect is located about 1 km north of the Valencia pit and is presently being tested with three boreholes.

Figure 1: Overview map of the 2024 drill program as of 16 May 2024. (ground scintillometer U-survey over GSN airborne Radiometric U data.)

Drilling Progress and HighlightsTable-1 below provides details of the recent boreholes completed:

  • A total of 4,332 metres have been drilled in 32 holes and 2,599 metres of downhole survey are completed. Twenty-two boreholes have been assayed by XRF.
  • Multiple zones of alaskite intrusions were intersected with downhole scintillometer surveys and chemical assays confirming uranium mineralisation in all the probed boreholes, to date.
  • Large-diameter, PQ, diamond drilling continues to retrieve geo-metallurgical sample material from the Valencia Main deposit.
  • The best mineralised intercept is in borehole VA24-022, drilled at Valencia South with 232 metres of continuous intersection, sub-parallel to the main direction of mineralisation, from surface, averaging 194 ppm U3O8 (including 43 m at 416 ppm U3O8 to the bottom of the pre-collar percussion hole).
  • Borehole VA24-019 at the Jolie Zone intersected 41 metres of mineralisation at 185 ppm U3O8.
TargetBHIDFrom (m)To(m)Width (m)eU3O8(ppm)U3O8(ppm)Status
Valencia WestVA24-001698314 291Complete
and:VA24-00192986218 Core sampling
and:VA24-0011231462376 Core sampling
Valencia WestVA24-002718211 190Complete
and:VA24-00210712316 222Complete
Valencia WestVA24-00352597 110Complete
Valencia WestVA24-0041031052162 Core sampling
Valencia WestVA24-005809616 104Complete
Valencia WestVA24-00633352 216Complete
Valencia WestVA24-007617514 161Complete
Valencia WestVA24-00849567 142Complete
and:VA24-0089410814 148Complete
Valencia WestVA24-009356631 117Complete
including:VA24-00944484 200Complete
Valencia WestVA24-010375215 89Complete
Valencia WestVA24-01195647 123Complete
Valencia WestVA24-012395617 170Complete
Valencia WestVA24-01359623 96Core sampling
Valencia WestVA24-014142511 128Complete
Valencia WestVA24-015559035 96Complete
Valencia WestVA24-0169178 89Complete
Valencia WestVA24-01717225 95Complete
Valencia WestVA24-018154227 107Complete
JolieVA24-01914241 185Complete
including:VA24-01961812 336Complete
JolieVA24-020647814 110Complete
JolieVA24-021227149 137Complete
and:VA24-0218410420 174Complete
Valencia SouthVA24-0220232232 194Pre-collar complete
including:VA24-0228414864 246Assays received
includingVA24-02218923243 416to end of pre-collar

Table 1: 2024 drill campaign; highlights reported from boreholes completed (as of 16 May, 2024); Widths are reported as drill hole lengths. Unless otherwise stated, true width is estimated to be approximately 75% of the downhole width.

QAQCRecent (2023-2024) Sampling and Assays

  • Samples were taken from the diamond drill cores and RC chips for geochemical assay guided by the routine downhole radiometric probe results and sent to Trace Elements Analysis Laboratories (Pty) Ltd (“TEA Labs”) at Swakopmund, Namibia for sample preparation and analyses by XRF. For internal quality control purposes TEA Labs has weekly round robins with independent laboratories at Rosh Pinah, Swakop Uranium and Langer Heinrich mines.
  • Forsys employs a QAQC program with Certified Reference Materials (CRMs), blanks, coarse duplicates, and pulp duplicates inserted into each batch of samples. The QAQC insert rate comprises 4 % CRMs using three CRM types with different grades of U3O8; 4 % blanks and 8 % to 10 % duplicates. RC sample batches have three types of duplicates; a field duplicate split at the drill rig; a coarse duplicate split at prescribed intervals at the laboratory; and pulp duplicates, also split at the laboratory. Core samples only have coarse and pulp duplicates split at the laboratory.
  • Four-percent of the samples sent to TEA Labs are sent for check analyses at SGS Laboratories (SGS) in South Africa, which serves as the independent accredited laboratory. The sample results are further validated by comparison with the radiometric scans.

External Check Assay LaboratoryFour percent of the samples sent to TEA Labs are sent for check analyses to SGS Laboratories (SGS) in South Africa; SGS which serves as the independent accredited laboratory. The sample results are further validated by comparison with the radiometric scans.

Qualified Persons Statement for Mineral Resource The information in this release that relates to the Interim Drilling Results for the Norasa Project is based on information compiled or reviewed by Dr Guy Freemantle of The MSA Group (Pty) Ltd., Johannesburg, South Africa. The MSA Group are independent consultants to the Norasa Project, Namibia. Dr Freemantle holds a Bachelor of Science in Geology (2006) and Doctor of Philosophy in Geology (2017) both at the University of the Witwatersrand. He is a member of the Society of Economic Geologists (892905); a Fellow of the Geological Society of South Africa (965392); and is registered with SACNASP (Registration 117527). Dr Freemantle has practiced his profession continuously for 14 years and has sufficient experience and knowledge that is relevant to the style of mineralisation and type of deposits under consideration as well as to the activity that is being undertaken to fulfil requirements of a Qualified Person as per NI 43-101. Dr Freemantle consents to this release in the form and context in which it appears.

About Forsys Metals Corp.

Forsys Metals Corp. (TSX: FSY, FSE: F2T, NSX: FSY) is an emerging uranium developer focused on advancing its wholly owned Norasa Uranium Project, located in the politically and uranium friendly jurisdiction of Namibia, Africa. The Norasa Uranium Project is comprised of the Valencia Uranium deposit (ML-149) and the nearby Namibplaas Uranium deposit (EPL-3638). Further information is available at the Company website www.forsysmetals.com

On behalf of the Board of Directors of Forsys Metals Corp. Richard Parkhouse, Director, Investor Relations. For additional information please contact:

Pine van Wyk, Country Director, Forsysemail: pine@forsysmetals.com

R ichard Parkhouse, Director, Investor Relationsemail: rparkhouse@forsysmetals.com email: info@forsysmetals.comphone : +44 7730493432

Nikolas Matysek, Communications Manager (Canada)email: nmatysek@forsysmetals.com

Forward Looking Statement

Certain information contained in this press release constitutes "forward-looking information", within the meaning of Canadian legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has the potential to". Forward looking statements contained in this press release are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Among those factors which could cause actual results to differ materially are the following: market conditions and other risk factors listed from time to time in our reports filed with Canadian securities regulators on SEDAR+ at www.sedarplus.ca. The forward-looking statements included in this press release are made as of the date of this press release and Forsys Metals Corp disclaim any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation.

                                                                      

1 The Norasa Uranium Project (“Norasa“) is wholly owned by the Company’s 100% subsidiary Valencia Uranium (Pty) Ltd. (“Valencia Uranium”) and comprises the Valencia uranium deposits (held under ML-149) ("Valencia”) and the Namibplaas uranium deposit (under EPL-3638, application for ML-251) (“Namibplaas”), located in the Erongo region of Namibia.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/6ba6af87-83a2-4e0e-a297-b75f620e7093

1 Year Forsys Metals Chart

1 Year Forsys Metals Chart

1 Month Forsys Metals Chart

1 Month Forsys Metals Chart

Your Recent History

Delayed Upgrade Clock